Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAccepted-AOC 30 DIGVIJAY PLOT RAVAL NIVAS JAMNAGAR GUJARAT 361 005 | JAMNAGAR | JAMNAGAR | GUJARAT | 361005 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹45.9 L+₹2.7 L (6.30%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹49.1 L+₹5.9 L (13.7%)Rejected-Finance SHOP NO 06 FIRST FLOOR OPP CHAMUNDA HOTEL AT BOKHIRA DIST PORBANDAR GUJARAT 360 579 | PORBANDAR | GUJARAT | 360579 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹49.8 L+₹6.6 L (15.2%)Rejected-Finance PLOT NO P PARASNAGAR NR SBI BANK NARSANG TEKRI PORBANDAR 360 575 | PORBANDAR | GUJARAT | 360575 | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹51.2 L+₹8.0 L (18.5%)Rejected-Finance 121 MADHAV SQUAR OPP AVANTIKA COMPLEX LIMDA LANE JAMNAGAR 361001 | JAMNAGAR | GUJARAT | 361001 | L5 | Rejected-Finance Other than lowest |
Tender Value
Refer Docs
EMD Value
₹93,560
Closing Date
20 Jun 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Navy Porbandar
GE Navy Porbandar Tija Mile Porbandar
SMART PERIODICAL SERVICES AND MISC REPAIRS TO CERTAIN BUILDINGS AT NOFRA, NAUSENA BAGH AND MES COMPLEX
2024_MES_656848_1
9244/PBR/E8
Open Tender
Civil Works
Item Rate
334 days
GE Navy Porbandar
Please see Tender Documents
7 documents required · 7 mandatory
₹500
Garrison Engineer Navy
₹93,560
Yes
12 Jul 2024
30 May 2024
22 Jun 2024
30 May 2024
20 Jun 2024
13 Jun 2024
30 May 2024 - 12 Jun 2024
Amount
Material and labour for preparing of old decorated surface of walls of plastered or unplastered surfaces by brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts treating oil and greasy spots complete all as specified and as directed.
Material and labour for preparing of old decorated surface of ceiling of plastered or unplastered surfaces by brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts treating oil and greasy spots complete all as specified and as directed.
Material and labour for applying one coat of white wash on wall surface complete all as specified and directed.
Material and labour for applying one coat of white wash on ceiling complete all as specified and directed.
Material and labour for applying two coats of white wash on wall surface complete all as specified and directed.
Material and labour for applying two coats of white wash on ceiling complete all as specified and directed.
Material and labour for applying one coat of cement base paint on wall surface complete all as specified and directed.
Material and labour for applying two coats of cement base paint on wall complete all as specified and directed.
Material and labour for applying one coat of distemper oil emulsion on wall surface complete all as specified and directed.
Material &labour for complete removal of existing treatment on walls by scraping with steel scrapping or any other means,including preparation of old plastered or unplastered surfaces and applying two coats opf distemper, oil emulsion white or tinted over and including average 2 mm thick wall care putty layer complete all as specified and directed.
Material and labour for applying one coat of distemper oil emulsion on wall surface complete all as specified and directed.
Material and labour for preparation of old painted surfaces of wood or wood based surfaces and applying one coat of synthetic enamel paint on surface of any description, not otherwise described, over 10 cm width or girth complete all as specified and directed by Engr-in Charge.
Material and labour for applying one coat of synthetic enamel paint on steel or iron surfaces of any decription, over 10 cm in width or grith, not otherwise described including preparation of old painted surface complete all as specified and directed.
Material & labour for complete removal of existing treatment by scraping with mechanical wall sander (having mechanical vacum mechanism) RPM not less than 1500, sanding pad of 80 Grit having dia 7"/9" to amke the surface free from dust, loose paint etc by skilled labour complete all as specified and directed.
Material and labour for two coat of acrylic water based exterior grade primer @0.9 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ration to be applied with fully automatic airless spray machine of paint application with flow speed of min 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.
Material and labour for two coats of water based premium acrylic smooth exterior emulsion of approved colour with silicon additive & colour stay Technology, Excellent Dirt Pick up resistance with low VOC les than 50 gram/litre as per the LEEDS specifications, Anti algal properties in two coats @1.79ltr (undiluted)/10 sqm diluted with water as per manufacturer instructions applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of min 1ltr per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in both the coats of paints complete all as specified and directed. Note for item No 07 to 15 above: (a) The work pertaining to periodical services and water proofing shall be executed from authorised applicator through manufacturer of which the materials .i.e Paint, Distemper, Cement base paint, putty etc is proposed to be used by the contrator and approved by Garrison Engineer. (b) The contractor shall submit Memorandum of Understanding (MOU) with Authorised Applicator of Manufacturer as per Clause 22 of PS-II mentioned in th tender.
Taking down cement or cement lime plaster, any description, on brick or stone walls, etc including racking out joints, hacking for key, scrubbing down with the water etc complete all as specified and directed.
Material and labour for 10 mm thick rendering on brick wall or concrete surface in cement plaster 1:6, surface finished even and smoot without using extra cement etc complete all as specified and directed.
Material and labour for 15 mm thick rendering in cement on brick work or concrete surface in cement mortar (1:4) and surface finished even and smoot (without using extra lime or cement) complete all as specified and directed.
Material and labour for preparation of new plastered surface and applying two coats of exterior emulsion acyrlic weather proof antifungal paint over a coat of exterior grade primer complete all as specified and directed.
Material and labour for preparation of new plastered surface and applying two coats of oil bound distemper, over and incl a layer of wall care putty to get even and smooth level finish on new plastered surface of internal wall ceiling primer complete all as specified and directed.
Note : (a) The quoted rates are deemed to include multi story factor, No extra payment shall be admissible on this account. (b) Contractor shall arrange all safety equipment during the execution of work and also fully responsible for safety measures of labours/painters.
BABUBHAI BHIMABHAI PANDAVADRA
VIVEK JITENDRABHAI KATAR
AADESH CONSTRUCTION
SURESH ELECTRICALS
OM ENTERPRISE
Vastushilp Building Designer
Bharat Enterprise
J J ENTERPRISES
Vijay Construction Co
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .