Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC VILL PO GANVI TEH RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.4 L+₹9,762.40 (1.83%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.6 L+₹29,465.60 (5.52%)Rejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | NAVEEN KUMAR L3 | SETHI KUMAR L2 | BHAGWAN DASS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc in earth work lift up to 1.5 mtrs stacking the excavated soil not more than 3 meters away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layers by raming watering and than deposong of all surplus excavated earth as directed with in a lead of 20 mtrs and neatly dressed complete with in all lead and lifts and to the entire satisfaction of Engineer in charge. | 28.98 | Cum | 480 ₹13,910.4 | 440 ₹12,751.2 Lowest | 460 ₹13,330.8 |
| 2.00 | Providing cement concrete 1:3:6 (1 cement:3 sand:6graded stone aggregate 20mm nominal size) and curing complete execluding cost of form work in Foundation and plinth as per the direction of Engineer in charge. | 3.78 | Cum | 9,800 ₹37,044 Lowest | 10,100 ₹38,178 | 9,900 ₹37,422 |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work in:- | ||||||
| 3.01 | Vertical surfaces such as Walls ( any thickness but attached pilasters, buttresses, plinth and string courses etc. and the like complete in all leads and lifts. | 84 | Sqm | 370 ₹31,080 | 320 ₹26,880 Lowest | 350 ₹29,400 |
| 4.00 | Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone aggregate of 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300mm as per H.P.P.W.D specification including all leads and lifts | 44.1 | Cum | 10,500 ₹4,63,050 | 10,200 ₹4,49,820 | 9,900 ₹4,36,590 Lowest |
| 5.00 | Boulder filling behind the retaing / breast wall as per the direction of Engineer in charge. | 5.62 | Cum | 3,200 ₹17,984 | 2,800 ₹15,736 Lowest | 3,000 ₹16,860 |
Tender Value
₹4.9 L
EMD Value
₹9,787
Closing Date
5 Jul 2025, 5:00 pmClosed
EE CHAUNTRA
EE JSD CHAUNTRA
Restoration of rain damages to LWSS Tansal Karsal and Bag in Tehsil Lad Bharol District Mandi H.P SHCo Rwall to protect the filter bed and clear water tank
2025_HPIPH_108748_1
EE-CTR-3058-3107 dt. 26.06.2025- Chauntra Job No.4
Open Tender
Civil Works - Water Works
Item Rate
90 days
Lad Bharol
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EE CHAUNTRA
₹9,787
30 Oct 2025
26 Jun 2025
7 Jul 2025
26 Jun 2025
5 Jul 2025
26 Jun 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .