Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC AOC issued | |
| 2 | L2₹4.2 L+₹13,962.26 (3.41%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹4.3 L+₹22,928.45 (5.60%)Rejected-Finance | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Sajith Emmanuel L1 | LALU PAUL L2 | FASIYA P D L3 |
|---|---|---|---|---|---|---|
| 1.00Side protention wall | ||||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 20 | hour | 276.95 ₹5,539 Lowest | 286.4 ₹5,728 | 300 ₹6,000 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 8.96 | cum | 2,009.32 ₹18,003.51 Lowest | 2,077.89 ₹18,617.89 | 2,100 ₹18,816 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 21.75 | cum | 288.98 ₹6,285.32 Lowest | 298.84 ₹6,499.77 | 310 ₹6,742.5 |
| 1.00 | OD503421/2024-2025:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 7.17 | cum | 1,431.01 ₹10,257.48 Lowest | 1,479.84 ₹10,607.49 | 1,500 ₹10,752 |
| 1.00 | OD503422/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 89.97 | cum | 3,397.42 ₹3,05,659.08 Lowest | 3,513.36 ₹3,16,089.97 | 3,600 ₹3,23,884.8 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 25.8 | sqm | 326.29 ₹8,418.28 Lowest | 337.42 ₹8,705.44 | 340 ₹8,772 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5 | cum | 7,169.09 ₹35,866.96 Lowest | 7,413.74 ₹37,090.94 | 7,420 ₹37,122.26 |
| 1.01 | 5.22.3:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars | 200.12 | kilogram | 95.66 ₹19,143.48 Lowest | 98.92 ₹19,795.87 | 100 ₹20,012 |
Tender Value
₹4.2 L
EMD Value
₹10,578
Closing Date
20 Mar 2025, 6:00 pmClosed
ASSISTANT ENGINEER
LSGD SECTION MARANGATTUPILLY GP MARANGATTUPILLY P O
Annual Plan-MGPLY 2024-25 Proj No. 90/25- Side protection wall for poovathumkal valiyathodu arappupalam area -General Civil Work
2025_LSGD_749969_1
78/AE/LSGD/MGPLY/24-25
Open Tender
Civil Works - Others
Item Rate
MARANGATTUPILLY
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
₹10,578
Yes
19 Feb 2026
13 Mar 2025
22 Mar 2025
13 Mar 2025
20 Mar 2025
13 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1213868.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .