| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC | ₹5.9 L | 1 | Accepted-AOC ACCEPTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical Highest |
| Sl No | Description | Qty | Unit | JOMON ABRAHAM L1 | Manoj ca L2 |
|---|---|---|---|---|---|
| 1.00Tarring and Chappath | |||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 55.8 | cum | 64 ₹3,571.20 | 64.45 ₹3,596.31 |
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 84 | sqm | 9.88 ₹829.92 | 9.88 ₹829.92 |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 90 | cum | 3,336.88 ₹3.0 L | 3,336.88 ₹3.0 L |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 642 | sqm | 82.79 ₹53,151.18 | 82.79 ₹53,151.18 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 642 | sqm | 18.15 ₹11,652.30 | 18.15 ₹11,652.30 |
| 1.01 | 75.5.9.1.2pb:20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65) | 642 | sqm | 205.97 ₹1.3 L | 205.96 ₹1.3 L |
| 1.01 | 75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65) | 642 | sqm | 87.46 ₹56,149.32 | 87.46 ₹56,149.32 |
| 1.01 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 3.6 | cum | 360.75 ₹1,298.70 | 360.75 ₹1,298.70 |
| 1.01 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 3.6 | cum | 8,358 ₹30,088.80 | 8,358.3 ₹30,089.88 |
Tender Value
₹5.9 L
EMD Value
₹14,814
Closing Date
14 Jun 2023, 3:00 pmClosed
Block Development Officer, Uzhavoor
BLOCK DEVELOPMENT OFFICE, UZHAVOOR
Metalling and tarring
2023_CRD_580070_1
D-867/2023
Open Tender
Civil Works - Roads
180 days
Ramapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,814
Yes
16 Apr 2026
5 Jun 2023
16 Jun 2023
6 Jun 2023
14 Jun 2023
6 Jun 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_856636.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Ipact.pdf
Additional Documents • 0.23 MB
Prelim.pdf
Additional Documents • 0.25 MB
Sbd.pdf
Additional Documents • 0.97 MB
BOQ_856636.xls
BOQ • 0.28 MB
Affidavit.pdf
Additional Documents • 0.24 MB
Feeremitted.pdf
Additional Documents • 0.33 MB
Formoftender.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid