Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LQualified 73 NIL SHOP 1AND 2 PLOT 73 GRUHLAXMI BUILDING OPP RYAN INTERNATIONAL SCHOOL KHARGHAR NAVI MUMBAI RAIGAD MAHARASHTRA 410210 | RAIGAD | MAHARASHTRA | 410210 | L1 | Qualified MII | |
| 2 | L2₹49.1 L+₹9.8 L (24.9%)Qualified C 20B GROUND FLOOR KALKA JI DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | L2 | Qualified MII | |
| 3 | L3₹50.9 L+₹11.5 L (29.3%)Qualified 271 EXPRESS ROAD EXPRESS ROAD KANPUR NAGAR UTTAR PRADESH 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | L3 | Qualified MII | |
| 4 | L4₹52.9 L+₹13.6 L (34.6%)Qualified 8 3 253 3A PARAMESWARI ENCLAVE PARAMESWAIRI NAGAR SULLURUPETA SRI POTTI SRIRAMULU TIRUPATI DIST ANDHRA PRADESH 524121 | SPSR NELLORE | ANDHRA PRADESH | 524121 | L4 | Qualified MII | |
| 5 | L5₹55.4 L+₹16.1 L (40.9%)Qualified C 10 SAGAR MARKET 25 16 KARACHI KHANA KANPUR KANPUR U P 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | L5 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
8 Jul 2025, 10:00 amClosed
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6277958 Dated : 17-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 26 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Sr. Accounts Officer
SDSC SHAR Satish Dhawan Space Centre SHAR
Department of Space
indian space research organization
Department of Space (Sr. Accounts Officer
Sdsc Shar) Splitting
7892558
GEM/2025/B/6277958
Two Packet Bid
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate
112 days
Yamini524124Keepakam, Satish Dhawan Space Centre, ISRO Sriharikota
Total value wise evaluation
PRODUCT
3 documents required · 3 mandatory
Exempted
17 Jun 2025
17 Jun 2025
8 Jul 2025
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6277958 Dated : 17-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 26 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Sr. Accounts Officer
SDSC SHAR Satish Dhawan Space Centre SHAR
Department of Space
indian space research organization
Department of Space (Sr. Accounts Officer
Sdsc Shar) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7892558.pdf
GEM_BID
1748578975.pdf
OTHER
Terms_0ea39c54-7b51-4e6b-95231748928445067_vaishnavee.s.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .