Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.0 LAdmitted-Finance | -16.56% | ₹78.0 L | L1 | Admitted-Finance |
| 2 | L2₹80.5 L+₹2.5 L (3.20%)Admitted-Finance | -13.89% | ₹80.5 L+₹2.5 L (3.20%) | L2 | Admitted-Finance |
| 3 | L3₹86.8 L+₹8.8 L (11.3%)Admitted-Finance | -7.11% | ₹86.8 L+₹8.8 L (11.3%) | L3 | Admitted-Finance |
Tender Value
₹93.5 L
EMD Value
₹1.9 L
Closing Date
14 Sept 2026, 6:00 pmClosed
SE and PM, WCDC Kota
SE and PM, WCDC Kota
Construction of NRM works under MJSA 2.2 PCD (8 nos.), G.P. Arandkhera, Jakhora, Godliyahedi, Gandifali in P.S. Ladpura
2026_WDSC_595232_6
NIT No. 09/2026-27
Open Tender
Civil Works
Percentage
180 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
SE and PM, WCDC Kota
₹1.9 L
17 Sept 2026
5 Sept 2026
15 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | taxy dh lQkbZ] Hkkjh >kfM+;ksa rFkk 30 lseh yisV rd ds ikS/kksa dks dkVus lesrA | 10,800 | Sqm | 3.6 | ₹38,880 |
| 2 | uhao] [kkbZ] ijukyk esa 1-5 xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk] cxy dks laokjuk] [kqnh feV~Vh dks ckgj fudkyuk] uhao Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k djukA l[r] fpduh dadj feV~Vh esaA | 1,267.03 | Cum | 178.46 | ₹2,26,114.17 |
| 3 | lhesUV] daØhV 1 lhesUV % 4 jsr % 8 fxV~Vh iRFkj dh 40 feeh ukHkh; eki dh uhao esa Mkyuk] dwVuk rFkk rjkbZ vkfn lfgrA (i) 40 ,e,e Ø’kj czksdu iRFkj dh fxV~Vh ds LFkku ij gkFk ls VwVh gqbZ jksM+h ds mi;ksx djus ij ogh ek=k ns; gksxh ijUrq fxV~Vh dh nj esa 30% dh dVkSrh dh tkosxhA (ii) Vibrator and Mixture dk mi;ksx ugha djus ij 3% dh dVkSrh dh tkosA | 182.07 | Cum | 3,740.68 | ₹6,81,065.61 |
| 4 | lhesUV] daØhV 1 lhesUV % 3 ctjh rFkk 6 fxV~Vh iRFkj dh 20 fe-eh- ukHkh; eki dh uhao esa Mkyuk] dwVuk rFkk rjkbZ vkfn lfgr ,uhdV ds fy,A Vibrator and Mixture dk mi;ksx ugha djus ij 3% dh dVkSrh dh tkosA | 1,051.39 | Cum | 3,902.16 | ₹41,02,692 |
| 5 | lhesUV dUØhV 1 lhesUV % 2 ctjh % 4 ,XkzhxsV vuqikr esa iRFkj dh 12 fe-eh- ukHkh; eki dh ,XkzhxsV ds lkFk Mkyuk] dwVuk rFkk rjkbZ vkfn lfgrA | 509.85 | Cum | 4,664.02 | ₹23,77,950.6 |
| 6 | Supply of Tor Steel anchor bars of required dia, length and shape at site of work complete. | 11,680 | Kg | 86.42 | ₹10,09,385.6 |
| 7 | lhesUV IykLrj nhokj ij 1%4 vuqikr esa lhesUV&ctjh feykdj tksM+us dks dqjsnus rFkk 14 fnu rd fu;fer rjkbZ lesrA 12 fe-eh- eksVkbZA | 804.47 | Sqm | 159.41 | ₹1,28,240.56 |
| 8 | lsUVfuax 'kVfjax ¼r[rk ,oa <qykcanh½ dk vkj-lh-lh- Nr] Lysc] NTts] fyUVy vkfn Mkyus ds fy, yxkuk 4-5 ehVj Å¡pkbZ rd ds fy, rFkk gVkuk vkfn fo’ks"k fooj.k ds vuqlkjA 'kVfjax LVhyA | 512.23 | Sqm | 261.72 | ₹1,34,060.84 |
| 9 | ts-lh-ch- e’khu@VªSDVj e; LØsij }kjk feV~Vh [kqnkbZ dk;Z] [kksnh gqbZ feV~Vh dks 15 ls-eh- ijr esa nckuk ¼compaction½ ,oa ck.M ¼bund½ dk lsD’ku ¼dkV {ks=Qy esa½@çksQkby la/kkfjr djuk e; p<+kuk ,oa mrkjuk çkjafHkd yhM 250 eh- ,oa fy¶V 3 ehVj rdA bZdkbZ 1 ?ku eh-A e’khujh dk;Z l[r feV~VhA ¼in hard soil½ | 8,900 | Cum | 70.88 | ₹6,30,832 |
| 10 | lwpuk cksMZ lkbZV ij yxkuk lfgrA | 8 | Nos. | 2,000 | ₹16,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_1055905.xls
BOQ • 0.24 MB
TenderDocument06.pdf
Tender Documents • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .