| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC KANDARAPALLI KADULICITY ROAD KOCHARA | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ST GEORGE CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00DWSS | ||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 75 | hour | 335.17 ₹25,137.75 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 13.61 | cum | 249.9 ₹3,401.64 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 13.61 | cum | 127.08 ₹1,729.81 Lowest |
| 1.00 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 13.61 | cum | 227.94 ₹3,102.72 Lowest |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 45.22 | sqm | 299.69 ₹13,550.78 Lowest |
| 1.01 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | 9.04 | cum | 9,551.94 ₹86,378.19 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 850.28 | kilogram | 109.05 ₹92,723.58 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 236.19 | kg | 173.06 ₹40,875.04 Lowest |
| 1.01 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 26 | sqm | 245.36 ₹6,379.36 Lowest |
Tender Value
₹3.6 L
EMD Value
₹8,896
Closing Date
20 Aug 2025, 5:00 pmClosed
RAJI MOL RAJU
OFFICE OF THE ASSISTANT ENGINEER LID EW SECTION CHAKKUPALLAM GP
RE - TENDER - Annual Plan-CHPM 2024-25 - (PRO.NO - 268)-KUNGIRIPPETTY DRINKING WATER PROJECT POND MAINTENANCE AND OTHER FACILITIES
2025_LSGD_784471_1
2/AE/LIDEW/CHPM/2025-26
Open Tender
Civil Works - Water Works
Item Rate
CHAKKUPALLALLAM GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹785
Yes
₹8,896
Yes
24 Nov 2025
11 Aug 2025
22 Aug 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1289250.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .