Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹8.6 L+₹6,322.90 (0.74%)Accepted-AOC 22 830 KALLAI POST KOZHIKODE 673005 | KOZHIKODE | KOZHIKODE | KERALA | 673005 | L2 | Accepted-AOC Agreement executed | |
| 2 | L1₹8.6 LRejected-Finance | L1 | Rejected-Finance Rejected him in financial evaluation due to 10 percentage price preference given to MALABAR UNION LABOUR CONTRACT CO OPERATIVE SOCIETY LTD | |
| 3 | L3₹8.7 L+₹15,761.60 (1.84%)Rejected-Finance | L3 | Rejected-Finance Higher rate | |
| 4 | L4₹9.7 L+₹1.1 L (12.5%)Rejected-Finance KANNUR | KERALA | 670001 | L4 | Rejected-Finance Higher rate |
Tender Value
₹8.0 L
EMD Value
₹19,917
Closing Date
23 Aug 2019, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Roads Division, Kozhikode
bridges - rectification of damages due to flood
2019_PWD_294227_1
DB1/TN/73/2019-20(73)Bridges
Open Tender
Civil Works - Bridges
Item Rate
30 days
Mavoor
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,760
Yes
online
₹19,917
Yes
26 Feb 2020
19 Aug 2019
26 Aug 2019
19 Aug 2019
23 Aug 2019
19 Aug 2019
Amount
demolishing
2.4.4.D : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Dry rubble masonry<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry
2.4.1.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - <br> Cement Concrete Grade M-15 & M-20. - By Manual MeansDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Cement Concrete Grade M-15 & M-20. - By Manual Means
2.1.4 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit <br>Girth above 1800 mmCutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm
Repair work of bridge
3.13.1.A : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Manual Means - (Depth upto 3 M)<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.Ordinary soil - Manual Means - (Depth upto 3 M)
od15586/2019_2020 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
od15592/2019_2020 : dry rubble masnory for retaining wall using departmental rubble. (labour charges only)
13.5.E.q.1 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br> RCC Grade M20 - Using concrete Mixer - Height 5m to 10 m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - Using concrete Mixer - Height 5m to 10 m
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
od15587/2019_2020 : Pumping or bailing out water and removing slush etc by using Pumpset including labour, ,oil set hire charges of pump set etc complete
od15588/2019_2020 : Chipping and removing the damaged concrete surface of beam and slab
16.9 : Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under pressure, comprising of cement, sand, coarse aggregates, water and quick setting compound in the proportion as per clause 2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively, water cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000 kg/cum, strength not less than 25 Mpa and workmanship conforming to clause 2807.6.Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under pressure, comprising of cement, sand, coarse aggregates, water and quick setting compound in the proportion as per clause 2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively, water cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000 kg/cum, strength not less than 25 Mpa and workmanship conforming to clause 2807.6.
od15589/2019_2020 : Dumping deptl. Boulders from stack to site and dumping in position to lines and levels of average lead of 50m etc. complete.
od15590/2019_2020 : Providing platform over pipes of size 15mm to 20mm. Dia errected and platform made up of 25 Nos. post of average 15m long and the platform consist 25mm, thick planks placed to 125mm and 75 mm irul wood joists placed tied at 60 cm intervals including all hire and labour chargesfor fixing and laying the platform, cost of nails, coir etc., includingremoval of entire platform after completion of the work.
3.18 : Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
MALABAR UNION LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD
PMR Construction Company
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
PMR Construction Company
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
TP SHIJU
MALABAR UNION LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .