Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
10 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Chief Engineer, TTD, Tirupati
O/o The SE-II, TTD, TIRUPATHI
Operation and Comprehensive Maintenance of machinery at various places at outside Sri Tirumala temple under Mechanical sub-division at Tirumala for the year 2026-2028 (Two years)
1010676
530/SE-II/TTD/2026-27
OPEN - NCB
Others
Tirupati, Andhra Pradesh
11 documents required · 11 mandatory
₹1.9 L
25 Nov 2026
25 Nov 2026
25 Nov 2026
90 days
Operation & comprehensive maintenance including Servicing, repairing & replacement of spares, etc., complete for the following (A to k) machineries pertaining to temple section as per the agreement conditions. The rate is excluding GST.
(A) Sugar Candy Machines - 2 Units
(B) Paper Cutting Machine - 1 No
(C) Tray washing Machine ( Near Boondi potu) - 2 Units
(D) Ghee Tanks - 12 Nos
(5.0 MT capacity at Block- A: 4 Nos 5.0 MT capacity at Block-B: 4 Nos & 12.0 MT capacity at Block-C: 4 Nos)
(E) Boondhi Potu
i. Batter mixing machine: 6 Nos ii. Fire Hydrants and Sprinklers system - 1 unit
(F) Vapourizers -9 Nos
i. 400 Kg/ Hr capacity - 3 Nos (at LPG yard) ii. 200 Kg/ Hr capacity - 2 Nos (at Boondhi potu- 2 Nos) iii.100 Kg/ Hr capacity - 2 Nos (at new Boondhi potu: 2 Nos) iv.100 Kg/ Hr capacity Vada Potu (Sri TT) - 2 Nos
(G) LPG flow Meters - 3 Nos
(at gas plant- 1 No & at LPT - 2 Nos).
(H) LPG plant at Allamma thota
i. 10 Tonne capacity LPG Gas Bullets: 3 Nos (at LPG yard) ii. Unloading compressor - 2 Nos (at LPG yard) iii. LPG 2" line: app. 1200 M (from LPG plant to sri TT & from LPG plant to MTVAC) iv. LPG 2" line : app. 90 M within yard. v. Motors with pump sets - 5 Nos(DG sets - 2 Nos & Elec - 3 Nos)
(I) Fire Hydrant System
at LPG plant at Allammathota - 1 Unit
Note:- Management has been decided to shift the existing LPG bulk facility to ORR and the work is under progress. Once after completion the said existing Plant will be commissioned from the new premises and the maintenance will also be taken up the IOCL and proportionate deduction will be made from the contractor.
(J) SS Trolleys at Laddu counters - 50 Nos
(for Laddu conveyance from Boondhi potu area to laddu sales counters)
(at BSM plant: 160 KVA DG Set (1 No), 7.5 KW Motor with pump set (1 No), 110 KW Motor with pump set (1 No) & Hydrant pipe line - 1 Unit (From BSM Plant up to Sri TT temple premises app. 300 Mts)
Note 1 : Operation, servicing, repairs and replacement of spares for the above said machinery / equipment shall be carried out as per the conditions mentioned in the agreement.
Note 2 : The rate per month is for Operation and Comprehensive Maintenance for the set of machinery including replacing of all spare parts. The rate shall be Exclusive of GST, inclusive of tax any payable to the Government and all other taxes.
Note 3: Any new machinery added also shall be maintained without any extra cost.
Terms & Conditions for Temple section machinery
Sugar Candy Machine Operation: To operate the machine to pack the sugarcandy prasadams in required size packets as per the requirement of department. To load the packing rolls to the machines properly as per requirement. To keep the machines clean and neatly and to apply oil / grease whenever required. Comprehensive maintenance: Servicing and maintenance of sugar candy packing machines monthly once and the service report should be submitted to the department. Servicing, cleaning and complete checking of all hydraulic pneumatic, mechanical and electrical components like cup filler, gear, photo cell unit, horizontal and vertical jaws, bearing, valve box, timer adjustment, speed adjustment etc., removing and rectifying of the system and putting into the smooth running condition for 2(Two) machines (L & T and samarpan) and compressor etc., complete as directed during execution. All the spares including rewinding / replacement of motors, electrical spare parts required should be replaced immediately without affecting the smooth running of the system.
Paper Cutting Machine Operation: To operate the machine to cut seva tickets & laddu tickets as per the requirement of department. Comprehensive maintenance: Servicing and maintenance of paper cutting machine monthly once and the service report should be submitted to the department/ Engineer-in-charge. Servicing, cleaning and complete checking of mechanical and electrical components like removing and refixing the blades and put into the smooth complete as directed during execution. All the spares including rewinding / replacement of motors, electrical spare parts required should be replaced immediately without affecting the smooth running of the system.
Tray Wash Machines Operation: To operate the machines during cleaning of laddu trays as per the requirement of user department & they should be available round the clock. To keep the machines function and providing steam before starting of the tray wash unit duly maintaining the required temperature of hot water for cleaning of the trays as per requirement. To keep the machine clean and neatly and to apply oil / grease whenever required to carryout servicing of the machine once in 3 months.
Comprehensive maintenance: Servicing and maintenance of laddu trays wash machine monthly once and the service report should be submitted to the department. Servicing, cleaning and complete checking of all mechanical and electrical components like water pump and motors, conveyer belt, gears, photo cell unit, sensors, bearings, power supply unit and its electrical accessories, all types of valves, timer adjustment, steam lines etc., removing and rectifying of the system and putting into the smooth running condition etc., complete as directed during execution. All the spares including rewinding / replacement of motors, electrical spare parts, power cables should be replaced immediately without affecting the smooth running of the unit.
Ghee Tanks Operation: Servicing of systems of Ghee tanks without affecting the services required by the TTD for the following machinery. The ghee tanks shall be cleaned by deploying the skilled labour in coordination with the Health department periodically as per the schedule circulated by the Dy EO (Temple) from time to time. Subsequent filling shall be done only after obtaining the fitness certificate / report from the health dept. It is the responsibility of the agency to maintain all the storage tanks in a neat and hygenic condtion without giving scope for any type of leakages/ spills etc., The rate is excluding the cost of load cells. To operate the Ghee tanks round the clock duly taking care of unloading of Ghee from the tanker into the Ghee storage tanks properly and maintaining the Ghee storage tanks neat & tidy and keeping the premises clean and also servicing / replacing the spares.
Boondhi / Vada Potu Operation: The agency has to supply all the necessary gas spares like all types of burners, valves, flexibles, copper pig tails, including LPG lines necessary accessories etc., shall be of branded make only as directed / suggested by the department from time to time. The fixing shall be done by the gas operators. The spares which are required for maintaining the batter mixer units like motors (3/5 HP), starters, shafts, agitators etc., shall be kept by the agency surplusly under stand by and replaced immediately during break downs without affecting the routine work under any circumstances. The spares which are required for maintaining the fire hydrant pipe lines, necessary accessories shall be at the responsibility of the OMC agency and the sprinklers needs to be opened and tested during every mass cleaning.
LPG plant at Allammathota Operation: The TTD Gas operators attend the operation of the LPG vaporizers loading & unloading compressors and LPG bullets round the clock. Comprehensive Maintenance: 1) Any leakages at flange joints, welding joints and the pipe line, are to be arrested at LP.Gas bullets, LPG yard and LPG line duly replacing the gaskets, valves, packing material including welding / lathe works, replacement of bolts and nuts. 2) Check and service unloading compressor, wheel valves, ball valves, drip units, strainers and glass indicators and cleaning, oiling, greasing of the entire unit regularly for lines at LPG yard, delivery lines to Srivari potu, MTVNAC and inside Sri T.T., lines including welding / lathe works, replacement of bolts and nuts.
3) Check and servicing of vaporiser and the internal wiring testing of thermostat controls checking the seamless tube coils, insulation, solenoid valves, indication lamps and switches temperature gauges, refixing all the components. Re-filling of glycol water and water at the required level including welding / lathe works, replacement of bolts and nuts. 4) General : (1) The agency should check and replace the wornout spares whenever required to keep the system in good working condition at any time (2) The firm should service the entire system bimonthly (once in two months) and submit the service report to the department (3) Checking the running of all the pumps every month (4) Lubricating the moving regularly
SS Trolleys Operation: Run by the user department. Comprehensive maintenance: Removing of old damaged castor wheels from the trolleys Removing of old damaged S.S support channels / plates and rewelding with new one. Welding inside, out side of the trolley body and trolley handle Refixing of APEX make C-250 Model castor wheels to the trolleys. Grease applying to the wheels by grease gun. Cleaning of trolley completely after repair.
Fire Hydrant System Operation: To be vigilant round the clock to monitor the fire fighting system and to act immediately in emergencies to operate the machinery.
Comprehensive maintenance: a) Diesel Generator Set: (1) Check for automatic starting under stipulated conditions (2) Check for discharge pressure of water developed by the pump set (3) Check for lubrication oil pressure and cooling water temperature (4) Check for water leakage in the foot valves (5) Check for gland packing and gland leakages (6) Lubrication of the pump set (7) Check for oil level in the engine crank case and air filter (8) Checking the Diesel engine control panel board for proper functioning (9) Checking the specific gravity and level of electrolytic liquid in batteries (10) Checking all the instruments and control panels (11) Regular maintenance of batteries 12V/150AH to the above DG Sets. b) Electrical pump set : (1) Checking for the good working condition of all three pump sets once in a month (2) Operating one or two hydrant valves and checking of the performance of jockey pump, main pump and Diesel pump once in a month (3) Checking the running of all the pumps every month (4) Polishing the brass/ gun metal parts in every two months (5) Lubricating the moving parts once in every two months (6) Arresting water leakages in the delivery main I.C isolation and control valves, priming tank except under ground pipes once in a month (7) Greasing of all threaded parts like wheels on hydrant valves once in a month (8) Powdering of the rubber hose wound on the hose reels once in a month (9) Topping up the batteries electrolytes liquid with distilled water once in a month (10) Brushing the flexible canvas hose and checking for cracking once in a month.
Hydrant System: (1) Checking all cut off valves for gland leakages and freeness of spindle (2) Checking of valves position indicators (3) Checking all danding valves, main seating and gland leaks and ensure that spring locks are in good working condition (4) Checking all those boxes for cleanliness and working locks, hinges (5) Inspecting the hose drums for free movements and water leakages during in the movement (6) Checking for freeness of instantaneous locking arrangements and lubricating if necessary (7) Inspecting the water hose for leakages (8) Checking the air release valves for proper functioning. All the spares including rewinding / replacement of motors, electrical spare parts required should be replaced immediately without affecting the smooth running of the system.
General Conditions
1. Personnel: 1.1. The Technical personnel should be on full time and available at site whenever required by Engineer in Charge to take instructions.The technical personnel engaged shall be with suitable qualification and experience in maintainent of similar works. 1.2. The names of the technical personnel to be employed by the contractor should be furnished separately. 1.3. The contractor should provide Uniform to the working staff at his own cost. 1.4. The contractor should employ Hindus only and they should have faith in Lord Venkateswara. 1.5. If the Engineer-In-Charge asks the contractor to remove a person who is a member of contractor’s staff or his work force stating the reasons, the contractor shall ensure that the person leaves the site forthwith and has no further connection with the work in the contract. 1.6 One Technical person of qualification not less than Diploma in Mechanical shall be engaged.
2. Contractor’s Risks: All risks of loss of or damage to physical property and of personnel injury and death, which arise during and in consequence of the performance of the contract are the responsibility of the contractor.
3. Insurance: The contractor shall maintain at his own cost personal accident insurance for his own staff as considered satisfactory by the TTD to cover any risk arising from the work and services to be performed under the agreement. 3.1 The contractor shall provide the following insurance only through block insurance scheme to cover their men, machinery, and equipment. 1. Operating personnel’s compensation Insurance for the contractor’s labour. 2. Group personal accident policy.
4. Accident or Injury to the operating personnel: The contractor shall be solely liable for any accident or injury that may happen to any of the personnel engaged by him in connection with the contract work according to respective contracts. The TTD shall not be liable for or in respect of any damage or compensation payable at law in respect of or in consequence of any accident or injury to any personnel in the employment of the contractor and the contractor shall indemnify and keep indemnify the TTD against all such claims, damages, compensations and proceedings. The contractor shall forthwith report to departmental officer, all cases of accidents to any of the personnel/operating personnel and shall make every arrangement to render all possible assistance and aid to the victims of accident.
5. Employees Provident Fund Act: The contractor shall comply with provisions of the “Employees” Provident Fund Act 1952, and the scheme framed there under in so far as they are applicable to his establishment. The contractor is further required to indemnify the TTD against any loss or damage, whatsoever that may be suffered by the TTD in compliance on his part with provisions of the aforesaid act and scheme framed there under. The contracting agency / person should pay his part of E.P.F contribution along with wages every month. It is the responsibility of the contractor / agency to pay the E.P.F contribution along with the contribution of his employees to the commissioner of E.P.F Evidence of payment by the contractor. The contractor should pay timely applicable minimum wages, variable dearness allowence, EPF & ESI throughout the contract period.
6. Care of Work : From the commencement of the work to the completion of the work, the contractor shall take full responsibility for the care of TTD property and equipment. In case any damage or loss shall happen to TTD property and equipment from any cause whatsoever, the contractor at his own cost replace and make good the same.
Note: 1) Water, power salt and Diesel/LPG will be supplied by TTD free of cost for operation and maintenance of the above scheme. 2) The contractor has to maintain one cell phone at each machinery section at his own cost for better interaction on running of machinery and for informing the authorities about the stage of action regularly as and when required by the department. 3). The Income tax @ 2% or as in force will be deducted from the running bills of the contractor. 4) The contractor has to procure the required machinery for repairing such as welding machine,cutting machine, grinding machine etc., at his own cost. 5) No escalation of rates on whatsoever reasons will be paid during the period of contract. 6) If the deployed work force is observed as less for effective O & M of work the TTD will ask for additional deployment with reasons and the contractor shall comply forthwith. This additional deployment of required personnel will also be at the cost of contractor only. No extra amount whatsoever will be paid by TTD.
Note: The quantities mentioned above are based on the actual requiremnt, both in the case of man power deployment and supply of materials, which were calculated per month basis. In case, the identified contractor fails to deploy the man power and also to supply the materials, the proportionate cost will be deducted from the running bills.
7) The rates are exclusive of GST.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 530 BOQ.xlsx
TENDER_DOCUMENT • 0.02 MB
NIT 530 Tender conditions.doc
TENDER_DOCUMENT • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .