| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹98.6 LAccepted-AOC | L-1 | Accepted-AOC AS PER DECIDED IN CWC-II ON DATED 22/09/2023 | |
| 2 | L-2₹1.3 Cr+₹26.6 L (27.0%)Rejected-AOC | L-2 | Rejected-AOC AS PER DECIDED IN CWC-II ON DATED 22/09/2023 | |
| 3 | L-3₹1.6 Cr+₹58.7 L (59.6%)Rejected-AOC | L-3 | Rejected-AOC AS PER DECIDED IN CWC-II ON DATED 22/09/2023 | |
| 4 | L-4₹1.8 Cr+₹80.8 L (82.0%)Rejected-AOC | L-4 | Rejected-AOC AS PER DECIDED IN CWC-II ON DATED 22/09/2023 |
Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
28 Aug 2023, 2:30 pmClosed
GENERAL MANAGER
O.F.BHANDARA
Construction of Rainwater Drain surrounding the building Pyroxyline and its Sub- Station Building inside factory at O.F.Bhandara.
2023_MIL_164401_1
No.EO/51/ND2306/BF
Open Tender
Civil Works
Item Rate
60 days
O.F.Bhandara
As per Tender Documents.
7 documents required · 7 mandatory
₹0
₹2.3 L
Yes
24 Sept 2023
12 Aug 2023
30 Aug 2023
12 Aug 2023
28 Aug 2023
12 Aug 2023
Amount
Surface dressing n exc 15 cm deep in hard dence soil and getting out as directed by EIC
Excavating in trenches, not exc 1.5m wide and not exc 3.0 m in depth; for foundation etc. or for shafts, wells, cesspits, manholes, pier holes etc. not exc 10 sq. m on plan and not exc 1.5m in depth and getting out in hard/dense soil, complete all as specified
M & L for hardcore of broken stone or boulders exc 63mm but n exc. 100mm, deposited, spread and levelled in layers n exc. 15cm thick, watered and rolled/rammed to a true surface,complete all as specified
M & L for sand filling under floors or in foundations including watering and consolidation, complete all as specifiedand as directed by E-I-C.
M & L for PCC 1:4:8 Type D2 using 40mm graded aggregate as in foundations, filling and mass concrete complete all as specified and as directed by the Engineer-in-Charge.
Reinforced cement concrete (design mix)in:- M-25 Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by the E-I-C (20 mm aggregates)
M&L Walls, retaining walls, basement walls, ballast walls and the like; any thickness; above top of footings; including attached pilasters and buttresses®
M & L for mild steel deformed or twisted bars of 8 mm dia & over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including M.S. wire (annealed) not less than 0.9mm
Formwork to flat Rough finished faces of walls, retaining walls, butments,parapets and staircase railings and similar work includingattached pillasters, buttresses,etc.; vertical or to batte
M & L for rendering 25mm thick in cement plaster 1:4 on fair faces of brick work or concrete surfaces & is to be finished even and smooth complete all as specified and as directed by the Engineer-in-Charge
Providing precast cement concrete solid building blocks or slabs 10cm thick (with plain or interlocking joints as directed) setting in mortar,complete, in walls ( Type B1 1:2:4, 20 mm graded aggregate).
M&L PVC (SWR) pipes single socketed, in any length 75mm with rubber ring joints, laid in trenches or in floors
Returning, filling of Hard/dense soil including spreading, levelling, watering and well ramming in layers not exc 25 cm.
M & L for removing excavated material Soil, exc. 250 m but n exc. 500 m and depositing where directed, complete all as specified
M A BUILDERS
DARSHAN SINGH PLAHA
Yugandhar S Nathe
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .