| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹1.5 Cr+₹6.6 L (4.50%)Rejected-AOC | ₹1.5 Cr+₹6.6 L (4.50%) | L2 | Rejected-AOC Quoted L2 rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not Qualified |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
5 May 2023, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 1 road in Vaiyampatti Block in Tiruchirappalli District under the scheme of MGSMT 2022-23 Package No.105
2023_RDTN_300331_105
DIPR/2018/Tender/2023 Dated 05.04.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.5 L
Yes
DRDA Tiruchirappalli
12 Jul 2023
1 May 2023
5 May 2023
1 May 2023
5 May 2023
1 May 2023
4 May 2023
Amount
Strengthening to the Road from road Elangakurichy -Thoppanayakkanpatty Road to Sadayampatty (Vai) Valayapatty Road. KM 0/0 - 3/750 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Picking the existing mettaled surface and sectioning including all labour charges etc, complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM 0/0-1/00
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/000 - 3/750
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it. KM 0/0-3/750
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0-3/750
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., i charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0-3/750
Road Marking
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Name board, Logo Board, Citizen Information Board including painting and lettering as directed by the departmental officers etc., complete
60 Cm Equilateral Triangle Cautionary SignBoard
Construction of 1.50 m Span Culvert at CH 200 m Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1 :4:8 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
suplying Erection and centering for sides and soffits including necessary supports & structing upto 3.29 ht for plane surface in all flooring with all cross bracing in etc.,
suplying Erection and centering for sides and soffits including necessary supports & structing upto 3.29 ht for plane surface in all flooring with all cross bracing in etc.,
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site,labour charges for fixing the same in the correct position and all other incidental charges etc., Coplete
Providing Weepholes in brick masontry/ stone masontry Plain
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
SRI HARI RAMAJAYAM CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .