Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹15,500
Closing Date
31 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
KWA PH SUB DIVISION OFFICE KALPETTA, KALPETTA PO, WAYANAD DT, 673121
O_M WSS ARWSS to Padinjarathara and Thrariode Villages _ Leak_ Other Maintenance work in Thariode Panchayath RC for 6 months_2025 2026 General Civil Work
2025_KWA_814285_1
Tr_10/2025_WRD-CE(NR)25219
Open Tender
Civil Works - Water Works
Item Wise
180 days
Thariode GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,400
₹15,500
24 Oct 2025
24 Oct 2025
1 Nov 2025
24 Oct 2025
31 Oct 2025
24 Oct 2025
Work Name:O&M - Water Supply Schemes-ARWSS-Padinjarathara thariode -Leak & Other Maintenance work in thariode panchayath-Running contract for 6 months-(2025-2026)-General Civil Work
oothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution board
lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.;Leak rectification in PVC pipes- Socket & CIR jointing p100.47.2.1:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.q100.47.2.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.q100.47.2.3:Leak rectification work in 140mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for expos
ing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.q100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.Leak rectification in GI pipes¢100.50.1.1:Rectification of leakages of 32mm, 40mm & 50mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.X100.50.3.2:Rectification of
慫敧景㘠洵⹇⹉倠灩獥椠硥潰敳潰瑲潩獮戠⁹敲汰捡湩敬杮桴灵琠⸱洰戠⁹畣瑴湩Ⱨ爠浥癯湩湡瑳捡楫杮琠敨搠浡条摥瀠牯楴湯映潲桴硥獩楴杮氠湩楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨爠浥楡楮杮瀠牯楴湯愠摮猠数楣污湡潣癮祥湩湡敲汰捡湩楷桴䜠䤮楐数景猠極慴汢楳敺愠摮樠楯瑮湩祢琠牨敥爠湵眠汥楤杮琠慭敫愠眠瑡牥琠杩瑨樠楯瑮慰湩楴杮琠敨眠汥敤潰瑲潩Ɱ琠獥楴杮琠敨氠湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥楷桴畯⁴慣獵湩湡⁹慤慭敧潴愠祮漠桴牥甠楴楬楴獥湩汣摵湩桴档牡敧楨敲愠摮挠湯敶慹据景琠潯獬汰湡⁴湡慭整楲污潴琠敨氠慥楳整慢汩湩畯⁴慷整Ⱳ氠杩瑨湩Ⱨ眠瑡档湩Ⱨ爠扩潢敦据湩Ⱨ挠畡楴湯戠慯摲ⱳ琠慲晦捩搠癩牥楳湯敮散獳牡⁹捳晡潦摬湩湩汣摵湩桴潣瑳漠灳捥慩獬戠瑵攠捸畬楤杮挠獯⁴景瀠灩湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥潣灭敬整键〱⸰〵ㄮ㌮刺捥楴楦慣楴湯漠敬歡条獥漠〸浭䜠䤮楐数祢爠灥慬楣杮氠湥瑧獨甠⁰潴ㄠ〮湩汣摵湩慥瑲睨牯硥慣慶楴湯椠污楫摮景猠楯潦硥潰楳杮氠慥潰瑲潩景琠敨瀠灩湩汣摵湩慴 潣据敲整挠瑵楴杮祢挠瑵楴杮敲潭楶杮愠摮猠慴正湩桴慤慭敧潰瑲潩牦浯琠敨攠楸瑳湩楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴敲慭湩湩潰瑲潩湡灳捥慩獬愠摮挠湯敶楹杮愠摮爠灥慬楣杮眠瑩⹇⹉倠灩獥漠畳瑩扡敬猠穩湡潪湩楴杮戠⁹桴慲敤潣灵敬湡湵潩景猠極慴汢楳敺椠据畬楤杮琠牨慥楤杮污杩浮湥ⱴ氠祡湩湡潪湩楴杮琠慭敫愠眠瑡牥琠杩瑨樠楯瑮整瑳湩桴楬敮琠桴敲畱物摥瀠敲獳牵ⱥ爠捥楴祦湩湡⁹敤敦瑣潮楴散湡敲楦汬湩桴牴湥档獥甠楳杮攠捸癡瑡摥攠牡桴椠慬敹獲渠瑯攠捸敥楤杮㈠挰敤瑰湩汣摵湩潣獮汯摩瑡湩慥档氠祡牥祢爠浡業杮慷整楲杮敲潭楶杮琠敨猠牵汰獵猠楯牦浯琠敨眠牯楳整楷桴畯⁴慣獵湩湡⁹慤慭敧潴愠祮漠桴牥甠楴楬楴獥湩汣摵湩桴档牡敧楨敲愠摮挠湯敶慹据景琠潯獬汰湡⁴湡慭整楲污潴琠敨氠慥楳整慢汩湩畯⁴慷整Ⱳ氠杩瑨湩Ⱨ眠瑡档湩Ⱨ爠扩潢敦据湩Ⱨ挠畡楴湯戠慯摲ⱳ琠慲晦捩搠癩牥楳湯湩汣摵湩桴潣瑳漠灳捥慩獬戠瑵攠捸畬楤杮挠獯⁴景瀠灩湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥潣灭敬整阮〱⸰〵ㄮ㐮刺捥楴楦慣楴湯漠敬歡条獥漠〱洰⹇⹉倠灩獥戠⁹敲汰捡湩敬杮桴灵琠⸱洰椠据畬楤杮攠牡桴潷歲攠捸癡瑡潩湩愠汬欠湩獤漠潳汩映牯攠灸獯湩敬歡瀠牯楴湯漠桴楰数椠据畬楤杮琠牡⼠挠湯牣瑥畣瑴湩Ⱨ戠⁹畣瑴湩Ⱨ爠浥癯湩湡瑳捡楫杮琠敨搠浡条摥瀠牯楴湯映潲桴硥獩楴杮氠湩楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨爠浥楡楮杮瀠牯楴湯愠摮猠数楣污湡潣癮祥湩湡敲汰捡湩楷桴䜠䤮楐数景猠極慴汢楳敺愠摮樠楯瑮湩祢琠牨摡摥挠畯汰牥愠摮甠楮湯漠畳瑩扡敬猠穩湩汣摵湩桴敲摡湩Ⱨ愠楬湧敭瑮慬楹杮愠摮樠楯瑮湩潴洠歡慷整楴桧⁴潪湩ⱴ琠獥楴杮琠敨氠湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥愠摮爠晥汩楬杮琠敨琠敲据敨獵湩硥慣慶整慥瑲湩氠祡牥潮⁴硥散摥湩〲浣搠灥桴椠据畬楤杮挠湯潳楬慤楴杮攠捡慬敹獲戠⁹慲浭湩Ⱨ眠瑡牥湩Ⱨ爠浥癯湩桴畳灲畬潳汩映潲桴潷歲猠瑩ⱥ眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠湡⁹瑯敨瑵汩瑩敩ⱳ椠据畬楤杮琠敨挠慨杲獥栠物湡潣癮祥湡散漠潴汯ⱳ瀠慬瑮愠摮洠瑡牥慩獬琠桴敬歡猠瑩ⱥ戠楡楬杮漠瑵眠瑡牥楬桧楴杮慷捴楨杮楲扢湯映湥楣杮慣瑵潩潢牡獤牴晡楦楤敶獲潩Ɱ椠据畬楤杮琠敨挠獯⁴景猠数楣污畢⁴硥汣摵湩潣瑳漠楰数愠摮愠数桴楤敲瑣潩景搠灥牡浴湥慴景楦散獲攠捴Ⱞ挠浯汰瑥Ί〰㔮⸰⸲㨵敒瑣晩捩瑡潩景氠慥慫敧景ㄠ㔲浭䜠䤮楐数湩攠灸獯摥瀠牯楴湯祢爠灥慬楣杮氠湥瑧獨甠⁰潴ㄠ〮祢挠瑵楴杮敲潭楶杮愠摮猠慴正湩桴慤慭敧潰瑲潩牦浯琠敨攠楸瑳湩楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴敲慭湩湩潰瑲潩湡灳捥慩獬愠摮挠湯敶楹杮愠摮爠灥慬楣杮眠瑩⹇⹉倠灩獥漠畳瑩扡敬猠穩湡潪湩楴杮戠⁹桴慲敤潣灵敬湡湵潩景猠極慴汢楳敺椠据畬楤杮琠牨慥楤杮污杩敮敭瑮慬楹杮愠摮樠楯瑮湩潴洠歡慷整楴桧⁴潪湩ⱴ琠獥楴杮琠敨氠湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥楷桴畯⁴慣獵湩湡⁹慤慭敧潴愠祮漠桴牥甠楴楬楴獥湩汣摵湩桴档牡敧楨敲愠摮挠湯敶慹据景琠潯獬汰湡⁴湡慭整楲污潴琠敨氠慥楳整慢汩湩畯⁴慷整Ⱳ氠杩瑨湩Ⱨ眠瑡档湩Ⱨ爠扩潢敦据湩Ⱨ挠畡楴湯戠慯摲ⱳ琠慲晦捩搠癩牥楳湯敮散獳牡⁹捳晡潦摬湩湩汣摵湩桴潣瑳漠灳捥慩獬戠瑵攠捸畬楤杮挠獯⁴景瀠灩湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥潣灭敬整訮〱⸰〵㈮㘮刺捥楴楦慣楴湯漠敬歡条獥漠㔱洰⹇⹉倠灩獥椠硥潰敳潰瑲潩獮戠⁹敲汰捡湩敬杮桴灵琠⸱洰戠⁹畣瑴湩Ⱨ爠浥癯湩湡瑳捡楫杮琠敨搠浡条摥瀠牯楴湯映潲桴硥獩楴杮氠湩楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨爠浥楡楮杮瀠牯楴湯愠摮猠数楣污
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.79 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Tendernotice_4.pdf
PDF • 0.25 MB
Tendernotice_5.pdf
PDF • 0.25 MB
BOQ_1362125.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .