| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr | L1 | Accepted-AOC Minimum Rates |
| 2 | L2₹7.0 Cr+₹2.1 Cr (42.2%)Rejected-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹7.0 Cr+₹2.1 Cr (42.2%) | L2 | Rejected-Finance EMD Refunded |
Tender Value
₹3.5 Cr
EMD Value
₹6.9 L
Closing Date
8 Jul 2024, 3:00 pmClosed
SAMEER SHARMA
EE PHE Division Panchkula
Construction of Main Pumping Station 2.00 MLD, Sewage Treatment Plant, 2.00 MLD, Brick Masonry Pump Chamber of Size 9.15 x 4.57 m, Brick Masonry Boundary Wall 360 mtrs. and Laying of Sewer Line 1180 mtrs.
2024_HRY_383173_1
202463F41011 1F10 4388 A39B 87C81D4A4181547PUH
Open Tender
Civil Works
Works
540 days
Pinjore
2 documents required · 2 mandatory
₹15,000
Yes
₹6.9 L
Yes
30 Oct 2024
25 Jun 2024
8 Jul 2024
25 Jun 2024
8 Jul 2024
25 Jun 2024
Amount
Providing and Installing 3 Nos. CCTV Cameras for MPS and STP complete as per satisfaction of the Engineer-In- Charge along with 90 days recording (NVR), 32 inch LED Screen, 16 Channel NVR and 8 Channel NVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility, including Operation and Maintenance for 12 months during defect liability period after trial run of 3 months and O and M 5 years threafter.
Provision for automation system consisting of PLC with controller and modules for Analog and Digital signals, SCACA software, Electromagnetic Flowmeter, Ultrasonic Level Tx. Pressure Transmitters, Analyzer System Consisting of dissolved Oxygen, online PH and TDS including commissioning complete in all respects on STP including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter.
Construction of HT/LT Panel Room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, windows and fittings with toilet block including all Sanitary fittings etc. at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminium frame of size 100mm x 45mm of 10 gauge for chowkhat, 75 mm x 45mm o 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame with 5 mm thick glass AIs/ Saint Gobain/ Modi Float, covered area ( 300 sqm.) including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter.
SEWERAGE TREATMENT PLANT (2.20 MLD) Design, construction, erection, testing and commissioning of 2.20 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping, MCC Panel Room, all other contingent ie. Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS at STP including furniture and laboratory equipments as per detail given in the bid document and following components including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. Supply and installation 2 Nos. fine Screens of suitable size for 2.20 MLD average flow with peak factor of 3.00 including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED suitable size, outdoor type energy efficient lamps on each pole, 20 no. LED outdoor light with 7 m. high GI pole along road / path including all accessories complete in all respect including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. Supply and installation of 1 No. 3.65 m wide Main Gate of MS and 1.25 m. wide wicket gate at STPto the entire satisfaction of Engineer-in-charge. (Total weight not less than 500 kg) including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentation, electric panel board etc. as per design complete in all respect including packing dry sludge in 20 Kg. bag and supplying the same in market Kisan Sewa Kendra or as directed by Engineer-in-charge within the lead as pointed at clause 4.4.4 of the DNIT including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter
MPS AT STP Design, construction, erection, testing and commissioning of MPS and following components: RCC Inlet chamber, screening chamber, collecting tank, , wet well sump suitable for 2.20 MLD average flow with peak factor 3.00 including Providing and installing 5 no. non clog sewage submersible pump sets ie. 1 No.of 5000 LPM , 2 No. 1650 LPM and 2 no. of 800LPM having minimum head of 12 m, equipped with suitable LT panel boards, all safety devices, automatic capacitor bank and suitable size submersible cable from LT panel to pumps complete in all respect including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, sluice valves, non returning valves as per requirements even for bye-pass arrangements complete in all respect including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. 3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. Supply and installation of 2 mechanical coarse screens suitable for for 2.20 MLD average flow with peak factor of 3.0 complete in all respect including OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. e Entire infrastructure except construction of staff quarter, Boundary wall, path ways / roads and work covered under Schedule - (HSR - Items) required to be executed at site to make the MPS functional is included in the scope of work for lump-sum job. All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. Raw sewage will be available near boundary wall within the premises of proposed STP but the conveyance of Sewage through DI pipe of suitable diameter, from this terminal point to the receiving Chamber of the MPS is included in the Turnkey contract. The Level of the MPS / STP will be as per bed level of existing incoming sewer at MPS. The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work.
Bidder Name
Amount
BHIM SAIN CONTRACTOR (GSTN-06AOHPS1509K1ZS) BID ID -1108014
RAJEEV KUMAR GOEL CONTRACTORS(GSTN-NA)--1111099
RAJEEV KUMAR GOEL CONTRACTORS
BHIM SAIN CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .