Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.7 L
EMD Value
₹12,744
Closing Date
27 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GGM(P)
RITES Ltd., 5th Floor, Industry House, #45, Fairfield Layout, Race Course Road, Bengaluru 560001
As per Tender
2022_RITES_118489_1
RITES/BLR/LT/01/2022
Limited
Consultancy
Item Rate
60 days
Bengaluru
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,744
Yes
28 Jun 2022
8 Jun 2022
28 Jun 2022
8 Jun 2022
27 Jun 2022
8 Jun 2022
8 Jun 2022 - 18 Jun 2022
Amount
Topographic survey and generation of Topographic map over 1KM length on side of the LC (Corridor 1& 3) Payment terms: Upon completion of survey at site:65% Upon submission of drawing : 35%
GAD preparation (Corridor 1&3) Payment terms: Upon submission of Draft GAD 30% Upon incorporation of comments in GAD 30% Upon approval of GAD from Client/ Railways 40%
Generation of Land Acquisition plan at each LC location (Corridor 1&3) Payment terms: Upon submission of Draft land plan 60% Upon approval of land plan from Client 40%
Generation of existing utility at each LC location (Corridor 1&3) Payment terms: Upon submission of Draft plan 60% Upon approval of plan from Client 40%
Drainage arrangement drawing at each LC location (Corridor 1&3) Payment terms: Upon submission of Draft drawing 60% Upon approval of drawing from Client 40%
Generation of Road Traffic Diversion plan at each LC location (Corridor 1&3) Payment terms: Upon submission of Draft plan 60% Upon approval of plan from Client 40%
Drawing up a comparative statement of carbon footprint savings due to use of green technologies instead of conventional system including RWH system
Stawr Consultants
SHP CONSULTING ENGINEERS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .