Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.7 CrAccepted-AOC 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | ₹92.7 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹131.1 CrRejected-Finance 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹131.1 Cr | L2 | Rejected-Finance L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per approval, bidder is Techno Commercially Not Acceptable |
Tender Value
Refer Docs
EMD Value
₹45.0 L
Closing Date
4 Jul 2020, 6:00 pmClosed
Puneet Khanna (Head-Supply Chain Management)
Jacobs Engineering India Private Limited, New Energy House, Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
LSTK-A Utility Boiler Package
2020_REFHQ_114787_1
44AC9100-001-170018
Open Tender
Lump Sum TurnKey
480 days
IOCL, DHUMAD, INDIA
Please refer Tender documents.
10 documents required · 10 mandatory
₹45.0 L
Yes
JACOBS Engineering India Private Limited
7 Feb 2021
18 Mar 2020
6 Jul 2020
18 Mar 2020
4 Jul 2020
21 May 2020
28 Apr 2020
Amount
Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Topography Survey and Soil Investigation, Site enabling jobs including area filling and grading upto FGL, Total Procurement (including chemicals, first fill, consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance which will be obtained by M/s IOCL),pre commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities , Final invoice/ billing & document hand over and handing over of the facilities with Final and “As Built” documentation for LSTK-A Package comprising of Utility Boiler Package of Acrylic/Oxo-Alcohol Project at IOCL Dumad Complex, Near Gujarat Refinery
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
ENGINEERING PRICE ( DESIGN AND DETAILED ENGINEERING OF UTILITY BOILER PACKAGE AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION/INSTALLATION, START-UP, PRECOMMISSIONING, COMMISSIONING, PGTR, TRAINING PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
CGST&SGST/IGST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
CGST&SGST/ (CUSTOMS DUTY,SWS AND IGST / (CGST+SGST)) ON SUPPLY OF IMPORTED GOODS (PART BREAK-UP OF SP-1)
CGST&SGST/IGST ON SUPPLY OF SERVICES (PART BREAK-UP OF SP-2)
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ALL TYPES OF ANALYSERS (including GCs) / AMADAS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DCS (Supplied by Contractor) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for MMS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITY CONSUMPTION FOR UTILITY BOILER PACKAGE AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR UTILITY BOILER PACKAGE AS PER MR
GUARANTEED RLNG CONSUMPTION FOR UTILITY BOILER PACKAGE AS PER MR
Isgec Heavy Engineering Ltd
Isgec Heavy Engineering Ltd
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid