Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC 226 DANTALI INDUSTRIAL ESTATE GOTA VADSAR ROAD NR AHMEDABAD CITY AT DANTALI TA KALOL GANDHINAGAR GUJARAT 382721 | GANDHINAGAR | GUJARAT | 382721 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.5 L+₹2.4 L (24.0%)Rejected-Finance 108 A MADANGIR NEW DELHI DELHI 110062 | SOUTH DELHI | DELHI | 110062 | L2 | Rejected-Finance Rejected | |
| 3 | Rejected-Technical 10 RUKMA COMPLEX SHRENIK CHAR RASTA AKOTA VADODARA GUJARAT 390020 UDYAM GJ 24 0002994 | VADODARA | GUJARAT | 390020 | - | Rejected-Technical Disqualified |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
19 Feb 2020, 3:00 pmClosed
Facilities Officer
INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD
Design, Supply, Installation, Testing and Commissioning of Two Cold Storage with 1 plus 5 years All-in-all comprehensive maintenance and servicing at IMDC Dinning Hall, IIM Ahmedabad.
2020_IIMA_542299_1
IIMA/Contracts/TW-114/2019-20
Open Tender
Miscellaneous Works
Works
365 days
INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD
As per NIT Chapter-1
6 documents required · 6 mandatory
₹590
Yes
INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD
₹30,000
INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD
10 Mar 2022
6 Feb 2020
20 Feb 2020
6 Feb 2020
19 Feb 2020
12 Feb 2020
6 Feb 2020 - 10 Feb 2020
10 Feb 2020
Amount
Design, Supply, Installation, Testing & Commissioning of Pre- Fabricated Puff Panel of Two Cold room (as described below) with Refrigeration Systems at IMDC Dining Hall New Campus, IIM Ahmedabad.
Cold room and Refrigeration System Cold Room-I Outer Size (inch) - 87.25” X 93” X 108” (W X D X H) Note:- (Refer the Technical Sheet (Annexure-C) & Design (Annexure-D)
Cold room and Refrigeration System Cold Room-II Outer Size (inch) :- 93” X 104.5” X 108” (W X D X H) Note:- (Refer the Technical Sheet (Annexure-C) & Design (Annexure-D)
All-in-all comprehensive maintenance & servicing for the above work, after the end of Year-1(Defect Liability period).
2nd Year Comprehensive Maintenance and Onsite Support at IIM Ahmedabad Campus Sub Total = Y2
3rd Year Comprehensive Maintenance and Onsite Support at IIM Ahmedabad Campus Sub Total = Y3
4th Year Comprehensive Maintenance and Onsite Support at IIM Ahmedabad Campus Sub Total = Y4
5th Year Comprehensive Maintenance and Onsite Support at IIM Ahmedabad Campus Sub Total = Y5
6th Year Comprehensive Maintenance and Onsite Support at IIM Ahmedabad Campus Sub Total = Y6
Buy Back Items
Dismantling & Buyback of Existing Cold Room (Bidder should visit to check existing system) (Refer Annexure-C)
CLIMATROL CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .