Loading…
Loading…
Tender Value
₹49.4 L
EMD Value
₹50,000
Closing Date
9 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Surat Canal Division, Surat
Improvement of Existing Irrigation Infrastructure works on 2L S/Mr betn Ch.1360 to 3048 mt Ex.Kareli minor.
289776
NIT-24 of 2025-26
Open
Civil - All
Surat
15 documents required · 9 mandatory · 6 optional
₹1,500
Yes
Executive Engineer, Surat Canal Division, Surat
₹50,000
Yes
25 Mar 2026
25 Mar 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where
applicable, and otherwise at such rates and prices as the Engineer may fix within the terms
of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities
are stated or not. The cost of Items against which Contractor has failed to enter a rate or
price shall be deemed to be covered by other rates and prices entered in the Bill of
Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related items
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill
8. The method of completed work of payment shall be in accordance with the specification for
Road and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling
for its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Name of Work : Name of Work: Improvement of Existing Irrigation Infrastructure
works on 2L S/Mr betn Ch.1360 to 3048 mt Ex.Kareli minor.
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Description of Item (with brief
specification and reference to book of Quantity Unit Amount
specifications)
Dismentalling the existing Brick Masonary
including sorting out and stacking the useful
1 materials and removing the debries and making 12.00 Cum 757.40
good the damage etc. complete as directed.(b) in
Dismentaling the existing R.C.C. pipes of the
following diameter including sorting out and
2 stacking of the useful materials including refilling 18.00 Rmt 349.50
the trenches etc. complete as directed. (NP.2
pipes) (a) 225 mm to 400 mm dia.
Removing of exiting disturbed C.C. Block lining
including opening of joints, stacking the same and
disposing of stuff as directed etc. complete with all
leads and lifts.
Clearing the borrow area including thin jungle
4 cutting and removing trees upto 0.5 m 2.95 Ha 2887.99
girth,bushes, shrubs etc. complete
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft and
hard murrum etc. dry condition including
5 depositing the excavated stuff in uniform layers 16.00 Cum 81.50
in banks or as directed etc. complete for lead up
to 1.0 km and lift.( By machinery)( a ) Above
Providing and laying Plain/Reinforced cement
concrete of cement, sand and metal (20 mm to
mm size) in following proportion laid in situ
6 including centering, shuttering, temping, smooth 15.00 Cum 4943.90
finishing, curing etc. complete as directed for all
leads and lifts.(Manually With Conventional
Mixer) (iv) 1:2:4
Earthwork in embankment using selected soil
,soft & hard murrum excavated from approved
borrow area/village tanks etc. including breaking
clods,dressing to the design section with lead
upto 2.0 kilometer and all lifts.(By poclane
Compaction of selected soil/ hardmurrum/ soft
murrum in even thickness of 15 to 20cms
including watering rolling of suitable capacity
etc. complete as directed.
9 Providing and laying plain / Reinforced cement
concrete lining of M-15 grade in bed, side slope
and curveture including batching mixing
transporting, placing, smooth finishing, curing
including dewatering where required
(machinery based without paver)
10 Providing and fixing in position (different
diameter) NP2 R.C.C pipe with collar including
filling and caulking the joints with cement 18.00 Rmt. 627.30
mortar 1:1 proportion, finishing, curing etc.
complete for all lead and lifts.
11 Providing and Fixing in position vertical Steel out
late Gate including fabrication, cutting, welding
and two coat oil paint and one coat red oxide
(Prime coat), greasing ect. Complete as per
drawing or as directed. Rate for one gate (Size
12 Providing and Filling Asphalt of the approved
make and sand in the expansion and contraction
joints in the c.c.lining including clearing the 3430.00 Rmt. 68.03
joints with air water jet.
13 Providing videography on the occasion of
function or for ongoing construction work 4hr/
including dubbing, titling etc. complete including D
cost of cassate/CD. (b) up to 4 hours
14 Providing & Fixing in position Signboard of
standard size of 1.20 x 0.90 meter with M.S angle
40mmx40mmx6mm with 3mm thick iron plate
including fixing in 1:5:10 proportion concrete 1.00 No 3011.30
block size 40 cmx40cmx75cm including painting
existing data on the board etc. complete as
Rupees Forty Nine lakh Thirty Eight Thousand Five Hundred Ninety Nine Paise Sixty
I/We am/are willing to carry out the work at .......................... % above/below percent (Should
be written in figures and words) of the Estimated amount put to tender
estimated rate mentioned above. Amount
of my /our tender works out as
under.Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Surat Canal Sub Division No.2 Surat Canal Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ final- Bardoli Br. 2L kareli.pdf
SBD-final- Bardoli Br. 2L kareli.pdf
Download all tender documents and submit your bid