Tender Value
₹9.7 Cr
EMD Value
₹6.4 L
Closing Date
9 Feb 2026, 3:00 pmClosed
Proposed 1 X 28448 SK (26733 SQ) Clear span composite girder & 2 x 16460 SK (15467 SQ) PSC girder superstructure ROB in lieu of Level crossing no. 41 (Mambarakanniyil) at Railway Km 118/000-100 between Kayamkulam Junction & Ochira stations.
02-CE-CN-ERS-2026-OT~SR
02-CE-CN-ERS-2026-OT
Open
Works - General
18 Months
Kollam, Kerala
₹0
₹6.4 L
9 Feb 2026
15 Jan 2026
26 Jan 2026
A-Provides for the items of works that are covered by the Southern Above/
B-Provides for the items of works that are covered by the Southern Above/
C-Provides for the items of works that are covered by the Southern Above/
D-Provides for the items of works that are covered by the Southern Above/
E-Provides for the items of works that are covered by the Southern Above/
F-Provides for the items of works that are covered by CPWD DSR 2021
G-Provides for items of works that are not covered by the Southern
H-Provides for items of works that are not covered by the Southern
I-Provides for the items of works that are covered by the Southern Above/
J-Provides for the items of works that are covered by the Southern Above/
as corrected by and up to date applicable to TRIVANDRUM & PALAKKAD DIVISION.
For bridge work including earthwork excavation, PCC & RCC work, design of foundation &
miscellaneous works.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
S No. Item No Description of Item Unit Qty Rate Amount
E m b a n k m e n t by clearing,
grubbing, stripping top soil
(average 150 mm) and stacking
beyond foundation area,
thereafter ploughing and
pulverizing 150 - 200 mm of top
of soil with tractor trolley,
mixing water to achieve OMC
with water sprinkler or left for
natural drying, as required, and
compaction with vibratory roller
of suitable capacity to achieve
98% MDD for laying first layer
of soil for embankment
Felling trees of girth (measured
at a height of 1.0 m above
ground level) including leading
and stacking of material within
100m. Note : 1. When stumps
are grubbed up in addition, the
rates shall be doubled for trees
cut and grubbed 2. Payment for
grubbing shall only be made
where specially ordered. 3.
Grubbing shall be ordered only
where it is essential to remove
the stumps, including the roots,
as per specification. 4.
Grubbing shall include removal
of roots of trees and saplings to
a depth of 60cm below ground
level or 30 cm below formation
level or 15 cm below sub grade
level, whichever is lower.
penetration test as per IS:2131
at approximate1.5m intervals in
bore holes, as directed by the
Engineer in charge
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the
bridges, retaining walls etc.
including setting out, dressing
of sides, ramming of bottom,
getting out the excavated
material, back filling in layers
with approved material and
consolidation of the layers by
ramming and watering etc.
including all lift, disposal of
surplus soil up to a lead of
300m, all types of shoring and
strutting with all labour and
material complete as per
drawing and technical
specification as directed by
Engineer in charge. Note: This
item will be used for excavation
work in connection with other
miscellaneous works also like
side drains, foundation for OHE
masts and other miscellaneous
structures in connection with
Gauge Conversion, Doubling,
Providing and laying in position
Plain cement concrete of
specified Nominal Mix for
miscellaneous works like side
drains, foundation for OHE
masts and other miscellaneous
structures excluding the cost of
C e m e n t , centering and
shuttering - All work up to plinth
(zone-III): 6 graded stone
aggregate 40 mm nominal
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
9 022040 Providing and laying in position cum 220.00 4994.99 1098897.80
machine batched, machine
mixed and machine vibrated
Cement Concrete of specified
grade as per approved Design
Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or
RMC from approved plants)
using 20mm graded crushed
stone aggregate and coarse
sand of approved quality in RCC
raft foundation & Pile cap
including finishing, using
Plasticiser in approved
proportions (as per IS:9103), to
modify workability without
impairing strength and
durability complete as per
specifications and direction of
the Engineer in charge. Note: 1.
Payment for cement,
reinforcement and shuttering
shall be made extra under
relevant item. 2. Plasticiser
shall invariably be used in
approved proportion to increase
workability with minimum
possible quantity of cement for
all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not
using plasticiser at the stage of
Mix Design and in that case
deduction shall be made as per
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Providing and laying in position
machine batched, machine
mixed and machine vibrated
Cement Concrete of specified
grade as per approved Design
Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or
RMC from approved plants)
using 20mm graded crushed
stone aggregate and coarse
sand of approved quality for the
following Reinforced cement
concrete structural elements up
to height of 9.0 m from
foundation top level, including
finishing, using Plasticiser in
approved proportions (as per
IS:9103), to modify workability
without impairing strength and
durability complete as per
specifications and direction of
the Engineer in charge. Note: 1.
Payment for cement,
reinforcement and shuttering
shall be made extra under
relevant item. 2. Plasticiser
shall invariably be used in
approved proportion to increase
workability with minimum
possible quantity of cement for
all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not
using plasticiser at the stage of
Mix Design and in that case
deduction shall be made as per
Inspection Platform & Pedestal
over Pier cap, Fender wall,
Diaphragm wall etc.
level, Dirt wall/ ballast wall at
formation level
Centering and shuttering
including strutting, propping
etc. and removal of form for :
structures, e.g. pier, abutment,
wing wall, retaining wall, RCC
box type foundations,
Abutment cap, Pier Cap,
Inspection Platform & Pedestal
over Pier cap, Fender wall,
Diaphragm wall etc. up to 5m
above ground level
structures, e.g. slabs, I-girders,
T-girders, Box girders etc. up to
5m above ground level.
16 025033 Extra for additional height over Sqm 1440.00 135.65 195336.00
wherever required with
adequate bracing, propping etc.
over initial height of 5 metres
for every additional height of 1
metre or part thereof.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Providing and fixing in position
of standard preformed sealed
and slab type or strip seal
elastomeric type expansion
joints for Railway bridge or
Road Over Bridges as per
approved drawings and latest
MORTH/IRC specifications
complete in all respect as
directed by Engineer in-charge.
Providing and fixing in position
GI Drainage Spouts of required
length with Grating in RCC slab
and filling bitumen along kerb
as shown in drawing with
contractor's pipes, bitumen,
tools, equipment, lead, lifts etc.
complete as per specifications
and as directed by Engineer in-
19 052140 Providing and fixing of Drainage Metre 50.00 533.10 26655.00
Spouts of 110mm UPVC Type A
ISI marked (Working pressure 4
kg/sqcm) using suitable clamps
and adhesive etc., complete.
Designing and developing
Detailed structural and working
Drawings for following items for
ROB/RUB/Bridge based on
Railway's approved GADs, duly
collecting necessary data from
Railways and R&B authorities,
duly designing members and
submission of check plot duly
getting proof-checked by
Railway approved institutes,
submitting for Railway's
verification and approval,
making corrections duly
incorporating suggestions in
drawings/designs, further
submission of original in
transparent film paper and soft
copy (CD) for Railways approval
etc. with contractor's technical
expertise and instruments,
labour, consumables,
repeatedly attending till final
approval etc., complete as
directed by Engineer in-charge.
piers/abutments
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
barrier along with winch
assembly and other
components like boom, fringes,
locking arrangements,
pedestal, boom rest, locking
rods/wires, pulley stakes, turn
out wheels, 'A' base and other
materials connected with
functioning of lifting barrier,
removing engineering
indicators on track and level
crossing road signages without
any damage including
demolishing concrete base of
existing structures, filling,
ramming and levelling the
ground disturbed during
demolition, clearing debris and
stacking all released material in
a neat and countable manner
and clear of infringements, as
directed. Note: Barriers on both
sides of level crossing
constitute one set.
rails supplied by Railways with
verticals provided at every
1.5m interval, height of
barricade being up to 1.5m
above ground / termination
level and one or more row of
horizontal rail, duly cutting rails
and drilling holes as required,
assembling necessary
accessories to required length,
including earthwork excavation
for foundation, fixing posts in
cement concrete 1:3:6 base of
size 0.45m x 0.45m x 0.60m
and one coat of red oxide
painting of steel work. Note: 1.
Excavation and concrete work
will be paid separately. 2. Rail
shall be made available within
Hiring of machinery for minor
miscellaneous works for short
duration including
operator/driver, fuel, lubricants
and consumable. The
contractor shall arrange all
statutory permits as required
by rules and regulations
prevailing in the area of work.
Payment shall be made for
actual working hours at site.
or similar with minimum 1.10
cum bucket capacity
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the
bridges, retaining walls etc.
including setting out, dressing
of sides, ramming of bottom,
getting out the excavated
material, back filling in layers
with approved material and
consolidation of the layers by
ramming and watering etc.
including all lift, disposal of
surplus soil up to a lead of
300m, all types of shoring and
strutting with all labour and
material complete as per
drawing and technical
specification as directed by
Engineer in charge. Note: This
item will be used for excavation
work in connection with other
miscellaneous works also like
side drains, foundation for OHE
masts and other miscellaneous
structures in connection with
Gauge Conversion, Doubling,
022014 for executing the work
under water and/or liquid mud
to compensate all additional
arrangements including
pumping out water as required.
Note: The extra percentage rate
is applicable only for the
quantity of work executed
under water. [RATE = 20%]
Schedule B-Provides for the items of works that are covered by the Southern Railway USSOR 2021
as corrected by and up to date applicable to TRIVANDRUM & PALAKKAD DIVISION.
For supplying, fabricating, assembling of steel composite girder, metalizing of steel work, bearing
work and other miscellaneous works.
S No. Item No Description of Item Unit Qty Rate Amount
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Supplying, fabrication,
assembling of all types of steel
girders of specified spans with
structural steel conforming to
Quality "B0" Grade Designation
E 2 5 0 conforming to IS:2062,
erection / slewing / end
launching of steel girders with
cranes or any other approved
launching methods as per site
conditions (not requiring traffic
block) on sub-structure
including provision of trolley
refuges etc., complete as per
approved Q A P and drawings
conforming to IRS-B1-2001 and
other relevant codes and
specifications. Note: 1. Detailed
fabrication and erection
drawings & launching
methodology will be prepared
by the contractor and got
approved from Railway. 2. The
rate is all inclusive including
launching in position, complete
in all respect except cost of (i)
Painting / Metalising; (ii)
Bearings & (iii) HSFG bolts
which shall be paid extra under
relevant item. 3. The payment
shall be made on the
theoretical weight of main
components and gusset plates
only. 4. Payment Schedule: (i)
Receipt of material at site: 40%
(ii) Fabrication of girders: 20%
(iii) Erection/Launching: 20%
(iv) Completion in all respects:
Girder/Composite Girder (Steel
2 041013 Extra for using steel conforming MT 150.00 -5351.75 -802762.50
t o Grade Designation E350
instead of Grade Designation
E250 of Quality "B0" as per IS:
conforming to Quality "BR"
instead of Quality "B0" of Grade
designation E250 as per
of any dia and any length with
suitable nuts including DTI
washers conforming to IRS-B1-
2 0 0 1 f o r bridges and steel
structures with contractors
labour, tools and plants and
lead and lift etc., complete.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Metallizing of steel work of
girders with sprayed aluminium
after surface preparation by
Sand/grit blasting, followed by
one coat of etch primer
(IS:5666) & one coat of Zinc
Chrome primer (IS:104) and
two coats of aluminium paint
(IS:2339) with all labour, T&P
and material as a complete job
duly conforming to all relevant
specifications and process
given under Clause 39 of IRS-
B1-2001. Note: Nominal
Thickness of sprayed
Aluminium coating shall be 150
microns. DFT of Zinc chrome
primer shall be 25-30 microns
a n d DFT of each coat of
Aluminium paint shall be 12-14
fixing access ladders,
inspection platforms, Trolley
refuges etc., on bridges with
structural steel conforming to
IS:2062 including welding /
bolting, priming painting with
one coat of ready mixed paint
of Zinc Chromate (IS:104) with
DFT of 25-30 microns followed
by one coat of Zinc Chrome Red
Oxide (IS:2074) with DFT of 25
microns with all material,
labour, T&P as a complete job.
Note: Painting shall be paid
separately under relevant item.
Design, supply, fitting and
fixing in position true to line
and level POT-PTFE bearing of
200 MT Capacity, consisting of
a metal piston supported by a
disc or un reinforced elastomer
confined within a metal
cylinder, sealing rings, dust
seals, PTFE surface sliding
against stainless steel mating
surface, complete assembly to
be of cast steel / fabricated
structural steel, metal and
elastomer elements complete
AISI:304, AISI:316, IS:6911,
5400, Bridge Code and as per
approved drawing and
Technical Specifications. The
design of the bearings shall be
submitted by the
manufacturers / contractor and
got approved from Railway
before fixing. Test report after
inspection of the bearings shall
be submitted and got approved
before the materials are lifted
from the manufacturer
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Surface preparation of steel
work of bridge plate/composite
girders by cleaning with
scrappers and/or wire brushes
to remove all rust and loose or
perished paint to prepare
perfectly clean & dry bare
metal surface free from all
dirt/foreign material & ready for
initial coat of paint for new or
existing steel girders. Rate
includes cost of labour,
consumables, brushes, tools &
plants, ladders, scaffoldings,
jhoola, hanging scaffolding
Painting of cleaned
plate/composite bridge girders
including all scaffolding along
with provision of Jhoola /
hanging scaffolding ladders etc.
where required.
Chromate conforming to IS:104
with DFT of 25-30 Microns
followed by one coat of Zinc
Chromate red oxide conforming
to IS:2074 DFT of 25 Microns
paint in dual containers
conforming to IS:2339 with DFT
of 15 - 20 Microns for each coat.
Schedule C-Provides for the items of works that are covered by the Southern Railway USSOR 2021
as corrected by and up to date applicable to TRIVANDRUM & PALAKKAD DIVISION.
For boring, providing and installation of bored cast in-situ RCC piles & its testing, permanent casing
pipe for piles etc.
S No. Item No Description of Item Unit Qty Rate Amount
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Boring, providing and
installation of bored cast in-situ
Reinforced Cement Concrete
piles of specified diameter and
length below pile cap of
specified grade with Design Mix
Cement Concrete, using 20mm
graded crushed stone
aggregate and coarse sand of
approved quality, to carry a
safe working load not less than
specified, concreting by
machine batching, machine
mixing, scaffolding, using
Admixture in approved
proportion (as per IS:9103),
placing with tremie pipe,
chipping off of pile top to
remove laitance concrete above
cut off level etc., pumping and
bailing out water, by percussion
drilling using Direct Mud
Circulation (DMC) or Bailor and
Chisel technique by tripod and
mechanical Winch machine,
complete in all respect as per
approved drawing, specification
and direction of the Engineer in
charge. N o t e : 1. Payment for
only cement, reinforcement and
permanent casing pipe (if any )
shall be made extra. 2. Length
of the pile for payment shall be
measured up to the bottom of
RCC pile cap. 3. Plasticiser shall
invariably be used in approved
proportion to increase
workability with minimum
possible quantity of cement for
all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not
using plasticiser at the stage of
Mix Design and in that case
deduction shall be made as per
installing permanent casing
pipe for bored piles for all
diameters with specified
thickness of steel plate
including all labour, materials,
tools & complete as per
approved drawing &
specifications complete in all
respect as per the direction of
Engineer in charge. Note:
Payment shall be made as per
the weight of circular plate of
casing pipe only.
Extra for chiselling in addition to
boring of piles, if chiselling is
required to be resorted to in
hard rock or big stone boulders
larger than 30cm, manually or
by any other means.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Conducting load test of a single
pile up to specified capacity in
accordance with IS:2911 (Part-
IV) including installation of
loading platform and
preparation of pile head or
construction of test cap and
dismantling of test cap after
test etc. with all labour,
material, tool & plants,
equipment, machinery, etc.
complete as per drawing and
specification, as directed by the
and up to 250 T capacity pile
ton in pile capacity or part
thereof over 250 ton
ton capacity up to 250 ton
integrity testing of piles with
contractor's men, materials and
machines. The rate includes
cost of Inspection of site,
preparation of pile head and
any other unforeseen cost
required for the test,
submission of reports in
triplicate as per satisfaction of
the Engineer in Charge.
Schedule D-Provides for the items of works that are covered by the Southern Railway USSOR 2021
as corrected by and up to date applicable to TRIVANDRUM & PALAKKAD DIVISION.
Item- 4 For PSC girder super-structure & related works.
S No. Item No Description of Item Unit Qty Rate Amount
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Providing and laying in position
machine batched, machine
mixed and machine vibrated
Cement Concrete of specified
grade as per approved Design
Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or
RMC from approved plants)
using 20mm graded crushed
stone aggregate and coarse
sand of approved quality for
cast in-situ Prestressed (Post-
tensioned) concrete girder / Box
girders/Slabs for different spans
including finishing, using
Plasticiser in approved
proportions (as per IS:9103), to
modify workability without
impairing strength and
durability complete as per
d r a w i n g s , specifications and
direction of the Engineer in-
charge. Note: 1. Payment for
Staging, Shuttering, Cement,
reinforcement, HTS cables,
sheathing, anchorage cones,
stressing of cables and grouting
of the ducts shall be made
extra under relevant items. 2.
Plasticiser shall invariably be
used in approved proportion to
increase workability with
minimum possible quantity of
cement for all grade of Design
Mix Concrete unless it is
specifically approved citing
reasons at the stage of Mix
Design and in that case
deduction shall be made as per
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
position to exact design
profiles, H.T.S. cables of all
classification made from Low
Relaxation strands conforming
to IS:14268- latest version in
Prestressed (Post-tensioned)
Concrete girders/slabs etc.
including supplying, cutting,
making into cables with
necessary spacers, colour
coding, protecting with water
soluble oil at all time, anchoring
of cables, supplying and placing
spiral corrugated type
galvanized metal steel ducts
sheathing made up of Cold
Rolled Cold Annealed (CRCA)
mild steel conforming to IS:513
of required diameter/ thickness,
vent pipe, placing, bending,
routing, fixing, stressing &
grouting of cable ducts with
cement grout, Anchorage sets
in required number with
provision for future prestressing
if any including all lead and lift
with contractor's own materials,
labour, equipments etc.
complete as per drawings &
specifications. Rate also
includes covering anchorage
pads with epoxy mortar of
approved quality to avoid
corrosion. Cement for grouting
to be paid separately. Payment
shall be made in terms of
weight of HTS cables as per
3 031060 Extra for using HDPE sheathing Metre 150.00 110.38 16557.00
in place of CRCA sheathing
staging for cast in-situ PSC
girders/slabs up to 10.5m
height from bed level up to
soffit of girder/slab with all
contractors materials,
machinery, tools and plants,
transportation complete in all
respects required for casting
and removal of the same after
completing the work and
restoring the site to original.
Note: The payment for staging
shall be made on the cubical
quantity of concrete of main
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
supplying and fixing in position Centimetre
elastomeric bearing true to line
and level conforming to
IS:3400, IS:226, BS-5400 under
prestressed concrete girders/
Steel Girders, for Pre-cast as
well as cast-in-situ girders as
per approved drawing. The rate
shall include cost of load test of
one no. bearing from Railway
approved firms and all fixing
materials, equipments,
machineries, labour, taxes,
loading, unloading, leading,
lifting etc. complete. Rates
include getting the drawing
approved from Railway and cost
of inspection during
manufacturing from railway
approved organization.Note : 1.
The rate is for finished item
complete and paid only after
fixing in position below the
girder. 2. The volume shall be
as given in the drawing and no
deduction shall be made for
inserted steel plates etc.
Schedule E-Provides for the items of works that are covered by the Southern Railway USSOR 2021
as corrected by and up to date applicable to TRIVANDRUM & PALAKKAD DIVISION.
Item- 5 For Permanent-way works.
S No. Item No Description of Item Unit Qty Rate Amount
Recoupment of ballast in
running line with railway's
stone ballast from existing
stacks available along
alignment either on top of
cutting or on cess or at toe of
bank by head leads or by any
other means and spreading to
make up deficiency in the
required profile with
contractor's labour, tools &
plants, as directed by Engineer-
in-charge. Note: Payment shall
be made based on ballast stack
each additional average lead of
50m or part thereof when total
average lead exceeds 50m, but
up to 250m. Note: This item
may be used only in
exceptional circumstance under
prior order on record.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
as per procedure prescribed in
latest edition of IRPWM
including cess dressing on both
sides of track. The work will
include removing excess ballast
from track and putting the
same in crib and shoulder by
leading to a maximum of 50m
including crossing of track,
deweeding on ballast section
etc and as directed by
Engineer-In charge.
Providing Caution Watchman at
a location where caution order
is imposed and ensuring to be
on continuous vigil and exhibit
necessary hand signals to the
trains for their passage over
caution spot. Note: 1)
P r e s c r i b e d protection
equipment shall be supplied by
Railways and the same shall be
returned after work is over. 2) If
Contractor fails to post
watchman at any time during
one day, penalty at double the
accepted rates will be levied
a n d 3) The watchman
nominated by the contractor
will be screened for suitability
as per Railway norms.
Through packing of track, as
per procedure prescribed in
latest edition of Indian Railways
Permanent Way Manual
Sleeper Density of 1540
Sleepers/Km or more
Loading of 52kg / 60kg PSC
normal line and special sleepers
up to 2.75 metre length in
Depot / Station / Mid-section
between stations in a neat
manner to departmental
material train (DMT) or
contractor's / Railway's
Truck/Trailer with crane or any
other means including crossing
of one track with free lead up to
250 metre and lift up to 5
metre, if required with
contractor's labour, tools &
plants, machinery,
consumables etc. Note: In case
of any damage to sleeper
during loading, penalty @ 50%
of the all inclusive cost of
sleeper shall be levied.
traffic block where handling by
mechanical means is not
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Transportation of Rails,
sleepers, switches, crossings,
SEJs and Glued Joints by road
vehicles for different leads.
N o t e : 1 . Lead shall be the
shortest motorable road length
between the points of loading
and unloading. 2. Loading and
unloading shall be paid extra
under relevant items.
beyond 150 Km over item no.
Unloading of 52kg / 60kg PSC
line and special sleepers up to
2.75 metre length in Depot /
Station / Mid-section between
stations in neat manner for
Railway usage from
departmental material train
(DMT) or contractor's /
Railway's Truck/Trailer with
crane or any other means
including crossing of one track
and lead up to 250 metre & lift
up to 5 metre with contractor's
labour, tools & plants,
machinery, consumables etc.
Note: In case of any damage to
sleeper during loading, penalty
@ 50% of the all inclusive cost
of sleeper shall be levied.
Spreading of New / SH , normal
o r wider base PSC sleepers
from stack along track on either
side for different leads with all
lifts by any means.
additional lead of every 500m
or part thereof beyond 500 m
of Level Crossing, blocks, bolts
& nuts and stacking these in a
countable manner near LC, free
from any infringements as
directed by Engineer in-charge.
13 181030 Dismantling exiting Rail Height Each 2.00 4365.86 8731.72
Gauge carefully and stacking
the released material in
countable manner, free from
any infringements as directed
by Engineer in-Charge including
removal of cement concrete
foundation and making surface
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
barrier along with winch
assembly and other
components like boom, fringes,
locking arrangements,
pedestal, boom rest, locking
rods/wires, pulley stakes, turn
out wheels, 'A' base and other
materials connected with
functioning of lifting barrier,
removing engineering
indicators on track and level
crossing road signages without
any damage including
demolishing concrete base of
existing structures, filling,
ramming and levelling the
ground disturbed during
demolition, clearing debris and
stacking all released material in
a neat and countable manner
and clear of infringements, as
directed. Note: Barriers on both
sides of level crossing
constitute one set.
Guard Rail by cutting and
bending to required shape &
RDSO's approved drawings.
Note: (1) Rails shall be supplied
by Railways. (2) One set
consists of two rails i.e. both left
portion of guard rails of any rail
section over PSC sleepers
including fixing of with all
fittings, including leading of
rails and fittings, squaring and
adjusting spacing of sleepers as
required, providing nose blocks
duly cutting wooden blocks
supplied by railways and fixing
it with bolts of 16mm dia as
directed complete and finished
as per RDSO's approved
d r a w i n g . Note: 1.One set
consists of LH & RH side rails of
one end. 2.Required P.Way
fittings will be supplied at SSE
Schedule F-Provides for the items of works that are covered by CPWD DSR 2021 with all correction
slips issued up to date.
For RCC & PCC & relevant items related to parapet wall, compound wall, cable duct, tubular steel
work, dismantling work & miscellaneous works.
S No. Item No Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
uprooting of rank vegetation,
grass, brush wood, trees and
saplings of girth up to 30 cm
1 measured at a height of 1 m
above ground level and
removal of rubbish up to a
distance of 50 m outside the
periphery of the area cleared.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
2.32 Clearing grass and removal of Sqm 500 7.4 3700
the rubbish up to a distance of
50 m outside the periphery of
the area cleared.
4.0 CONCRETE WORK
CEMENT CONCRETE (CAST IN
Providing and laying cement
concrete in retaining walls,
return walls, walls (any
thickness) including attached
pilasters, columns, piers,
abutments, pillars, posts, struts,
4.2 buttresses, string or lacing
courses, parapets, coping, bed
blocks, anchor blocks, plain
window sills, fillets, sunken floor
etc., up to floor five level,
excluding the cost of centering,
shuttering and finishing:
sand (zone-III) derived from
natural sources : 3 graded
stone aggregate 20 mm
nominal size derived from
natural sources).
(zone-III) derived from natural
4 sources : 4 graded stone
aggregate 20 mm nominal size
derived from natural sources)
Centering and shuttering
including strutting, propping
etc. and removal of form work
4.3.1 Foundations, footings, bases for Sqm 200 307.95 61590
4.3.2 Retaining walls, return walls, Sqm 300 669.55 200865
walls (any thickness) including
6 attached pilasters, buttresses,
plinth and string courses fillets,
kerbs and steps etc.
REINFORCED CEMENT
5.9S FORM WORK
Centering and shuttering
5.9 including strutting, propping
etc. and removal of form for
5.9.2 Walls (any thickness) including Sqm 500 669.55 334775
7 attached pilasters, butteresses,
plinth and string courses etc.
5.33S DESIGN MIX CONCRETE
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Providing and laying in position
ready mixed or site batched
design mix cement concrete for
reinforced cement concrete
w o r k ; u s i n g coarse aggregate
and fine aggregate derived
from natural sources, Portland
Pozzolana / Ordinary Portland
/Portland Slag cement,
admixtures in recommended
proportions as per IS: 9103 to
accelerate / retard setting of
concrete, to improve durability
a n d w o r k a b i l i t y without
impairing strength; including
pumping of concrete to site of
5.33 laying, curing, carriage for all
leads; but excluding the cost of
centering, shuttering, finishing
and reinforcement as per
direction of the engineer-in-
charge; for the following grades
of concrete. Note: Extra cement
up to 10% of the minimum
specified cement content in
design mix shall be payable
separately. In case the cement
content in design mix is more
than 1.10 times of the specified
minimum cement content, the
contractor shall have discretion
to either re-design the mix or
bear the cost of extra cement.
All works above plinth level
upto floor V level
8 minimum cement content of
Supplying and applying pre
tested and approved water
based concrete curing
compound to concrete/
masonry surface, all as per
manufacturer's specification
and direction of Engineer-in-
7.0 STONE WORK
7.1S RANDOM RUBBLE MASONRY
Random rubble masonry with
hard stone in foundation and
plinth including levelling up
with cement concrete 1:6:12 (1
cement : 6 coarse sand : 12
graded stone aggregate 20 mm
nominal size) upto plinth level
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
Random rubble masonry with
hard stone in superstructure
above plinth level and upto
floor five level, including
leveling up with cement
concrete 1:6:12 (1 cement : 6
coarse sand : 12 graded stone
aggregate 20 mm nominal size)
at window sills, ceiling level and
10.0 STEEL WORK
Steel work in built up tubular
(round, square or rectangular
hollow tubes etc.) trusses etc.,
including cutting, hoisting,
10.16 fixing in position and applying a
priming coat of approved steel
primer, including welding and
bolted with special shaped
washers etc. complete.
11.0 FLOORING
11.16S TILE FLOORING
Chequerred precast cement
concrete tiles 22 mm thick in
footpath & courtyard, jointed
with neat cement slurry mixed
with pigment to match the
shade of tiles, including rubbing
and cleaning etc. complete, on
20 mm thick bed of cement
mortar 1:4 (1 cement: 4 coarse
ordinary cement
13.0 FINISHING
13.44S EXTERIOR FINISHING
Finishing with Deluxe Multi
surface paint system for
13.48 interiors and exteriors using
Primer as per manufacturers
specifications :
13.48.3 Painting Steel work with Deluxe Sqm 100 140.05 14005
Multi Surface Paint to give an
even shade. Two or more coat
14 applied @ 0.90 ltr/10 sqm over
an under coat of primer applied
@ 0.80 ltr/10 sqm of approved
brand and manufacture
DISMANTLING AND
Demolishing cement concrete
manually/ by mechanical
means including disposal of
material within 50 metres lead
as per direction of Engineer - in
15 richer mix (i/c equivalent design
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
manually/ by mechanical
means including stacking of
16 steel bars and disposal of
unserviceable material within
50 metres lead as per direction
of Engineer - in- charge.
Demolishing brick work
manually/ by mechanical
means including stacking of
serviceable material and
disposal of unserviceable
material within 50 metres lead
as per direction of Engineer-in-
Demolishing stone rubble
masonry manually/ by
mechanical means including
stacking of serviceable material
and disposal of unserviceable
material within 50 metres lead
as per direction of Engineer-in-
Dismantling doors, windows
and clerestory windows (steel
or wood) shutter including
chowkhats, architrave,
holdfasts etc. complete and
stacking within 50 metres lead :
up sections in angles, tees, flats
and channels including all
20 gusset plates, bolts, nuts,
cutting rivets, welding etc.
including dismembering and
stacking within 50 metres lead.
manually/ by mechanical
means in built up sections
21 without dismembering and
stacking within 50 metres lead
as per direction of Engineer-in-
Schedule G-Provides for items of works that are not covered by the Southern Railway USSOR 2021
& CPWD DSR 2021.
For design & proof checking of super-structure, deck slab work including concrete works, expansion
joint work etc., conducting CHUM test along with supply of MS pipe & miscellaneous works.
S No. Item No Description of Item Unit Qty Rate Amount
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
1 1 Preparation of completion plans Each 1.00 7652.00 7652.00
for the ROBs in AutoCAD duly Bridge
making corrections in the
existing drawings based on the
completion of ROB work over
the already prepared drawings,
supplying a draft print out of
the completed drawings for
scrutiny and taking the final
print out on good quality
tracing film, supplying the same
with 3 copies of prints , soft cop
y etc. complete with
contractor's men, materials,
tools and plants, survey
equipment's, vehicles,
machinery, fuel, consumables,
technical supervisors, computer
etc. complete and as directed
by Engineer-in-Charge.
2 2 Supply and application of epoxy Sqm 792.00 730.00 578160.00
bonding agent ReArm Bond EBA
over deck slab below cement
concrete wearing coat at a rate
of2.60 square meter per litre
including removing the debris
and other materials if any and
clearing the deck slab surface
etc. complete and as directed
by Engineer-in charge Note :- 1.
The bonding materials to be
applied just before wearing
coat concrete for getting proper
bond between deck slab and
wearing coat . 2.The surface of
deck slab to be cleaned
thoroughly and washed before
application of bonding materials
. 3. Payment will be for the area
covered and no extra payment
will be made for wastage of
materials if any.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
structural drawing by reputed
design consultants for pre-
stressed and composite girder
superstructure of ROB as per
approved General arrangement
drawing with all parameters of
ROB conforming to Southern
Railway standard specifications
and relevant codes. The design
particulars in booklet form &
printed structural drawing
drawn with AUTO CAD are to be
submitted in duplicate along
with soft copy for verification
and approval of the competent
authority as directed by the
Engineer in charge. (Rate
inclusive of correction if any
arise by competent authority
and re-submitting to competent
authority after applying
correction). All labour,
materials, technical staff,
computer, software, hardware,
consumables etc. by contractor.
Proof checking of the design of
composite girder
superstructure of ROB by IITs .
(All labour, materials, technical
staff, computer, software,
hardware, consumables etc. by
PSC and Composite girder
super structure of ROBs by IIT's.
(All labour, material, technical
staff, computer, hardware,
consumables etc. by
Plastic(FRP) insulation sheets in
corrugated profile of 3mm thick
with contractor's own FRP
sheets to be fixed below the
fabricated structural steel
supports for casting the
composite girder duly
transporting and fixing by
insulated self tapping screws
with the fabricated steel
sections such as MS angles,
flats, channels, etc.as per the
relevant drawing to correct
alignment etc. including
cutting, drilling holes, welding
etc. complete and as directed in
LINE/POWER BLOCK ( All labour,
materials including FRP sheets,
tools and plants and other
consumables by the
contractor)Note: After
completion of the work, the
above materials shall be
removed by the contractor and
disposed off the same at his
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
and nature viz.
signal/tele/electrical (HT/LT)
existing below ground level up
to 2.00m depth without causing
any damage to the cables
including excavating the earth
up to the cable and refilling the
earth after the removal of cable
and placing the cable on the
ground with all leads, lifts, etc.
complete as directed. (All
labour and materials,
consumables, tools nand
plants, machinery by
contractor). (Payment will be
for all cables in one trench of
about 45 cm width)
below ground level including
excavation of earth to the
required ( up to maximum
1.00m or as required) and
filling back the same after
laying the cables, without
causing any damage to the
cable with all lead, lift etc.
complete as directed, (All
labour and materials,
consumables, tools and plants.
machinery by contractor).
(Payment will be for all cables
in one trench of about 45 cm
Annexure B for erection of
Composite girders under traffic
conditions with traffic blocks.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
9 9 Providing and laying in position cum 260.00 15529.00 4037540.00
machine mixed, machine
vibrated and machine batched
Design Mix Cement Concrete
M25 or higher grade (Cast-in-
situ) for RCC deck slab using
20mm graded crushed stone
aggregate and coarse sand of
approved quality for the
Reinforced cement concrete
structural elements up to height
of 12m from formation level,
including cost of centering,
shuttering, but including
finishing, using Admixtures in
recommended proportions (as
per IS:9103), if approved in Mix
design to accelerate or retard
setting of concrete and / or
improve workability without
impairing strength and
durability complete as per
specifications over the running
lines, OHE area etc. duly taking
necessary precautions including
earthlings and providing FRP
sheets along the OHE line etc.
and direction of the Engineer in
charge. Payment for cement,
steel reinforcement, shuttering
& FRP sheet shall be paid
separately as per relevant
items in Annexures. The
contractor may use sacrificial
form work using approved
quality and design decking
profile sheets for slab bottom
shuttering. However no extra
payment will be made for the
cement concrete crash barrier
at the edges of the road,
approaches to bridge structures
and medians, constructed with
M-20 grade concrete with HYSD
reinforcement conforming to
IRC:21 and dowel bars 25 mm
dia, 450 mm long at expansion
joints filled with pre-moulded
asphalt filler board, keyed to
the structure on which it is built
and installed as per design
given in the enclosure to MOST
circular No. RW/NH -
33022/1/94-DO III dated 24
June 1994 as per dimensions in
the approved drawing and at
locations directed by the
Engineer, all as specified (Rate
inclusive of cement, steel and
soil, waste and vent pipes
including jointing and cost of
spun yarn and sand etc.,
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
PVC soil, waste and vent pipes
including jointing and cost of
spun yarn and sand etc.
pipes 150mm dia in drainage
horizontal runner as per
Drawing No, SR/CN/ERS/ST/49-
2022 Sheet 10 of 10. Placing in
position aligning the pipe line to
the lines and levels and jointing
the pipes with solvent cement
and as directed by Engineer-
modular strip box seal Metre
expansion joint catering to a
horizontal movement 160 mm,
complete as per approved
drawing and standard
specifications as per IRC : SP 69
2011 to be installed and as
directed by Engineer-in-charge.
protective coating with epoxy
Phenolic IP Net (Inter-
Penetrating Polymer network)
paints as per the specifications
from CBRI, Roorkee including
priming Coat ,intermediate coat
& polyurethane top coat on
exposed surface and with
contractors labour, materials,
equipment's etc. complete and
as directed by the engineer in
charge. The sample will be got
tested at Tenderer/Contractor's
cost from reputed laboratories
of CSIR/RDSO. Material
properties, execution method,
testing details and quality
certification to be done as per
16 16 Conducting pile integrity test Each 6.00 31324.00 187944.00
with cross hole ultra sonic
monitoring (CHUM) method in
Cast in situ boared piles of by
approved specialized agencies
having necessary experience &
expertise.The rate shall include
hiring of Trained Professional &
equipment,on-site testing of
piles, transportation, analysis of
data recorded during test,
preparation & submission of
report. The rate shall include
cost of labour, consumables,
transport, hiring charges, taxes
etc complete. Note: Total
number of vertical access tubes
in pile foundation should be
chosen as per Guidelines for
Integrity Testing of Piles BS-41
R1 November 2023.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
nominal bore medium class MS
pipe including all consumables
and endcaps for conducting
cross hole ultra sonic
monitoring (CHUM) test.
speed/termination indicator
boards at appropriate locations
on the formation alongside the
track including leading the
boards from the nearest Stores
Depot, excavation of foundation
of required size and packing
with the excavated earth, fixing
the boards in position with all
leads and lifts etc. complete
and as directed.(All labour,
tools & plants, consumables,
stores (except board) etc. by
speed/termination indicator
boards from available locations
on the formation alongside the
track including leading the
boards to the nearest Stores
Depot, duly excavating the
foundation and refilling the
excavated earth including
packing etc. complete and as
directed.(All labour, tools &
plants, consumables, stores etc.
by contractor).
gratings of sizes as required
with contractors labour,
materials, consumables etc.
Schedule H-Provides for items of works that are not covered by the Southern Railway USSOR 2021
& CPWD DSR 2021.
Item- 8 For Permanent-way works.
S No. Item No Description of Item Unit Qty Rate Amount
rails up to 13m long, check rails
etc. available from any station
yard / midsection / LCs over
Southern Railway outside the
concerned Dy.CE's jurisdiction,
to required site or specified
Construction Stores Depot
including collection of released
rails also, if any, from along the
Railway alignment, leading to
the nearest road approach,
loading, unloading and stacking
the same in a neat and
countable manner with
contractor's road vehicle, crew,
labour, tools, consumable
stores with all leads and lifts
etc. complete and as directed.
Note: The weight of rails for
Class-II will be 95% of new rails.
For leadup to 100 km.
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
2 2 Manual replacement of existing Each 85.00 445.00 37825.00
PSC sleepers with PSC special
sleepers for guard rails under
traffic conditions to correct
level, spacing, gauge and
alignment with necessary
fittings and fastenings with
initial kutcha packing to carry
traffic at20 Kmph. This would
include contractor's labour,
tools and plants, vehicles,
consumables, fuel etc. and with
all lead and lift and crossing the
track where ever required. This
also include stacking of
released materials at
nominated places in the yard or
nearest construction depot as
directed by the Engineer -in-
3 3 Dismantling the rail barricading Each 100.00 89.00 8900.00
without any damage to the
track and return the rails full to
nearby places with good road
approach and stacking the
same in a countable manner at
the contractors cost with all
lead and lift and as directed by
the Engineer incharge (All tools,
labour, materials, consumables
etc.required by the contractor).
NOTE: (1).A detailed laid
inventory should be taken prior
to commencement of the work.
(2). Rates includes
transportation of loose fittings
like ,fish plates etc to the
nearest store depot. (3) The
rate quoted above shall also
include leading of released rails
to the nearest location with
road approach with a maximum
lead of 500m . (4) The item also
includes crossing of track and
leading by dip lorry under block
4 4 Dismantling the existing pale Metre 20.00 64.00 1280.00
fencing duly excavating around
the posts required, removing
the posts and pale and stacking
the re usable pale fencing posts
at convenient [places as
directed by the Engineer-in-
charge with all lead and lift etc.
Annexure E for leading of stone
ballast where the lead involved
is more than 500m and up to 2
CAO-CN-ERS-ENGINEERING/SOUTHERN RLY
sleepers and fastenings Sleeper
including leading the same to
correct position and spacing of
1540/1660 nos/Km, including
applying Railway supply of
grease 'O' graphite to clips, eye
of insert, liner seat duly sealing
the liner seat with grease,
kutcha packing and making
good the disturbed portion of
the track under traffic
conditions as directed by the
Engineer- in-charge with all lead
and lifts, crossing the track if
required etc. complete.
Schedule I-Provides for the items of works that are covered by the Southern Railway USSOR 2021
as corrected by and up to date applicable to TRIVANDRUM & PALAKKAD DIVISION.
Item- 9 For supply of Cement.
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at
grade of approved
Schedule J-Provides for the items of works that are covered by the Southern Railway USSOR 2021
as corrected by and up to date applicable to TRIVANDRUM & PALAKKAD DIVISION.
Item- 10 for supply of steel reinforcement.
S No. Item No Description of Item Unit Qty Rate Amount
Supply of steel reinforcement of
approved brands/makes for
R.C.C. work including
straightening, cutting, bending,
placing in position and binding
bars of grade Fe-500D or more
of approved brands/makes.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
corrigendum.pdf
CORRIGENDUM
CORRIGENDUM1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .