| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.5 LAccepted-AOC M S 4BC PITAMPURA DELHI 110034 | DELHI | NORTH WEST DELHI | DELHI | 110034 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹26.4 L+₹3.2 L (13.7%)Rejected-AOC D1C 47A JANAK PURI NEW DELHI 110058 | NEW DELHI | DELHI | DELHI | 110058 | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹27.3 L+₹4.1 L (17.5%)Rejected-AOC WZ 576 577 NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L-3 | Rejected-AOC L-3 | |
| 4 | Rejected-Technical | - | Rejected-Technical No slow progress show cause notice served |
| Sl No | Description | Qty | Unit | Shiv Enterprises L3 | Pradeep Bros L2 | Friends fire Engineers L1 |
|---|---|---|---|---|---|---|
| 1.00 | M&L for dismantling and removing the air blower machine upto Cap 200 M3/Hr from the existing position and transporting to repair workshop complete, opening the blower, servicing including cleaning & replacement of worn outparts i.e injection ring, distance bush & ring ,sleeve,O-ring,lock nut & washer, ball bearings etc. and installing back to the original position, testing and commissioning on full load for 4 hrs continous running for the capacity of blower to make air blower functional complete all as specified and directed.
Note:- All minor consumables incl T&P and Tpt required shall be deemed as included in the rates quoted. | 2 | Each Job | 4,000 ₹8,000 | 2,000 ₹4,000 Lowest | 15,000 ₹30,000 |
| 2.00 | Supply only Pressure gauge (Air) 60 to 180 M3/Hrs complete all as specified and directed. | 2 | Each | 700 ₹1,400 Lowest | 900 ₹1,800 | 2,000 ₹4,000 |
| 3.00 | Supply oly Lube oil for Air compressor (air blower) Servo 320 complete all as specified and directed. | 20 | Ltrs | 450 ₹9,000 | 200 ₹4,000 Lowest | 450 ₹9,000 |
| 4.00 | Supply only V belt for 20 HP air compressor complete all as specified and directed. | 6 | Each | 300 ₹1,800 | 100 ₹600 Lowest | 1,000 ₹6,000 |
| 5.00 | M&L for dismantling and removing the motor of the centrifugal/ mono block / coupled Pump set or Air compressor from existing position, Shifting to authorized workshop for the repair work, removing the burnt winding, cleaning rotor/ stator, re-winding the motor with super enameled copper wire of suitable size equivalent to the original winding including insulated packing materials, Varnishing, Drying etc and installing back to the original position, testing and commissioning on full load for 4 Hrs continuous running for the capacity of motor upto 3HP complete all as specified and directed. | 2 | Each Job | 3,500 ₹7,000 | 2,000 ₹4,000 Lowest | 5,000 ₹10,000 |
| 6.00 | All as per Srl item No 5 here-in-before but more than 3 HP upto 5 HP | 1 | Each Job | 4,500 ₹4,500 | 2,000 ₹2,000 Lowest | 12,000 ₹12,000 |
| 7.00 | All as per Srl item No 5 here-in-before but more than 5 HP upto 7.5 HP | 1 | Each Job | 6,000 ₹6,000 | 2,000 ₹2,000 Lowest | 15,000 ₹15,000 |
| 8.00 | All as per Srl item No 5 here-in-before but upto 40 HP | 1 | Each Job | 18,000 ₹18,000 | 5,000 ₹5,000 Lowest | 30,000 ₹30,000 |
| 9.00 | M&L for Dismantling and removing the centrifugal/ mono block/ Coupled pump set from the existing position after disconnecting the inlet/outlet piple connections, disconnecting the electric supply cables and transporting to repair workshop complete, opening the pump side, servicing the pump set including cleaning the shaft including replacement of worn out bearing, bushes, check nut, shaft sleeves,bush,impellers etc. and installing back to the original position, testing and commissioning on full load for 4 hrs continous running for the capacity of pump upto 3 HP complete all as specified and directed. | 2 | Each Job | 2,000 ₹4,000 Lowest | 2,000 ₹4,000 Lowest | 3,000 ₹6,000 |
| 10.00 | All as per Srl item No 9 here-in-before but more than 3 HP upto 5 HP | 1 | Each Job | 2,000 ₹2,000 Lowest | 2,000 ₹2,000 Lowest | 6,000 ₹6,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
13 Feb 2026, 6:00 pmClosed
GE I RnD Delhi
MILITARY ENGINEER SERVICES GARRISON ENGINEER I RND LUCKNOW ROAD TIMARPUR DELHI 110054
REPAIR MAINT OF RO PLANT AND STP IN KWC AREA AND REPAIR MAINT OF FIRE FIGHTING SYSTEM AT METCALFE HOUSE UNDER GE I RnD DELHI
2026_MES_749564_1
GE/RND/T-87/DLI/2025-2026
Open Tender
Civil Works
Item Rate
240 days
Delhi
Class-D, Cat-a (ii)
2 documents required · 2 mandatory
₹500
GE I RnD Delhi
₹80,000
29 Apr 2026
22 Jan 2026
16 Feb 2026
22 Jan 2026
13 Feb 2026
6 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for dismantling and removing the air blower machine upto Cap 200 M3/Hr from the existing position and transporting to repair workshop complete, opening the blower, servicing including cleaning & replacement of worn outparts i.e injection ring, distance bush & ring ,sleeve,O-ring,lock nut & washer, ball bearings etc. and installing back to the original position, testing and commissioning on full load for 4 hrs continous running for the capacity of blower to make air blower functional complete all as specified and directed.
Note:- All minor consumables incl T&P and Tpt required shall be deemed as included in the rates quoted. | 2 | Each Job | - | - |
| 2 | Supply only Pressure gauge (Air) 60 to 180 M3/Hrs complete all as specified and directed. | 2 | Each | - | - |
| 3 | Supply oly Lube oil for Air compressor (air blower) Servo 320 complete all as specified and directed. | 20 | Ltrs | - | - |
| 4 | Supply only V belt for 20 HP air compressor complete all as specified and directed. | 6 | Each | - | - |
| 5 | M&L for dismantling and removing the motor of the centrifugal/ mono block / coupled Pump set or Air compressor from existing position, Shifting to authorized workshop for the repair work, removing the burnt winding, cleaning rotor/ stator, re-winding the motor with super enameled copper wire of suitable size equivalent to the original winding including insulated packing materials, Varnishing, Drying etc and installing back to the original position, testing and commissioning on full load for 4 Hrs continuous running for the capacity of motor upto 3HP complete all as specified and directed. | 2 | Each Job | - | - |
| 6 | All as per Srl item No 5 here-in-before but more than 3 HP upto 5 HP | 1 | Each Job | - | - |
| 7 | All as per Srl item No 5 here-in-before but more than 5 HP upto 7.5 HP | 1 | Each Job | - | - |
| 8 | All as per Srl item No 5 here-in-before but upto 40 HP | 1 | Each Job | - | - |
| 9 | M&L for Dismantling and removing the centrifugal/ mono block/ Coupled pump set from the existing position after disconnecting the inlet/outlet piple connections, disconnecting the electric supply cables and transporting to repair workshop complete, opening the pump side, servicing the pump set including cleaning the shaft including replacement of worn out bearing, bushes, check nut, shaft sleeves,bush,impellers etc. and installing back to the original position, testing and commissioning on full load for 4 hrs continous running for the capacity of pump upto 3 HP complete all as specified and directed. | 2 | Each Job | - | - |
| 10 | All as per Srl item No 9 here-in-before but more than 3 HP upto 5 HP | 1 | Each Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
TDR.pdf
Tender Documents • 1.45 MB
BOQ_839489.xls
BOQ • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .