Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC MANDI HIMACHAL PRADESH | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹4.4 L Quoted ₹3.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.8 LRejected-Finance GOVT CONT V P O LEDA TEHSIL BALH DISTT MANDI | MANDI | HIMACHAL PRADESH | 175001 | ₹3.8 L | L2 | Rejected-Finance L2 |
Updated dates
Tender Value
₹5.0 L
EMD Value
₹4,991
Closing Date
6 Jan 2026, 11:00 amClosed
Sr.Executiv Engineer
O/o Sr.Executiv Engineer
Tender for prov.proposed 63kva,1 1/.4kv S/stn. Ghour Ghiund har at village upper Lohardi in (E) section Leda UESD,HPSEBL Rewalsar.R-145/2025-26
2025_HPSEB_123378_1
MED/R-145/2025-26
Open Tender
Supply and Erection
O/o Sr.Executiv Engineer
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹4,991
4 Feb 2026
15 Dec 2025
7 Jan 2026
15 Dec 2025
6 Jan 2026
15 Dec 2025
Prov. Muffs with concerete filling
Prov. X-Arm: [Channel Iron (100x50x5mm), Length : 2800 mm X 2Nos]
Prov. X-Arm: [Channel Iron (75x40x4.8 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Prov. MS Angle Iron (50X50x6 mm), Length: 2800 mm x1 Nos for LA's)
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing
Prov. X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
Prov. X-Arm [Channel Iron (100x50x5 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
Prov. MS Angle Iron (35X35x6 mm), Length : 460 x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length 950 mm x 2 Nos for bed knee bracing
Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
Prov. GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
Prov. GO AB Switch Unit
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class 18kV, 5KA (Porcelain Type)
Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Prov. Pin Insulator
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Prov. Pipe Earthing Set
Prov. GI wire 6SWG
Prov.LT Distribution Panel Box with MCCB 100 amp 3P 35kA , ICS =100 %ICU, KIT-KAT 200Amp
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamps (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble
Prov. Aluminium Thimble Copper
Prov. Danger Plate
Prov. Aluminium Paint
Prov. Barbed Wire
Erection of 63 kva Transformer complete in all respect
R.C.C.Muffs for Steel Tubuler Poles
Gi wire 6SWG
CIXArm 100x50x6mm L=4500mm
CIXArm 75x40x4.8mm L=11200mm
CIXArm 100x50x6mm L=9600mm
AI knee bracing 50X5X6MM L=1500MM
MS belt set 50x50x6mm L2125x2
Discs insulator sets
Pin Insulators (Porcelain, 12 kV, 10 kN):
GO AB Switch Unit (11kV, 400A, 25 KA )
D.O Fuse Unit
Eye Hook for earth wire
Stay set complete in all respect including Stay clamp
half clamps
Full clamps
HT Earthing Set
Aluminium Paint
Red Oxide
Nut & Bolts
Barbed Wire
Danger Plate
Erection Charges Of Single pole Sturcture complete in all respect
Erection Charges Of double pole Sturcture complete in all respect
Erection Charges Of Earthing set complete in all respect
Erection Charges Of AAAC/ACSR 30mm2 complete in all respect
Erection Charges Of GI wire complete in all respect
Erection Charges Of Stay set complete in all respect
Manual carrige Road head to site of work complete in all respect avg lead=0.300km
Rcc muff
Egg insulator
Shackle insulator with D-iron
L T Stay set Complete
Earth Knob
Earthing Set complete
Earth wire (GI, 8 SWG)
Stay clamp
Stay Wire 7/3.15mm @ 6.0 kg per stay set
Nuts & Bolts off sizes @ 25 Kg/Km
Spiral PVC Spacer 1 phase
Aluminum paint for steel pole @ 1 Ltr.p/pole
Erection Charges sagging of AAAC/ACSR 30mm2 complete in all respect
Erection of ST pole 8/9mtr long complete in all respect
Erection of LT Stay Set complete in all respect
Erection of Earthing Set complete in all respect
Erection of Earth wire GI, 8 SWG complete in all respect
Manual carrige road head to site of work complete in all respect avg. lead 0.300km
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
145bid.pdf
Tender Documents • 0.61 MB
BOQ_181222.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid