DISTRICT SOIL CONSERVATION OFFICER
Office of the District Soil Conservation Officer, Civil Station , B.- Block , Annexe Building , Kannur
Infrastructure development works - Construction of water harvesting structure SeedFarmKulam 17m X17m X 4.5m
2020_DSSC_361218_2
K(2) /1208/2017/2020-3
Open Tender
Civil Works - Others
Item Rate
180 days
vengad seed farm
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
online
₹50,000
27 Jan 2021
28 Jul 2020
14 Aug 2020
28 Jul 2020
13 Aug 2020
28 Jul 2020
28 Jul 2020 - 13 Aug 2020
Amount
SEED FARM POND -- VENGAD G.P
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains ( not exceeding 1.50m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within alead of 50m - All kind of Soil (2.8.1)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kind of Soil (2.6.1)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift from 1.5to 3.00 m, disposed earth to be levelled and neatly dressed & It; br > . All kind of Soil (od4077/2018-2019)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift from 4.50 to 6.00 m, disposed earth to be levelled and neatly dressed & It; br > . All kind of Soil (od4078/2018-2019)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift from 4.50to6.00 m, disposed earth to be levelled and neatly dressed & It; br > . All kind of Soil (od4079/2018-2019)
Filling with Quarry Muck-Filling up low lying and water logged areas with local materials/ quqrry muck, spreading in layers, levelling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade (51.2.3)
Laterite roughly dressed stones of size 40x20x15 cm or nearest size laid dry pitching Revetment etc including cost of all materials and labour charges etc complete (od4080/2018-2019)
Laterite masonry with neatly dressed Laterite stones of size 40x20x15 cm or nearest size in Cement mortar 1:6 for foundation and basement including cost of all materials and labour charges etc complete (50.6.7.1)
Centering and shuttering including strutting, propping etc. and removal of form work for:Lintels, beams, plinth beams, girders, bressumers and cantilevers (5.9.5)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level Thermo Mechanically Treated bars of Grade Fe-500D or more (5.22.6)
Providing and laying in position cement concrete of specified grade excluding the cost centering and shuttering- All work upto plinth level 1:3:6 (1 cement:3 coarse sand: 6 graded stone aggregate 20mm nominal size) (4.1.5)
Filling available excavated earth (excluding rock) in trenches, Plinth, sides of foundation etc. in layers not exceeding 20cm depth, consolidating each deposited layers by ramming and watering, lead upto 50m and lift upto 1.50m (2.25)
12 mm cement plaster of mix:1:4, (1 cement :4 fine sand) (13.1.1)
White washing with lime to give an even shade : New works(three or more coats) (13.37.1)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new works (13.61.1)
Lettering with black japan paint of approved brand and manufacture for lettering (13.71)
Pumping or Bailing out of water and removing slush etc by using pumpset including cost of labour, oil hire charges of pumpset etc complete (50.2.3.1)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_529407.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .