Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹19.7 L | L1 | Accepted-AOC Less Tender Value |
| 2 | L2₹20.2 LRejected-Finance | ₹20.2 L | L2 | Rejected-Finance High Tender Value |
| Sl No | Description | Qty | Unit | Rajkumar M L1 | RENGASAMY S L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,200 | Sqm | 6 ₹7,200 | 8 ₹9,600 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 630 | Cum | 140 ₹88,200 | 145 ₹91,350 |
| 3.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 180 | Cum | 701 ₹1.3 L | 725 ₹1.3 L |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal including all charges etc., complete. | 4.93 | Cum | 4,548 ₹22,421.64 | 4,950 ₹24,403.50 |
| 5.00 | Providing and laying TACK COAT using Rapid Setting bitumen grade Grade I at the rate of 3kg/10sqm over the Prime coat preparatory to another bituminous construction over it as per MORT& H Specifications KM 0/000-1/600. | 3,807.5 | Sqm | 34 ₹1.3 L | 35 ₹1.3 L |
| 6.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000-1/600. | 114.23 | Cum | 11,059 ₹12.6 L | 11,250 ₹12.9 L |
| 7.00 | Provision for HM Stone | 4 | Nos | 500 ₹2,000 | 555 ₹2,220 |
| 8.00 | Provision for Sign Board | 6 | Nos | 4,800 ₹28,800 | 4,950 ₹29,700 |
| 9.00 | Provision for Name Board Cum Citizen Board | 1 | Nos | 4,000 ₹4,000 | 4,125 ₹4,125 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,00,875 ₹3.0 L | 3,07,845 ₹3.1 L |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
16 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICE
BLOCK DEVELOPMENT OFFICE PERAMBALUR
Renewal of BT Road from Sengunam to Valikandapuram Road (R-99) Sengunam Pt.
2025_RDTN_629106_1
Lr No 3527/2025/B5 Dt 28.11.2025
Open Tender
Civil Works
180 days
BLOCK DEVELOPMENT OFFICE PERAMBALUR
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
₹20,000
3 Feb 2026
5 Dec 2025
16 Dec 2025
5 Dec 2025
16 Dec 2025
5 Dec 2025
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal including all charges etc., complete.
Providing and laying TACK COAT using Rapid Setting bitumen grade Grade I at the rate of 3kg/10sqm over the Prime coat preparatory to another bituminous construction over it as per MORT& H Specifications KM 0/000-1/600.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000-1/600.
Provision for HM Stone
Provision for Sign Board
Provision for Name Board Cum Citizen Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.00 MB
PART1.pdf
Tender Documents • 0.74 MB
PART2.pdf
Tender Documents • 0.66 MB
BOQ_752294.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid