Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance HIMACHAL PRADESH HP | Admitted-Finance |
| 2 | Admitted-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | Admitted-Finance |
| 3 | Admitted-Finance JOGINDER NAGAR HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175001 | Admitted-Finance |
| 4 | Admitted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | Admitted-Finance |
Tender Value
₹12.3 L
EMD Value
₹24,500
Closing Date
16 Aug 2021, 5:00 pmClosed
Executive Engineer
O/o Executive Engineer, B and R Division, HPPWD, Joginder Nagar
Providing and laying G-II and cement concrete pavement with hill side berm in Km. 3/500 to 4/00 Under Deposit
2021_PWD_50904_1
PW-JND-B and R-EA-I-NIT- 8002-8057 dt. 17/07/2021
Open Tender
Civil Works - Roads
Item Rate
90 days
Harabag
As Per SBD Document
11 documents required · 11 mandatory
₹500
E.E. B and R Division, HPPWD, Joginder Nagar
₹24,500
1 Sept 2021
6 Aug 2021
17 Aug 2021
7 Aug 2021
16 Aug 2021
7 Aug 2021
Amount
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 & 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge, hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage, rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost .
Providing, laying, spreading and compacting stone aggregates by manual means of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN (eighty-hundred kilo newton) static roller in stages to proper grade and camber applying and brooming, stone screening/ binding materials to fillup the interstics of course aggregate watering and compacting to the required density Grading-1 (one) as per technical specification clause 405 complete within all leads, lifts, carriage of material and other incidentials charges.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203. Plain cement concrete Grade M-10 complete within all leads, lifts carriage of material and other incidentials.
Providing, laying, spreading and compacting stone aggregates by manual means of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN (eighty-hundred kilo newton) static roller in stages to proper grade and camber applying and brooming, stone screening/ binding materials to fillup the interstics of course aggregate watering and compacting to the required density Grading-2 (two) as per technical specification clause 405 complete within all leads, lifts, carriage of material and other incidentials charges.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement of thickness as per design, over a prepared sub base with 43(forty three) grade cement M-30 (thirty) grade, design mix cement concrete, coarse and fine aggregates conforming to IS:383(three hundred eighty three), maximum size of coarse aggregate not exceeding 25mm(twenty five millimeter ) mixed in a concrete mixer of not less than 0.2 (zero point two) cubic meter capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work ( steel channel) laying and fixing of 125(one hundred twenty five) micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators and finished in continuous opreation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant,dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs using curing compound (where specified) and water, finishing to line and grade as per drawing and as per M.O.R.D. technical specification clause 1501 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect.
Anil Kumar
Ayush Thakur
Ajay Kumar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .