Loading…
Loading…
Tender Value
₹47.7 L
EMD Value
₹96,800
Closing Date
9 Jul 2026, 3:00 pmDue tomorrow
MUNICIPAL COMMISSIONER (MOTIHARI)
MCO
MEENA BAZAR MOTIHARI
MUNICIPAL COMMISSIONER (MOTIHARI)
MCO
PCC road construction work from Manu Raut's house towards Binita Kumari's house in street no. 01 in Balganga Harijan Toli under Motihari Municipal Corporation area, from main road to Surendra Singh's boundary in street no. 02 and from Sanjeet Sah's house towards Surendra Singh's house in street no. 03.
134320
NIT-13/2026-27-NNM-GR-36
Open Tender
CIVIL
Purbi Champaran
• PAN NO
• GST NO
• REGISTRATION NO
• AFFIDAVITE
• TOOLS & PLANT
• CHARACTER CERTIFICATE
• ITR LAST 3 YEARS DETAILS
• TURN OVER
CIVIL
PERCENTAGE
L1
1
12 documents required · 12 mandatory
₹5,000
Processing Fee: 590
₹96,800
MEENA BAZAR MOTIHARI
20 Jun 2026
20 Jun 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
3 Jul 2026
Bill of Quantity
Name of Scheme:- मोतिहारी नगर निगम क्षेत्रान्तर्गत वार्ड स.-29 मे बालगंगा हरिजन टोली में गली न. -01 में मनु राउत के घर से विनीता कुमारी के घर की ओर एवं गली न .-02 में मैं रोड से सुरेन्द्र सिंह के बाउन्ड्री तक तथा गली न.- में संजीत साह के घर से सुरेन्द्र सिंह के घर की ओर पीसीसी सड़क निर्माण कार्य|
Estimated Cost:- Rs. 4765341
E/M to be Deposited:- Rs.
Cost of BOQ:- Rs.
Time of complition:-
Date of Tender:-
E-Tendaring Fee
Sl No. SOR Item of Works Unit Quantity Rate Amount
1 BCD 2.25(A) Providing E/W filling in Road side Embankment including dressing of sides and ramming of bottoms with all comp. job and direction of E/I. m3 1075.68 411.70 442857.46
2 BCD/ 2.28 Supply and filling in plinth with local sand under floor including watering ramming can soil dating and dressing comp. m3 325.64 287.30 93556.37
3 BCD 11.73 Providing designation 100-A Brick Edge Soling filled with local sand including all comp. job as per building specification and direction of E/I. m2 2137.55 444.80 950782.24
4 BCD 16.42 Cement conctre 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size ) in pavements , laid to required slone and camber in panels as required including consolidation finishing and tamping complete. m3 325.64 4649.00 1513900.36
Add Carriage cost of materials:
5 Add carriage of bricks Nos 114914 919.21 105630.10
6 Add. carriage of local sand m3 389.77 310.47 121011.89
7 Add. carriage of sone sand m3 146.54 2941.19 431001.98
8 Add. carriage of i stone chips m3 276.80 2547.88 705253.18
Add Extra cost of materials:
9 Extra cost of bricks. Nos 114914 359.04 41258.72
10 Extra cost of Cement. MT 104.21 231.56 24130.87
11 Add for sign board & photograph. 0.00
Sub Total: 4429383.17
add extra gst 5.36% 237414.94
Add S. Fee cost of material:
total (B) 98543.38
Grand Total: 4765341
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 13.pdf
NIT • 0.74 MB
Corrigendum.pdf
NIT • 0.14 MB
NIT 13.pdf
NIT • 0.74 MB
BOQ 36.xlsx
NIT • 0.01 MB
Download all tender documents and submit your bid