Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
29 Dec 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NBCC Bhawan
NBCC Bhawan
Rectification of Defects in Existing Administrative Building Plastic Park, Paradeep, Odisha to be carried out at the Risk and cost of existing contractor M/s Gannon Dunkerly & Co. Ltd.
NBCC/SBGO/PPPL/Paradeep/2023/12~EW481c7b9dd7bfd4619058d272
NBCC/SBGO/PPPL/Paradeep/2023/12
Open Tender-Domestic
Civil Works General
NBCC Bhawan
₹11,800
₹1.9 L
29 Dec 2023
10 Nov 2023
29 Dec 2023
10 Nov 2023
29 Dec 2023
3.a MR CONTROL OF MOISTURES:- Providing and laying of AQUAVENT 'Roof' Each 100.000 4543.00 454300.00
or equivalent at an interval of 450 -1200 mm at the lowest level of
the wall as per direction of Engineerin-Charge with minimum 20 years
guarantee against any leakage & Seepage provided by Manufacturer.
Complete in all respect as per manufacturer specification and
direction of Engineer-In-charge.
CONTRACTOR 16 NBCC
Digitally signed by NEELESH
BOQ for “Rectification of Defects in Existing Administrative Building Plastic Park, Paradeep, Odisha to be carried out at the Risk and
cost of existing contractor M/s Gannon Dunkerly & Co. Ltd.”.
S.No. OSR/ Description Of Job Unit QTY Rate (in Rs.) Amount (In Rs.)
Item OSR MR OSR MR
3.b MR CONTROL OF MOISTURES:- Providing and laying of AQUAVENT 'Wall' Each 1000.000 1121.00 1121000.00
or equivalent at an interval of 450 -1200 mm at the lowest level of
the wall as per direction of Engineerin-Charge with minimum 20 years
guarantee against any leakage & Seepage provided by Manufacturer.
Complete in all respect as per manufacturer specification and
direction of Engineer-In-charge.
3.c MR CONTROL OF MOISTURES:- Providing and laying of AQUAVENT 'Floor' Each 500.000 2891.00 1445500.00
or equivalent at an interval of 450 -1200 mm at the lowest level of
the wall as per direction of Engineerin-Charge with minimum 20 years
guarantee against any leakage & Seepage provided by Manufacturer.
Complete in all rescpect as per manufacturer specification and
direction of Engineer-In-charge.
4 MR Providing , laying and applying in position of Dr. MIRACLE or Sqm 6000.000 162.84 977040.00
equivalent system or impregnation water proofing compound by
applying 3 coats @ 1 kg /sqm. Complete in as per manufacturer
specification and direction of Engineer-In-charge.
5 MR Providing , laying and applying in position of waterproofing Sqm. 6250.000 453.12 2832000.00
compound . Complete in all rescpect as per manufacturer
specification, waterproofing compound shall be applying as per
following Specifications.
1st layer ESKOO-Heat Reflective Coating@ 5kg/sqm.
2nd layer Glass membrane 70 GSM with 75mm overlaps.
3rd layer Glass membrane @ 1.5 kg/sqm overlaps including
preparation of surface. Complete in all respect as per direction of
Engineer-in-charge.
6 MR Providing and fixing double scaffolding system (cup lock type) on the Sqm. 1000.000 208.86 208860.00
exterior side, up to seven story height made with 40 mm dia M.S.
tube 1.5 m centre to centre, horizontal & vertical tubes joining with
cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps
and M.S. staircase system in the scaffolding for working platform etc.
and maintaining it in a serviceable condition for the required duration
as approved and removing it there after .The scaffolding system shall
be stiffened with bracings, runners, connection with the building etc
wherever required for inspection of work at required locations with
essential safety features for the workmen etc. complete as per
directions and approval of Engineer-in-charge .The elevational area of
the scaffolding shall be measured for payment purpose .The payment
will be made once irrespective of duration of scaffolding.
7 MR Dismantling portions of reinforced cement concrete work Cum 10.000 63.72 637.20
ordered/chipping of unsound concrete to a depth/thickness of 25mm
to 100mm averaging 62.5mm in respect of roofs, floors, beams,
columns, staircases, landing, chajja, parapets, etc. and similarly
suspended work (other than ground floors). Complete in all respect
as per Manufacturer's Specifications and direction of Engineer-in-
8 MR Surface preparation of RCC column, beams, chajja, roof drops, soffit Sqm. 100.000 112.10 11210.00
of slabs (ceilings) by removing existing cement plastering, hacking the
surface of RCC work for key to a depth of 15mm by gentle chipping
manually to make surface rough and thoroughly cleaned with air and
water jet. Complete in all respect as per Manufacturer's
Specifications and direction of Engineer-in-charge.
9 MR Providing and applying of paint after Prepration/cleaning of exposed Sqm. 100.000 247.80 24780.00
surface of rusted steel reinforcement with metal wire brush, cleaning
the rusted surfaces free from loose rust and application of rust
remover cum passivator painted with brush to rusted
[email protected]/Sqm. of surface of existing reinforcement)
and removing rust with flex after 24 hours of application of rust
remover with the help of wire brush, sand paper and thoroughly
washed with water with the help of pressure jet and allowing it to dry
complete. (Area of cleaned reinforcement steel bar shall be
measured for payment). Complete in all respect as per
Manufacturer's Specifications and direction of Engineer-in-charge.
CONTRACTOR 26 NBCC
Digitally signed by NEELESH
BOQ for “Rectification of Defects in Existing Administrative Building Plastic Park, Paradeep, Odisha to be carried out at the Risk and
cost of existing contractor M/s Gannon Dunkerly & Co. Ltd.”.
S.No. OSR/ Description Of Job Unit QTY Rate (in Rs.) Amount (In Rs.)
Item OSR MR OSR MR
10 MR Providing and applying of paint after Preparation of surfaces of steel Sqm. 70.000 318.60 22302.00
of reinforcement by cleaning thoroughly and proving, mixing and
applying zinc anti-rust agent as per manufacturers specification of
application to rebar corrosion protection system to reinforcement
@1.75 Kg/Sqm surface of steel reinforcement in two coats. Complete
in all respect as per Manufacturer's Specifications and direction of
Engineer-in-charge.
11.a MR Providing,laying and applying in position of Polymer modified Sqm. 1000.000 448.40 448400.00
AQUAPROOF102 or equivalent system @4 Kg/SQM Cementous
bonding coat, prepared and applied on the concrete/masonry
surfaces with in ratio 1:1 to 1:1.5 of Polymer and cement complete
and sprinkling quartz sand on it. Adhesive bond strength not less than
2.50 MPa. [Internal & as bonding coat] Complete in all respect as per
Manufacturer's Specifications and direction of Engineer-in-charge.
11.b MR Providing,laying and applying in position of Painting 2 coats of DR. Sqm. 500.000 436.60 218300.00
MIRACLE HP Coating or equivalent system @4Kg/SQM Cementous
bonding coat, prepared and applied on the concrete/masonry
surfaces with in ratio 1:1 to 1:1.5 of Polymer and cement complete
and sprinkling quartz sand on it. Adhesive bond strength not less than
2.50 MPa. [Internal & as bonding coat] Complete in all respect as per
Manufacturer's Specifications and direction of Engineer-in-charge.
12 MR Providing laying and fixing of proposed rebars, mild steel TMT bars of Each 100.000 67.26 6726.00
different diameter for column, beams, slab, chajja, drop, parapets
encasement, as detailed in sketch including fabricating, placing,
teeing, fixing etc. cut to length bent to shape as required, including
cranking, bending, spirally for hooping for columns, hooking ends and
binding with and including mild steel wire (annealed) not less than
0.9mm dia and welding to existing steel reinforcement. Complete in
all respect as per direction of Engineer-in-charge.
13 MR Providing laying and fixing of proposed rebars, mild steel TMT bars of Each 1000.000 795.32 795320.00
different diameter for column, beams, slab, chajja, drop, parapets
encasement, as detailed in sketch including fabricating, placing,
teeing, fixing etc. cut to length bent to shape as required, including
cranking, bending, spirally for hooping for columns, hooking ends and
binding with and including mild steel wire (annealed) not less than
16mm dia and welding to existing steel reinforcement
14 MR Providing, placing and fixing of form work shuttering shuttering Sqm. 20.000 1203.60 24072.00
including strutting, propping etc. and removal of form work for the
columns, beams, chajjas, drops, fins, parapets etc. for the proposed
micro concrete encasement as detailed in sketch, specifications,
standard practice and directions of Engineer-in-charge. Cost inclusive
of all materials, carpentry work, transportation, labor, tools and
tackles, lead and lift etc. Complete in all respect as per direction of
Engineer-in-charge.
15 MR Providing and laying of Micro-concrete cement based pre packed Cum 1.000 88500.00 88500.00
single component, chloride free, sulphate free, non-shrink, free flow,
self-compacting/ready to use after mixing water in specified
proportion of approved quality. Form work shall be provided for
placing micro concrete patch repair as required at site with steel jack
system and steel props to support the form work in this application
of high strength, dual shrinkage, compensated, micro, concrete repair
with compressive strength of 40 Mpa at 28 days. Complete in all
respect as per direction of Engineer-in-charge.
Note: form work shall be measured and paid separately.
16 MR Providing and laying of Carbo Fiber Wrap 230 GSM with EPOXY, as sqm 50.000 5605.00 280250.00
per manufactures specifications. Complete in all respect as per
direction of Engineer-in-charge.
17.1 MR Providing and fixing of Rain water spout 2” x 2” in aluminum 3mm Each 10.000 442.50 4425.00
17.2 MR Providing and fixing of Rain water spout 3 ” x 3 ” in aluminum 3mm Each 10.000 560.50 5605.00
17.3 MR Providing and fixing of Rain water spout 4 ” x 4 ” in aluminum 3mm Each 10.000 678.50 6785.00
18 MR Providing and fixing of 3D Grating rain water spout Each 20.000 1357.00 27140.00
CONTRACTOR 36 NBCC
Digitally signed by NEELESH
BOQ for “Rectification of Defects in Existing Administrative Building Plastic Park, Paradeep, Odisha to be carried out at the Risk and
cost of existing contractor M/s Gannon Dunkerly & Co. Ltd.”.
S.No. OSR/ Description Of Job Unit QTY Rate (in Rs.) Amount (In Rs.)
Item OSR MR OSR MR
A MR Total Amount for Waterproofing Work Total - 16500459.20
A MR Total Amount for Waterproofing Work Total - 16500459.20
B MR Corrosion Inhibiting System
19 MR Corrosion Inhibiting System
19.1 MR Providing and applying Coat of Concrete Penetrating Corrosion Sqm 500.000 271.40 135700.00
Inhibitor EPCO KP100 or equivalent (which works on Bipolar
Inhibition Mechanism of the approved makes on concrete surface to
be repaired by using brush or spray at dosage specified by the
manufacturer specifications and direction of Engineer-In-charge.
20 MR Rebarring
20.1 MR For Shear Connector/Ties/Stirrups: Supply and fixing of shear
connectors/ties/stirrups using rebars of designated dia for
column/beam/Shear walls etc at designed embedement length
wherever required , including power drilling, cleaning of holes, then
rebars should be inserted in holes that should be filled with a hybrid
rebarring chemical with ETA approval, DIBt, approved for diameter
range from 8 mm to 28mm reinforcement bar as per manufacturer's
specification as per the direction of Engg In-charge. Drilling of hole
should be done upto provided embedment depth as per the design
from manufacturer approved by EnC, followed by cleaning with blow
pump, wire brush and blow pump for 4 times, complete as per the
manufacturer's methodology. The chemical shall have tested service
life of 50years as per ETA. Cost of providing, cutting, bending of rebar
shall be paid separately as per approved item.
21 MR Rebar For Main Reinforcement: Supply and fixing of main
reinforcement using rebars of designated dia for
column/beam/Shear walls/Foundations at designed embedement
length wherever required , including power drilling, cleaning of holes,
then rebars should be inserted in holes that should be filled with a
heavy duty pure epoxy based rebarring chemical with ETA approval,
DIBt, approved for diameter range from 8 mm to 40 mm
reinforcement bar as per manufacturer's specification as per the
direction of Engg In-charge. Drilling of hole should be done upto
provided embedment depth as per the design from manufacturer
approved by EnC, followed by cleaning with blow pump, wire brush
and blow pump for 4 times, complete as per the manufacturer's
methodology. The chemical shall be approved for diamond-drilled
and water-filled drill holes as well as seismic applications in
performance categories C1, C2 for rebar connections. Product shall
have test certificate for 120years of service life & shall have ETA
complying to EAD 332402-00-0601-v01. Cost of providing, cutting,
bending of rebar shall be paid separately as per approved item.
22 MR Steel Reinforcement
22.1 MR Providing laying and fixing of Steel reinforcement for R.C.C. work
including straightening, cutting, bending, placing in position and
binding all complete above plinth level.
22.1.1 MR Thermo-Mechanically Treated bars of grade Fe-500D or more. Kg 100.000 106.20 10620.00
23 MR Polymer Modified Mortar (Ready to use)
23.1 MR Repair Mortar : Providing and Application of repair mortar of M30 Sqm 500.000 2301.00 1150500.00
grade or higher of approved make
(Krishnaconchem/Sika/Fosroc/Basf) for Making up lost section of
concrete or mortor with thixotropic repair mortor (PMM) after the
application of bonding agents to ensure stability of the mortar upto
30mm thickness. It would be followed by water curing for at least 7
days. The rates are inclusive of all materials, labor, machinery,
equipment, tools, tackles, etc., all complete. Payment shall be made
on the basis of surface area of PMM. The payment for bonding
agents/coat will be done through separate BOQ item. Complete in all
respect as per Manufacturer's Specifications and direction of
Engineer-in-charge.
24 MR CRACK REPAIR & FILLING
CONTRACTOR 46 NBCC
Digitally signed by NEELESH
BOQ for “Rectification of Defects in Existing Administrative Building Plastic Park, Paradeep, Odisha to be carried out at the Risk and
cost of existing contractor M/s Gannon Dunkerly & Co. Ltd.”.
S.No. OSR/ Description Of Job Unit QTY Rate (in Rs.) Amount (In Rs.)
Item OSR MR OSR MR
24.1 MR Crack Repair: Making 'V' groove of 6-8 wide and 10 mm deep over Rmt. 50.000 224.20 11210.00
crack line on wall face by electrically operated angle grinder and
cleaning it by air blower. Filling it with Polymer modified repair
mortar of approved make followed by wet curing for 7 days as
directed by Engineer-in-charge.
Rate are inclusive of all tools, tackles & material etc. Complete in all
respect as per Manufacturer's Specifications and direction of
Engineer-in-charge.
25 MR CHICKEN WIRE MESH
25.1 MR Providing and fixing of chicken mesh with cement mortar and Sqm 50.000 194.70 9735.00
screws/nail in plaster work between concrete bend, lintels, column
and brick work for avoid the cracks in finishing work. Complete in all
respect as per Manufacturer's Specifications and direction of
Engineer-in-charge.
26 MR CURING COMPOUND
26.1 MR Curing: Supplying and applying pre tested and approved acrylic based Sqm 250.000 41.30 10325.00
concrete curing compound Concure ab or euivalent to concrete/
masonry surface, all as per manufacturer’s specification and direction
of Engineer-in-charge.
B MR Total Amount for Corrosion Inhibiting System - 1699790.00
B MR Total Amount for Corrosion Inhibiting System - 1699790.00
C Civil/Finishing work
27 OSR- Supplying, fitting and fixing Vitrified Tiles in floors of size 600mm x
2014 600mm (Coloured/Printed Series) of approved make and approved
quality confirming to IS 13755 laid on 20mm thick cement mortar
(1:4) (1 Cement: 4 Course Sand), filling the joints with white cement
and and colouring pigment to match the shade tiles including cost of
all labour, materials, taxes, royalties, loading and unloading,
conveyance, sundries, watering and curing, etc. complete as per the
direction of the Engineer-in-Charge . (Note- Sample of vitrified tiles
shall be approved before procurement and use.)
27.1 Ground Floor/First Floor/Second Floor Sqm 20.000 1410.00 28200.00
28 OSR- Providing 6mm thick cement plaster in cement mortar of (1:4) to
2014 ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams
and lofts etc. including roughening, scraping and cleaning and
finishing the plastered surface smooth using wooden floats only to
proper plumbs and level, making grooves, beads and drip coarse to
give required ornamental finish as per drawing including cost of all
materials, conveyance, loading and unloading, all taxes and royalties,
all labour, scaffolding, watering and curing , sundries, T&P etc.
complete as per direction of the Engineer-in-charge
28.1 Ground Floor/First Floor/Second Floor Sqm 100.000 130.00 13000.00
29 OSR- Providing 18mm thick cement plaster on external surfaces of brick Sqm 100.000 240.00 24000.00
2014 surfaces in two coats consisting under layer 12mm thick CM 1:5 (1
cement : 5 coarse sand) and a top layer of 6mm thk. cement plaster
1:3 ( 1 cement : 3 coarse sand) mixed with integral water proofing
material of including racking out joints, scraping and cleaning the
surface and finishing the plaster surface smooth using wooden floats
only to proper plumbs and level and making grooves, beads and drip
coarse to give required ornamental finish as per drawings including
cost of all materials, conveyance, loading and unloading, all taxes and
royalties, all labour, scaffolding, watering and curing, sundries and
T&P etc. complete as per direction of the Engineer-in-charge
30 Providing & Painting two or more coats with oil bound washable
distemper of approved brand and manufacture over a coat of wall
primer by means of brush to inside surface of new walls including
preparation of wall surface with 2mm thick layer of acrylic wall putty
and finished smooth before application of wall primer & paint
including cost of all materials, labour, scaffolding, T&P etc. complete
as per the direction of E-I-C.
30.1 OSR- Ground Floor/First Floor/Second Floor Sqm 100.000 180.00 18000.00
31 OSR- Providing and Painting top of the slanting roofs & out side brick walls
2014 with Acrylic Smooth exterior paint of required shade (Note- colour
and make of shall be approved before procurement and use) by
means of brush after scraping, cleaning the surface including all cost
of materials, scaffolding, labour, T&P etc complete as per direction of
Engineer-In-Charge
31.1 Ground Floor/First Floor/Second Floor Sqm 100.000 120.00 12000.00
CONTRACTOR 56 NBCC
Digitally signed by NEELESH
BOQ for “Rectification of Defects in Existing Administrative Building Plastic Park, Paradeep, Odisha to be carried out at the Risk and
cost of existing contractor M/s Gannon Dunkerly & Co. Ltd.”.
S.No. OSR/ Description Of Job Unit QTY Rate (in Rs.) Amount (In Rs.)
Item OSR MR OSR MR
32 OSR- Providing 1st class Fly Ash brick masonry using
2014 (250mmx120mmx80mm ) size fly-ash bricks having crushing strength
not less than 75Kg/Sqcm in cement mortar (1:6) after immersing the
bricks for minimum 6 hours in water before use with all necessary
projections, splays cutting, circular moulding, corbelling etc as per
drawings. including cost, conveyance, all taxes, royalties, loading and
unloading of all materials, including cost of all labour, scaffolding,
watering and curing, sundries, T&P etc. complete as per the
direction of the Engineer-in-charge.
32.1 Ground Floor/First Floor/Second Floor Sqm 100.000 4775.00 477500.00
C Total Amount for Civil/Finishing Work Total 5,72,700.00 -
C Total Amount for Civil/Finishing Work Total 5,72,700.00 -
D Inspection and Certification
33 MR Inspection and certification: Third party inspection and certification is L.S. 1.000 200000.00 200000.00
to be done from a reputed Institute like IIT/NIT for the work done
and certificate of guarantee of retrofitting & waterproofing measures
adopted and sustainability to be given satisfaction of Client/NBCC
D Total Amount for Waterproofing Work Total - 2,00,000.00
D Total Amount for Waterproofing Work Total - 2,00,000.00
Total civil work (A+B+C+D) 5,72,700.00 1,84,00,249.20
TOTAL CIVIL WORK(OSR+MR) 1,89,72,949.20
E For Reparing of Plumbing Work
34 OSR- Providing all materials, labour, T&P for laying of following nominal dia
2014 CPVC pipes S.D.R - 11 as per IS-15778 with ISI mark including fixing
of required size CPVC fittings like,bend,Tee,elbow,offsets,etc. and the
same fixed on wall or floor with holder bat clamps screw etc.
including testing the joints with required water presure.The cost
inclusive of all taxes,duties,transportation scaffolding etc. as per
specification and direction of Engineer-in-charge.
36 OSR- Providing all material, labour,T&P for fitting & fixing of following
2014 water supply fittings confirming to IS-15778 with ISI mark as per
ASTM D-2846 with jointing materials etc. including testing the joints
with required water pressure. The cost inclusive of all taxes, duties,
transportation, scaffolding etc. all complete as per specification &
direction of EIC.
36.1 25mm dia CPVC ball valve No 20.000 335.00 6700.00
36.2 32mm dia CPVC ball valve No 20.000 590.00 11800.00
36.3 40mm dia CPVC ball valve No 20.000 1620.00 32400.00
36.4 50mm dia CPVC ball valve No 20.000 1620.00 32400.00
37 OSR- Providing all materials, labour, T&P for laying of PVC rain water pipe
2014 with fittings like bend, shoe, clamp, etc.from roof up to Ground Level,
the cost inclusive of pipe, fittings, all labour & materials etc. all
complete as per direction of EIC.
E Total Amount For Reparing of Plumbing Work Total 4,51,300.00 -
E Total Amount For Reparing of Plumbing Work Total 4,51,300.00 -
GRAND TOTAL COST (OSR +MR) 1,94,24,249.20
GRAND TOTAL COST (OSR +MR) 1,94,24,249.20
CONTRACTOR 66 NBCC
Digitally signed by NEELESH
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
1 NIT 12 PPPL.pdf
Tender Document
2 Instruction to Bidder for online Bid Submission_05.pdf
Tender Document
3 ContractorGCC2013.pdf
Tender Document
4 Scope of Work PPPL.pdf
Tender Document
5 1 TECHNICAL SPECIFICATIONS.pdf
Tender Document
5 2 TECHSPECSPARADEEP1UPDATED.pdf
Tender Document
5 3 TECHSPECSPARADEEP2UPDATED.pdf
Tender Document
7 List of Approved Make.pdf
Tender Document
8 TENDER DRAWINGPARADEEP merged.pdf
Tender Document
9 Annexure I A_Physical Milestone.pdf
Tender Document
6 BOQ for Rectification of Defects.pdf
Tender Document
corrigendum-2131-Corrigendum 06 NIT 12 .pdf
pdf • 0.11 MB
corrigendum-2125-Corrigendum 05 NIT 12.pdf
pdf • 0.08 MB
corrigendum-2124-Corrigendum 05 NIT 12.pdf
pdf • 0.08 MB
corrigendum-2105-Corrigendum 04_NIT 12 .pdf
pdf • 0.08 MB
corrigendum-2076-Corrigendum 03 NIT 12.pdf
pdf • 0.08 MB
corrigendum-2049-Corrigendum 02_NIT 12.pdf
pdf • 0.08 MB
corrigendum-2037-Corrigendum 01_NIT 12.pdf
pdf • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .