Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -45.00% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 L+₹35,467.47 (6.16%)Admitted-Finance | -41.61% | ₹6.1 L+₹35,467.47 (6.16%) | L2 | Admitted-Finance |
| 3 | L3₹6.8 L+₹1.0 L (18.0%)Admitted-Finance | -35.10% | ₹6.8 L+₹1.0 L (18.0%) | L3 | Admitted-Finance |
| 4 | L4₹7.1 L+₹1.4 L (23.5%)Admitted-Finance | -32.06% | ₹7.1 L+₹1.4 L (23.5%) | L4 | Admitted-Finance |
| 5 | L5₹7.6 L+₹1.9 L (32.7%)Admitted-Finance | -27.04% | ₹7.6 L+₹1.9 L (32.7%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,920
Closing Date
10 Aug 2026, 4:00 pmClosed
Executive Engineer ED-Rajouri
Executive Engineer ED-Rajouri
EDR/21 OF 2026-27 DATED 31-07-2026
2026_PDD_318847_1
EDR/21 OF 2025-26 DATED 31-07-2025
Open Tender
Electrical Works
Turn-key
60 days
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer ED-Rajouri
₹20,920
17 Aug 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | A. Creation of 25Kva Sub Station alongwith HT/LT network and allied works at Cooperative Society sunderbani | - | - | - | - |
| 3 | SITC OF HT Line | - | - | - | - |
| 4 | S.T Pole 9 mtrs long (410-SP33) | 2 | No | 22,999 | ₹45,998 |
| 5 | Galvanisied V cross-arm with top bracket including clamp | 40 | KG | 184 | ₹7,360 |
| 6 | Galvanisied Channel cross-arm including clamps and braces. | 20 | KG | 184 | ₹3,680 |
| 7 | 30 mm2 ACSR Weasel Conductor | 0.3 | Kms | 53,328 | ₹15,998.4 |
| 8 | 11 kv Pin insulators with pins (10KN) | 6 | No | 295 | ₹1,770 |
| 9 | 11 kv Disc insulators with fittings (45 KN) | 3 | No | 710 | ₹2,130 |
| 10 | Earthing Complete by G.I. Pipe 40mm or G.I. Rod 20mm 2.5mtr long through G.I. Strip | 2 | No | 1,300 | ₹2,600 |
| 11 | Cemment Bottoming 1:2:4 mix as per REC standard 0.5 cubic mtr per poles | 2 | No | 3,384 | ₹6,768 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
sbd30.pdf
Tender Documents • 1.55 MB
BOQ_1053069.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .