Tender Value
₹4.9 L
EMD Value
₹7,400
Closing Date
14 Jun 2021, 6:00 pmClosed
Asst. Exe.Engineer, Irrigation Sb Dn, Nemmara
Asst. Exe. Engineer, Irrigation Sub Dn, Nemmara.
Pothundy Project 2020-21 Urgent rectification works between ch 4 950km and 5/100km of Thekkethara branch canal for increasing the height of bund of the rocky portion before the aqueduct and clearing the aqueduct.
2021_Irrig_425253_1
01/ET/AEE/PP/2021-22
Open Tender
Civil Works - Canal
Item Rate
180 days
Irrigation Sub Division, Nemmara
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,220
₹7,400
Yes
23 Sept 2021
7 Jun 2021
21 Jun 2021
7 Jun 2021
14 Jun 2021
7 Jun 2021
7 Jun 2021 - 9 Jun 2021
Amount
Canal rectification
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
60.5.1 : DOWEL BARS - Supplying and providing MS dowel bars of size 20 mm dia , 1.5m long (1m in rock and 0.5 m in concrete ) including drilling holes of 25mm dia and filling the gap with cement grout ( 0.25kg/each) etc complete
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
od43520/2020_2021/P1 : Engaging man mazdoors for cleaning and removal of obstructions under culvert as per the directions of the departmental officers at site.
Yakoob Khader
Bidder Name
MATHEW.M.K
Yakoob Khader
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_603468.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .