Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
3 Dec 2026, 6:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Ambica Division, Navsari
Improvement of Existing Irrigation infraStructure works on Dharasana Distry Ex Valsad Branch Canal & Its System.
369066
6 of 2026-27 (Short Term)
Open
Civil Works - Canal
Works
Navsari
14 documents required · 14 mandatory
₹3,600
Executive Engineer, Ambica Division, Navsari
₹2.5 L
26 Nov 2026
26 Nov 2026
26 Nov 2026
3 Dec 2026
26 Nov 2026
120 days
Name of Work: - Improvement of Existing Irrigation infraStructure works on Dharasana Distry Ex
Valsad Branch Canal & Its System.
Memorandum showing items of work to be carried out
Quantities Total Amount
Quantities Total Amount
Item Estimated according to
Item of work In figure Unit
No. but may be In words Estimated
more or less Quantities
Clearing the borrow area including thin jungle Rupees Two
cutting and removing trees up to 0.5 m girth, Thousand Eight
1 5.20 bushes ,shrubs etc. complete. 2887.99 Hundred Eighty Ha
Seven and Ninety
Nine Paisa Only
Dismentalling the existing stone masonry
including sorting out and stacking the useful
2 213.50 materials and removing the debries and making 757.40 Rm
Seven and Forty
good the damage etc. complete as directed. (b) In
Dismentalling the existing foundation concrete
including disposing the dismentalled stuff
including sorting out and stacking the useful
3 69.75 1165.20 Hundred Sixty- Cm
materials and removing the debries and making
Five and Twenty
good the damage etc. complete as directed. (b) In
cement concrete
Dismentalling the exisiting R.C.C. Pipes of the
following diameter including sorting out and
Hundred Seventy-
4 40.00 stacking of the useful materials including refilling 873.90 Rm
Three and Ninety
the trenches etc complete as directed. (NP-2
Pipes) (b) 650mm to 900mm Dia
Dismentalling the existing R.C.C.pipes of the Rupees One
following diameter including sorting out and Thousand Two
5 80.00 stacking of the useful materials including refilling 1281.70 Hundred Eighty- Rm
the trenches etc. complete as directed. (NP-2 One and Seventy
pipes) (c) 1000 mm to 1200 mm dia. Paise Only
Removing of exiting disturbed C.C. lining
including opening of joints, stacking the same and
6 33863.88 29.10 Nine and Ten Sm
disposing of stuff as directed etc. complete with all
leads and lifts.
Earthwork in embankment using soil, soft & hard
murrum excavated from approved borrow
area/village tanks etc.including breaking clods, Rupees Ninety-
7 3888.60 dressing to the design section withlead up to 1.0 94.20 Four and Twenty CM
kilometer and all lift. (By poclane machinary) (b) Paise Only
for Lead beyond 1 .00 KM & But Up To 3.00 KM
Compaction Of Earthwork in embakement in
layers 15 to 20 cms at requisite moisture content
to required dry density not less than 85% of
8 3888.60 12.40 and Forty Paise CM
corrosponding proctor maximum dry density
including watering,rolling with suitable type of
roller etc.complete
Quantities Total Amount
Quantities Total Amount
Item Estimated according to
Item of work In figure Unit
No. but may be In words Estimated
more or less Quantities
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft & hard
murrum etc dry condition including depositing Rupees Eighty-
9 938.00 the excavated stuff in uniform layers in banks or 81.50 One and Fifty CM
directed etc. complete for lead up to 1.0 km and all Paise Only
lift ( By Machinery) (a) Above water table
Providing and laying plain/ reinforced Design Mix
cement concrete of various grade with cement,
sand and coarse aggregates including centering,
shuttering, batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc. complete
for all lead and lift.(Batching plant Based,
Including dewatering)
(i)Raft, Bottom slab of barel, footing of columns, Rupees Four
10 piers, abutment and bottom slab of sump etc.(i) M - Thousand Three
413.00 15 Grade 4380.90 Hundred Eighty CM
and Ninety Paise
(ii) - (C) Piers, abutment, wingwalls, headwall, Rupees Four
returnwall etc. Thousand Nine
880.50 (iii) M-20 grade. 4976.90 Hundred Seventy- CM
Providing and fixing in position (different
diameter) NP2 R.C.C pipe with collar including
Hundred Twenty-
11 37.50 filling and caulking the joints with cement mortar 627.30 M
Seven and Thirty
1:1 proportion, finishing, curing etc. complete for
all lead and lifts
Providing and fixing in position (different
diameter) I.S.NP3 Class reinforced pipe with
caulking the joints with cement mortar 1:1
proportion using jute string soaked in cement
slurry, finishing, Joint and laying pipe to designed
grade and levels, curing etc. complete for all lead
(c ) N P -3 class 600 mm dia pipe Rupees Two
0.00 2005.00 Thousand Five M
12 (e) N P -3 class 900 mm dia pipe Rupees Three
80.00 3590.90 Hundred Ninety M
and Ninety Paise
(e) N P -3 class 1200 mm dia pipe Rupees Five
125.00 5758.40 Hundred Fifty- M
Eight and Forty
Quantities Total Amount
Quantities Total Amount
Item Estimated according to
Item of work In figure Unit
No. but may be In words Estimated
more or less Quantities
Providing and laying plain / reinforced cement
concrete lining of M-15 grade in bed, side slopes
and curvature including batching, mixing,
Hundred Eighty-
13 32148.00 transporting placing, smooth finishing, curing 387.80 SM
Seven and Eighty
including dewatering where required.(machinary
based without paver))(a) 7.50 cm thick lining In
Providing and laying plain / reinforced cement
concrete lining of M-15 grade in bed, side slopes
and curvature including batching, mixing,
Hundred Seventy-
14 1716.00 transporting placing, smooth finishing, curing 478.20 SM
Eight and Twenty
including dewatering where required ( Machinary
based without Paver) (b) 10 cm thick lining in bed
Providing and Filling Ashphalt of the approved
make and sand in the expansion and contraction
15 8815.36 68.03 Eight and Three M
joints in the C. C lining including clearing the joints
with air water jet,
Providing and placing in position reinforcement
bars including cutting, bending welding, joints
where necessary, hooking etc. complete as per
drawing for all lead and lifts.(b) TMT Rupees Seven
Hundred Ninety-
Providing & fixing in position sign board of
standard size of 1.20mx0.90m with M.S angle
40mmx40mmx6mm with 3mm thick iron plate
Thousand Eleven
17 1.00 including fixing in 1:5:10 prop. Concrete block size 3011.30 Nos
and Thirty Paise
40cmx40cmx75 cm including painting existing
data on the board etc. complete as directed )
Providing and Fixing in position Verticle steel
outlet gate including febrication cutting, welding,
and two coat oil paint and one coat red oxide
18 5.00 4892.10 Hundred Ninety- Nos
(prime coat, greasing,etc com as per drawing or as
directed rate for one gate Gate ( Size 0.45 x1.00
Providing guage plate of following size of material
fibre glass reinforced plastic with engraved bands
width and figures with necessary clits and
19 4.00 5321.95 Hundred Twenty- Nos
fastenersand fixing the same at the site of work etc
One and Ninety-
complete as directed. for 0.20 mt X 1.00 mt gauge
Five Paise Only
Quantities Total Amount
Quantities Total Amount
Item Estimated according to
Item of work In figure Unit
No. but may be In words Estimated
more or less Quantities
Supplying & Laying mechanically woven double
twisted hexagonal Zn+PVC coated box wire mesh
reno mattress size 1.0 mt. x 1.0 mt. x 0.30 mt. filled
with 10 to 15 kg trap rubble stone (approximate Rupees Two
2.70) tone with mesh size 6 cm x 8 cm. including Thousand One
packing,inter locking of stones and fusing top of Hundred Ninety-
gabion & tying to each other & laying to the One Only
required line,level slope with all leads & lifts as
directed etc. complete. ( Considering lead of 45 km
for rubble materials)
Providing vidiography on the ocassion of function Rupees One
or for on going construction work including Thousand Two
21 1.00 dubbing, titeling etc. complete including cost of 1230.51 Hundred Thirty Job
cassette/CD (b) Upto 4 Hrs. and Fifty-One
Two Crore Forty Six Lakh Fifty Seven Thousand Nine Hundred Fifty Eight and Forty Three Paise Only.
k at……………………………...………% above/below Percent(should be written in
mated rates mentioned above. Amount of my/our tender works out as under.
* Estimated amount Put to tender Rs. 24657958.43 * Estimated amount Put to tender Rs.
Deduct…….%below Rs. Add…….% above Rs.
Net Rs. Total Rs.
In words…………………….. In words……………………..
*(Please strike out whichever is not applicable)
Note 1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
Note-3 Rates quotes include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions, site, moisture,
Note-4 To be continued on additional sheets, if found necessary.
Divisional Accountant Executive Engineer
Ambica Division Ambica Division
Navsari Navsari
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD Book.pdf
2 Schedule B.pdf
3 Drawing.pdf
3.1 Drawing.pdf
3.2 Drawing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .