Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
Closing Date
17 May 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER ELECTRIC DIVISION SOPORE
EXECUTIVE ENGINEER ELECTRIC DIVISION SOPORE
Creation of 100 kVA substation along with HT/LT lines at Bonichakal
2022_PDD_167653_1
EMDS/01
Open Tender
Electrical Works
Turn-key
30 days
Creation of 100 kVA substation along with HT/LT li
Please refer Tender documents.
6 documents required · 6 mandatory
₹201
EXECUTIVE ENGINEER ELECTRIC DIVISION SOPORE
Exempted
19 May 2022
25 Apr 2022
19 May 2022
25 Apr 2022
17 May 2022
26 Apr 2022
25 Apr 2022 - 26 Apr 2022
210 days
Amount
Supply,Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,100 KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2
Supply , Transportation and errection of 9MTR long ST Poles (410 SP-33) completely errected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit. (as per REC Standard)
Supply, Transportation and errection of 8MTR long ST Poles (410-SP 15) completely erected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit . (as per REC standard)
Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR Conductor, (30mm2 ACSR Conductor) as per REC standard.
Supply, transportation and fixing of GI Channel /Angle Iron for Cross Arms, Braces, Transformer Belt, F-Top, Collers etc for Sub Station and poles (Complete Job including Nuts & Bolts and Washers)
Supply and fixing of 11kV composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm Porcelean
Supply and fixing of LT Shackle Insulators with G.I Mukhi Clamps (Scaffolding G.I LT Clamps) including nuts and bolts as per REC standard
Supply, Carriage up to site, Installation, testing and Commissioning of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc.
Supply and fixing of 185 mm Sq (2 Ckt) Single Phase 1.1 KV Grade , PVC Insulated stranded conductor FRLS Type including Aluminum Thimbles, PG/SL Clamps etc. as per REC standard
Supply and fixing of 11KV G.O set (AB Switch 3-phase,3 -pole,200A) including nuts and bolts, washers, clamps etc. complete job as per REC standard. (Drilling of holes prohibited)
Supply and fixing of 11KV Horn Gap fuse set 3 phase,200A including nuts and bolts, washers, clamps etc. complete job as per REC standard. (Drilling of holes prohibited)
Supply and fixing of Gapless surge arrestor, 9 KV, 10KA , LA station Type including nuts and bolts, washers, clamps etc. complete job as per REC standard. (Drilling of holes prohibited)
Supply and fixing of LT distribution Fuse Set of standard make using Clamps/ Thimbles with Brass Bolts & washers etc. complete job as per REC standard (Drilling of holes prohibited)
Providing ,installation,Testing and commissioning earthing Sub Stns -Excavation of earthing pit of dia 650mm & depth 3000mm, installation of earthing pipe of 40mm Nominal bore & 4mm wall thichness & length 2.5 mtr long as per IS 1239 GI strip for netural earthing of size 75 mmx 10mm & 50 mmx6mm for connection of transformer body ,GO set & lighting arrestor as per IS 2629/85, GI nuts & bolts , refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slabs cover. (as per REC standard)
Painting of ST Poles with one coat of red oxide and two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint.
Earthing of ST Poles Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing Pit =( 600x600x1600)& Tappered at the Top. (as per REC standard)
Supply, Carriage up to site, Installation, testing and Commissioning of danger Plates
Supply, Carriage up to site, Installation, testing and Commissioning of anti-climbing devices
Pre, during and post geo tagged photographic evidence consisting of 5x7 inch photographs in coffee table book (covering each pole/Sub Station)
Supply, Carriage up to site, Installation, of Sign Board (2X2 feet) along with required accessories like clamps, nuts and bolts etc.
M/S BILAL ELECTRICALS
NARWARI ELECTRICALS
AL AZEEM ENTERPRISES
TRUE CONSTRUCTIONS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .