Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC B 46 INDUSTRIAL AREA SECTOR 59 NOIDA UP 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.0 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹2.0 Cr+₹1.0 Cr (100.1%)Rejected-Finance | ₹2.0 Cr+₹1.0 Cr (100.1%) | L2 | Rejected-Finance 2nd lowest |
Tender Value
₹2.1 Cr
EMD Value
₹4 L
Closing Date
30 Jun 2017, 5:00 pmClosed
General Manager
Office of the General Manager Construction Circle Ganga Uttarakhand Peyjal Nigam Jagjeetpur Haridwar 249407
Supply Installation And Commissioning Of Online Monitioring System At Three and Half MLD STP Tapovan Including 15 Year O and M On DBOT Model
2017_MDPEY_6874_2
Letter No 892/Lekha-6/99 Dated 23.03.2017
Open Tender
Composite Works
Item Rate
180 days
Tapovan New Tehri
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,750
Project Manager C and M Unit Ganga UKPJN
₹4 L
Haridwar
25 Jul 2025
17 Jun 2017
1 Jul 2017
17 Jun 2017
30 Jun 2017
23 Jun 2017
20 Jun 2017
Amount
Price Schedule : Part A Design, Drawing, Installation of online monitoring system proposed for inlet & outlet of existing 3.5 MLD S.T.P as per CPCB guidelines.
PART - B – Bidder has to quote the annual O&M prices of Online Monitoring System at 2 points for existing 3.5 MLD STP Tapovan for those works which are proposed on yearly cost for Operation & maintenance (Cost of Manpower to be deployed, Maintenance, preventive and Breakdown Maintenance of equipments etc.)
For 1st year of operation
For 2nd year of operation (Escalated @5% on previous year)
For 3rd year of operation (Escalated @5% on previous year)
For 4th year of operation (Escalated @6% on previous year)
For 5th year of operation (Escalated @6% on previous year)
For 6th year of operation (Escalated @6% on previous year)
For 7th year of operation (Escalated @7% on previous year)
For 8th year of operation (Escalated @7% on previous year)
For 9th year of operation (Escalated @7% on previous year)
For 10th year of operation (Escalated @8% on previous year)
For 11th year of operation (Escalated @8% on previous year)
For 12th year of operation (Escalated @8% on previous year)
Fo13th year of operation (Escalated @9% on previous year)
For 14th year of operation (Escalated @9% on previous year)
For 15th year of operation (Escalated @9% on previous year)
Errand Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .