Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | ₹1.2 L Quoted ₹1.3 L | L1 | Accepted-AOC Lowest bidder and executed the agreement |
| 2 | L2₹1.3 LRejected-AOC | ₹1.3 L | L2 | Rejected-AOC Higher rate hence rejected |
| Sl No | Description | Qty | Unit | MOHAMMED SUHAIL P L2 | MUHAMMED AMEEN P L1 |
|---|---|---|---|---|---|
| 1.00ANNUAL MAINTANANCE | |||||
| 1.00 | OD19270/2025-2026:Removing any type of paint by scrapping, sand papering and preparing the surface smooth etc. complete. (based on DSR data 13.91) | 67.5 | sqm | 27.95 ₹1,886.63 | 27 ₹1,822.50 |
| 1.00 | 13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 8 | sqm | 175.95 ₹1,407.60 | 170 ₹1,360 |
| 1.00 | 13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. | 67.5 | sqm | 74.52 ₹5,030.10 | 72 ₹4,860 |
| 1.00 | OD19274/2025-2026:Conveyance of wooden shutters from the storage shed at Irrigation subdivision office to road side near the site of weir, including loading , unloading, carefully stacking and all labour charges etc. complete. | 1 | set | 5,175 ₹5,175 | 5,000 ₹5,000 |
| 1.00 | OD19272/2025-2026:Fixing wooden shutters carefully in the grooves of Weir Vent ways including conveyance of the planks from road side to Weir site,including labour charges for carrying the planks to each Vent ways and for fixing in position as per the direction of the Deptl. officers at site. Total Qty of shutter required for one vent - 2 x 1.28 x 2.50 x 0.05 = 0.32 m3 (26 No's) | 5 | no | 5,692.5 ₹28,462.50 | 5,500 ₹27,500 |
| 1.01 | OD19271/2025-2026:Supplying and filling the puddle clay between wooden shutters for making the
same water tight including cost, conveyance and all labour charges etc. complete | 4.5 | cum | 1,656 ₹7,452 | 1,600 ₹7,200 |
| 1.01 | OD19273/2025-2026:Engaging Heavy man mazdoor for rectification works while the damages due to intermittent rain. | 20 | Day | 1,210.95 ₹24,219 | 1,170 ₹23,400 |
| 1.01 | OD19275/2025-2026:Removing wooden shutters from vent ways using chain block or any other mechanical device and carry the planks to road side for loading to the vehicle including all labour charges as per the direction of the Deptl. officers at site. Total Qty. of Shutters for one vent - 2x1.28x2.50x0.05=0.32 m3 | 5 | no | 10,246.5 ₹51,232.50 | 9,900 ₹49,500 |
| 1.01 | OD19269/2025-2026:Conveyance of wooden shutters from the road side near the site of weir to the storage shed at Irrigation subdivision office, including loading , unloading, carefully stacking and all labour charges etc. complete. | 1 | set | 4,968 ₹4,968 | 4,800 ₹4,800 |
Tender Value
₹1.2 L
EMD Value
₹2,883
Closing Date
1 Jan 2026, 5:00 pmClosed
Assistant Executive Engineer
O/o of Assistant Executive Engineer Irrigation sub division Malappuram
GENERAL Annual Shutter operation Weir at Anappara Pottammal Kadavu in Koottilangadi Panchayath in Malappuram District for the year of 2025 26 General Civil Work Panchayath in Malappuram District for the year of 2025-26-General Civil Work
2025_Irrig_823656_1
IRR/IA/TR/4417/2023_5_3_2/1
Open Tender
Civil Works - Others
Anappara Pottammal Kadavu
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹2,883
18 Mar 2026
23 Dec 2025
3 Jan 2026
23 Dec 2025
1 Jan 2026
23 Dec 2025
Amount
ANNUAL MAINTANANCE
OD19270/2025-2026:Removing any type of paint by scrapping, sand papering and preparing the surface smooth etc. complete. (based on DSR data 13.91)
13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
OD19274/2025-2026:Conveyance of wooden shutters from the storage shed at Irrigation subdivision office to road side near the site of weir, including loading , unloading, carefully stacking and all labour charges etc. complete.
OD19272/2025-2026:Fixing wooden shutters carefully in the grooves of Weir Vent ways including conveyance of the planks from road side to Weir site,including labour charges for carrying the planks to each Vent ways and for fixing in position as per the direction of the Deptl. officers at site. Total Qty of shutter required for one vent - 2 x 1.28 x 2.50 x 0.05 = 0.32 m3 (26 No's)
OD19271/2025-2026:Supplying and filling the puddle clay between wooden shutters for making the same water tight including cost, conveyance and all labour charges etc. complete
OD19273/2025-2026:Engaging Heavy man mazdoor for rectification works while the damages due to intermittent rain.
OD19275/2025-2026:Removing wooden shutters from vent ways using chain block or any other mechanical device and carry the planks to road side for loading to the vehicle including all labour charges as per the direction of the Deptl. officers at site. Total Qty. of Shutters for one vent - 2x1.28x2.50x0.05=0.32 m3
OD19269/2025-2026:Conveyance of wooden shutters from the road side near the site of weir to the storage shed at Irrigation subdivision office, including loading , unloading, carefully stacking and all labour charges etc. complete.
MOHAMMED SUHAIL P (BID ID -2450266)
Bidder Name
MOHAMMED SUHAIL P
MUHAMMED AMEEN P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1380644.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1380644.xls
BOQ • 0.30 MB
SBDSHTR.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid