Loading…
Loading…
Tender Value
₹5.2 Cr
EMD Value
₹2 L
Closing Date
18 Sept 2026, 4:00 pm
Superintending Engineer
KWA, P H Circle, Muvattupuzha
AMRUT 2.0-Additional Proposals for achieving full FHTCs with 24x7 water supply system at Piravom municipality city center, augmentation of the existing water supply scheme, and constructing 5.3 lakhs liters storage reservoir at Kombanamala
2026_KWA_866261_1
06/2026-27/SE/PHC/MVPA
Open Tender
Civil Works - Water Works
Item Rate
181 days
KWA, PHCircle, Muvattupuzha
As per NIT
10 documents required · 10 mandatory
₹11,025
Yes
₹2 L
Yes
KWA,PHCircle,Muvattupuzha
22 Aug 2026
22 Aug 2026
19 Sept 2026
22 Aug 2026
18 Sept 2026
22 Aug 2026
22 Aug 2026 - 7 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of 5.3 LLcapacity OHSR at Kombanamala for Zone II --- Working charges | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | - | cum | - | - |
| 1.003 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | - | cum | - | - |
| 1.004 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 0.2 | cum | - | - |
| 1.006 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | - | cum | - | - |
| 1.007 | OD62356/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement,including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve<br>workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately. All work above floor V level for four floor level | 1 | cum | - | - |
| 1.008 | OD276649/2025-2026:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified
cement content used is payable/ recoverable separately.
Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content
considered in M-30 is @ 340 kg/cum). | - | cum | - | - |
| 1.009 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 0.6 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.38 MB
NITVoluII06.pdf
Tender Documents • 1.74 MB
Circulars.pdf
Other Document • 14.77 MB
BOQ_1466180.xls
BOQ • 0.43 MB
NITVoluI06.pdf
Tender Documents • 1.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].