Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | L1 | Accepted-AOC First lowest | |
| 2 | L2₹14.0 L+₹34,699.39 (2.53%)Rejected-Finance | L2 | Rejected-Finance Second lowest bidder | |
| 3 | L3₹14.1 L+₹36,410.93 (2.66%)Rejected-Finance | L3 | Rejected-Finance Third lowest bidder | |
| 4 | L4₹14.2 L+₹54,381.25 (3.97%)Rejected-Finance | L4 | Rejected-Finance Forth lowest bidder | |
| 5 | L5₹15.8 L+₹2.1 L (15.6%)Rejected-Finance KOLLAYIL KERALA | KOLLAM | KERALA | 689694 | L5 | Rejected-Finance Fifth lowest bidder. |
Tender Value
₹17.6 L
EMD Value
₹26,399
Closing Date
4 Oct 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer,PWD Roads Division Thiruvananthapuram
Road work
2021_PWD_442191_1
PWD/RB/TR/99536/2021_5_1/1
Open Tender
Civil Works - Roads
Item Rate
26 days
Parasala.
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹26,399
Yes
2 Dec 2021
29 Sept 2021
6 Oct 2021
29 Sept 2021
4 Oct 2021
29 Sept 2021
60 days
Amount
Appendix 1
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.23:Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
AJITH.S.V
JOHN VICTOR G
JOHN VICTAR.A
T K Raveendran
SATHYARAJ T
JOSE M
Bidder Name
JOHN VICTAR.A
BALARAJ G
T K Raveendran
SATHYARAJ T
JOSE M
JOHN VICTOR G
AJITH.S.V
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_629198.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .