Tender Value
₹1.5 Cr
EMD Value
₹4.4 L
Closing Date
12 Oct 2026, 4:00 pm
Executive Engineer IFCD Ganderbal
Irrigation and FC DIvision Ganderbal
Sindh Nallah-Construction of flood protection works on critical spots from RD 35.09KM to RD70.98KM viz Zirpura kullan, Batkullan bridge, Palpura Hayan, Harihanwan, Akhal, Kangan, Bela Wussan, Batpura grar, Dragtungo, Sumbal and Bela Haripura on left
2026_IFC_326383_1
eNIT NO 25 OF 2026-27
Open Tender
Civil Works
Percentage
300 days
Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,200
Executive Engineer IFCD Ganderbal
₹4.4 L
29 Sept 2026
29 Sept 2026
13 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 6,220.73 | Cum | 187.3 | ₹11,65,142.73 |
| 2 | Supply of GI wire crates of specified size 16' * 16', made of 4mm dia GI wire with 4"*4" mesh (100 mm * 100 mm) including proper fabrication , weaving, binding and testing from any Government-approved testing agency , confirming to relevant IS standards and including carriage by all means up to site of work, stacking, handling and all incidental charges , complete in all respects as per directions of Engineer-in-Charge. | 2,60,662.96 | Sft | 24 | ₹62,55,911.04 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 5,689.2 | cum | 371.15 | ₹21,11,546.58 |
| 4 | Extraction / collection of stone bouders. | 4,986.83 | cum | 562.81 | ₹28,06,637.79 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 2,532.55 | cum | 218.4 | ₹5,53,108.92 |
| 6 | Supply of stone boulders | 702.36 | cum | 700 | ₹4,91,652 |
| 7Carriage of different materials by Mechanical Transport including loading ,unloading and stacking from different sources upto site of work. | |||||
| 7.1 | Stone boulders for an average lead of 01 Km. | 3,011.79 | cum | 151.47 | ₹4,56,195.83 |
| 7.2 | Stone boulders for an average lead of 04 Km. | 702.36 | cum | 215.98 | ₹1,51,695.71 |
| 8Carriage of material from dumping site to actual site of work, including loading,unloading and stacking etc. complete by manual labour (Av Lead of 100 Mtrs) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.86 MB
BOQ_1103909.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .