Loading…
Loading…
Tender Value
₹60.4 L
EMD Value
₹1.2 L
Closing Date
2 Sept 2026, 4:00 pm
Executive Engineer PWD Division Poonch
Executive Engineer PWD Division Poonch
Permanent Restoration of road from Kasana to Bania ,Tehsil Haveli,District Poonch
2026_PWDJK_321703_2
e-NIT No.87/2026-27 dated 21-8-2026
Open Tender
Civil Works
Percentage
60 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Yes
Executive Engineer PWD Division Poonch
₹1.2 L
Yes
21 Aug 2026
21 Aug 2026
3 Sept 2026
21 Aug 2026
2 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 851.5 | Cum | 256.85 | ₹2,18,707.78 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with :1:5:10 ( 1 cement :5 coarse sand :10 graded stone aggregate 40 mm nominal size ) | 60.08 | Cum | 4,826.5 | ₹2,89,976.12 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 330.73 | Cum | 5,733.6 | ₹18,96,273.53 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand).Nallah | 236.6 | Cum | 5,402.9 | ₹12,78,326.14 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 285.8 | Cum | 2,793.8 | ₹7,98,468.04 |
| 6 | Stone Filling in wire crates , including cost of wire crates and
all carriages upto site of work complete. | 302.4 | Cum | 2,400 | ₹7,25,760 |
| 7 | Restoration of rain cuts ,damage road surface patches by way of supplying & filling RBM in layers not exceeding 20cm in depth rolling each layer with power load roller including carriage from source to site including unloading stacking, laying watering dressing etc complete job. | 450 | Cum | 550 | ₹2,47,500 |
| 8 | Dumping stone including cost of stones. On Horizontal on level. | 151.8 | Cum | 937.9 | ₹1,42,373.22 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 101.2 | Cum | 218.4 | ₹22,102.08 |
| 10Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_1075291.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].