Loading…
Loading…
Tender Value
₹50.0 L
EMD Value
₹49,981
Closing Date
30 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Dy.Minicipal Commissioner - West Zone
Upgradation Drainage Line Ragarding C.C.R.S. Complaine at GHB, Chali Area, Gamtal Area in Sardar Patel Stadium ward, West Zone.
298255
9/25-26 (T.N.80)
Open
Civil Works - Others
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Municipal Commissioner, Ahmedabad
₹49,981
21 Apr 2026
21 Apr 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
Name of work:- Upgradation Drainage Line Ragarding C.C.R.S. Complaine at
GHB, Chali Area, Gamtal Area in Sardar Patel Stadium ward, West Zone.
No. Qty Item Rate Per Amount
1 Excavation for pipe line trenches for water supply,
sewerage lne, manhole etc. all with shoring and struting
if required as per required gradient and line
including safety provisions using site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified. (Item no. 1 - Part-1&2 -Labour Sec,
GWSSB SOR 2022-23)
200.00 Upto 1.50 mt depth 89.00 Cmt
10.00 1.5 mt to 3 mt depth 98.00 Cmt
10.00 3.00 mt to 4.50 mt depth 103.00 Cmt
10.00 4.50 mt to 6.00 mt depth 109.00 Cmt
15.00 6.00 mt to 7.30 mt depth 113.00 Cmt
Excavation in bituminous road as per required gradient
and line including safety provisions using site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. Complete for all lifts as
specified (Item no. 2 - Part-1&2 -Labour Sec, GWSSB
50.00 Excavation in Bituminous road 251.00 Cum
Refilling the pipeline trencheds incl. ramming,
watering, consolodating desposal of surplus stuff as
directed within a radius of 3 km. (Item no. 14 - Part-
3 1&2 -Labour Sec, GWSSB SOR 2022-23)
50.00 Refilling as directed 22.00 Cmt
--do-- with selected soil brought from outside
20.00 including all lead 175.00 Cmt
4 Conveyance charge of earth,lime,murrum,
building rubbish,manual garbage,sludge ,excavated
rock,fly ash, aggregate of any kind etc. comp. up to
5Km. lead (Based on Building SOR 2015-16, P-589 -
250.00 Item code- 3.2.1) 125.33 Cmt
Providing and supplying ISI marked only standard
length Stonewate pipes in standard lengths of
following class and diameter including all
taxes,insurance, transportiton, fright charges,
octroi,inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc.
complete (IS - 651 - 1989) (Item no. 11, Part-1&2 -
5 Material Sec. GWSSB SOR 2022-23)
Lowering, laying and jointing stone ware pipes of
following diameters with cement joints in C.M.1:1
proportion in proper position , grade and alignment
at all level as directed by Engineer-in- charge
including conveyance from stone to site of work,
Jointing material etc.comp.(Item no. 12, Part-1&2,
6 Labour Sec. GWSSB SOR 2022-23)
Providing and supplying ISI Standard RCC pipes (of
sulphate resisting Cement ) in standard lengths of
following class and diameter suitable for rubber ring
joints (socket and spigot) including all
taxes,insurance, transportation,treight
charges,octroi,inspection charges,
loading,unloading, conveyance to departmental
stores, stacking etc. complete. (Item No. 10.1.D, Part-
7 1&2 A, Material Sec., GWSSB SOR 2022-23)
Class NP3 Test pressure 0.7 Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1
1/2 of following diameters in proper position , grade and
alignment at all level as directed by Engineer-in-
charge including conveyance from stone to site
of work, labour giving hydraulic testing as per ISI
code. (Item No. 11.b, Part-1&2, Labour Sec., GWSSB
5.00 500 mm dia 189.00 Rmt
5.00 600 mm dia 228.00 Rmt
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement
slurry, Brick masonary in CM 1:5 & excluding the
cost of chamber seat cover etc..completed. (Based
9 on Drainage SOR 2009-10)
0.60 X 0.45 mt. size Inside Clear, Depth from
5.00 0.0 to 0.90meter for pipe dia <=150 mm. 2261.60 No
0.60 X 0.75 mt. size Inside Clear, Depth from
5.00 0.0 to 0.90meter for pipe dia <=20 mm. 2874.10 No
0.75 X 0.75 mt. size (Inside Clear) Depth from
10.00 to 1.20 meter for pipe dia <=20 mm 3905.35 No
10 Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling, Brick
Bats Cement Concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With
Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated
Steps 35 Cm C/C At 35 Cm Staggered Masonary In
Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness
C.M.,Including Cantering & Reinforcement (Single jalli
at 15 C.M. c/c bothway 10 mm dia.)But Excluding
The Cost Of Manhole Seat Cover Etc..Completed
Of Size 0.75 X 1.00 Meter (Inside Clear, M.H. length
should be parallel to the flow) (Based on Drainage
1.00 to 2.00 meter depth, (Slab at Ground level) (for
5.00 pipe dia<=230 mm) 5651.78 No
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From
5.00 G.L.) (for pipe dia <=300 mm) 11395.54 No
11 Rate reduction over item of Constructing Slab Type
M.H. Chamber of size 1.00 x 0.75 mt for constructing
slab @ depth more than 0.60 mt below Ground
Level (Max. 3 unit of DM should be reduced in this
item) (As Per R.A. Based on Building SOR 2015-16)
12 Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) in CM 1:3, finishing with
cement slurry, P/F 4 mm dia M.S.Steel HDPE coated
steps 35 cm c/c at 35 cm staggered in masonary
CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
including Cantering & reinforcement (double jalli at
C.M. c/c bothway 12 mm dia.) but excluding the
cost of Manhole seat cover etc..completed. of Size
1.00 X 1.40 meter (Inside Clear, M.H. length should be
parallel to the flow, for pipe dia <= 800 mm) (Based on
Drainage SOR 2009-10)
10.00 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No
2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From
3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From
5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From
7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From
Extra rate over item of Constructing Slab Type
M.H. Chamber of following size for constructing
M.H. Chamber, per 1.00 Decimetre of additional
depth or part thereof. etc. complete. Of size 1.00 x
1.40 mt. (inside clear) and Depth from (Based on
13 Drainage SOR 2009-10)
1.00 4.00 to 5.00 meter depth, 521.42 DM
1.00 6.00 to 7.00 meter Depth 536.60 DM
1.00 8.00 to 9.00 meter Depth 551.78 DM
1.00 9.00 to 10.00 meter Depth 564.28 DM
Rate reduction over item of Constructing Slab Type
M.H. Chamber of size 1.00 x 1.40 mt for constructing
slab @ depth more than 0.60 mt for ( MH 2 to 3 mt
depth) and 1.0 mt for (MH above 3.0 mt depth) below
Ground Level (Max. 5 unit of DM should be reduced in
this item) ( As Per R.A Based on Building SOR 2015-
Dismantling of existing Arch type manhole up to
Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and &
finished 15 mm thick cement plaster inside in CM
1:3, P/F 4 mm dia M.S.Steel HDPE coated steps
cm c/c at 35 cm staggered in masonry CM 1:5, incl.
cost of RCC Slab in CC 1:1.5:3, including Cantering &
reinforcement as directed by engineer in charge.
Rate includes carting of debris and excavated soil
1.00 x 0.75 mt (inside clear) RCC Slab of thickness
C.M& reinforcement (Single jalli at 15 C.M. c/c bothway
10 mm dia.) From 0 to 2 mt depth (Slab at Ground
5.00 level) 5892.85 No
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth
(Slab at below 1.00 mt. From
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
20.00 Ground level) 8080.35 No
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
10.00 below 1.00 mt. From G.L.) 17008.93 No
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 3 to 4 mt depth (Slab at
5.00 below 1.00 mt. From G.L.) 24776.79 No
16 Provdg. & laying S.W. Gully trap with brick
masonry chamber & water tight G.T.Stone including
fixing of cover Square mouth trap 100 mm x100 mm
size P-Trap ( Based on Building SOR 2015-16, P-279
10.00 Item code- 24006B) 656.25 No
17 Making connection to the ex. M.H.in running sewer
incl. Dewatering and other required machinery etc.
of following dia pipes at any convenient time. All
damaged work shall be well repaired as per
instructions. etc..complete. (Based on Drainage SOR
b 50.00 b. 400 mm to 600 mm dia. 2232.14 No
18 Cutting the pipes of following dia coming in the new
M.H.in running sewer including cutting bars,
including removing debris /silt from the M.H. and
carting at a suitable distance etc..complete as
directed. No payment for M.H. work will be made
until pipe is not cut completely in all respect.
(Based on Drainage SOR 2009-10)
b 50.00 400 mm to 600 mm dia. 1687.50 No
19 Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster
in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and
carting the same as directed. (Based on Drainage
a 50.00 (A) up to 0.15 mt. (@ Two Coarse) 732.14 No
b 50.00 (B) up to 0.35mt. (@ Four Coarse) 1160.71 No
c 100.00 (C) up to 0.65 mt. (@ Seven Coarse) 1794.64 No
d 50.00 (D) up to 0.90 mt. (@ Ten Coarse ) 2160.71 No
20 Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick masonry
in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the
same as directed. (Based on Drainage SOR
21 RCC Precast M.H.Frame & Cover Manufacture
supply & Delivery at store or at side of work Precast
RCC M200 Frame & Cover Suitable to drainage M.H.
and as per type design & Drawing including cost of
reinforcement M.S. Angles or Flat , cutting mold work
etc.(Item No. 10.4, Part-1&2 A, Material Sec., GWSSB
1 12.00 Frame Suitable for 50 Cm opening of MH 1121.00 No.
2 12.00 Cover Suitable for 50Cm Opening Of MH 1173.00 No
1 12.00 Frame Suitable for 50 Cm opening of MH 1000.00 No.
2 12.00 Cover Suitable for 50Cm Opening Of MH 1066.00 No
c House connection Chamber Light Duty
2 12.00 Cover 920.00 No
22 Carting and Fixing M.H. Chamber or Catchpite
Seat and Cover in line and level to match
exisisting road level in CC 1:2:4 and finishing
smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be
supplied by A.M.C.(from any store) (Based on
5.00 Drainage SOR 2009-10) 750.00 No
23 Temporary/Permanent plugging and blocking of sewer
line, branch connections and diversion of flows and
removal of all plugs, etc. (Item no. 6, Part-2 D
(Chambers&Manhole, GWSSB SOR 2022-23)
a 10.00 300mm dia. & below 1210.00 No
b 20.00 400 to 500mm dia. Sewer line 1452.00 No
c 20.00 600 to 700mm dia. Sewer line 2420.00 No.
24 Providing and fixing cast iron manhole frame of weight
80 to 85 kg suitable for existing EHD-35 FRC MH
cover, rate also incl. loading, unloading and fixing the
frame in line and level to match exisisting road level
in CC 1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as per instruction by
1.00 engg. in charge. (Approved Rate) 71.42 Kg
25 Raising of Existing manhole item includes,cutting of
existing road surround by Manhole by diamond
cutter machine dismantling of road in confined area by
breaker machine and carting of dismantal
material.item also included necessarey brick work to
raise the manhole at road level in CM 1:3 item also
included fixing of Manhole frame at exact road level by
using MaserEmaco S 488 trowable fibre
reinforced thixotropic repair mortal material Laying
of concrete made form Master Emaco 5 346 flowable
micro concrete material in desired thickness and
laying of hot bitumanous material in Upper layer
and compaction of hot bitumanious material by
palte compactor machine .Rate also included
necessary plaster at inside of manhole in CM 1:3 in
10.00 MM thickness on raised brickwork. 6830.35 No
26 Brickwork using common burnt clay building bricks
having crushing strength notless than 35kg./Sq.Cm.
in foundation and plinth in Cement Mortar 1:5 (1-
Cement:5-finesand) (B) Conventional (Item Code:
06001BA, Item No. 6.12 Building works, Ahmedabad
27 Supplying, labour for break down repairing work for
activities like excavation, disliting, removing debris
from trench back filling etc. comp. as directed by
Eng.in charge.(Based on Building SOR 2015-16)
a 1000.00 Mazdoor at day /Night 292.86 No
b 250.00 Makadam/ supervision at day / Night 310.71 No
28 Providing Dead Cantering using good quality Country
Wood Planks, wall Plate of required thickness and
size including placing the nece. supports of reqd.
size, nailing, fixing with mortar, levelling. All
specification for dead centring as per standard engg.
80.00 practice etc. comp. as directed. 312.50 Smt
29 Providing 15mm thick cement plaster in single coat on
Rough (Similar)side of single or half brick walls for
interior plastering upto floor two level and finished
even and smooth in (i) Cement mortar 1:3 (1-
cement:3-sand) finishing with a floating coat of neat
cement slurry. (I.No.17.6 + 17.69 R & B SOR 2021-22)
30 Supplying cutting, bending, binding and placing in
position steel as per plan and design and as per
IS 2502 including cost of steel and binding wire for
reservoirs/ structuresonly including lift up to 6 meter
height or depth below GL for all diameters (Item No.
9.2, Part-1 C1 RCC, GWSSB SOR 2022-23) TMT
bars Fe-415 grade for all diameters
31 Providing and laying cement concrete work
1:2:4 (1- Cement:2-Coarsesand:4-graded stone
aggregates 20mm nominal size) and curing
complete excluding cost of formwork and rein for
cement for reinforced concrete work in
(A)Foundations,footings,Base or columns and Mass
concrete (upto 10 ton) (Based on Building SOR
32 Providing and installation of barricading with retro-
reflective paint/ film/ tapes (Minimum 3.0Mt. height) as
specified in the drawing & specifications for the
construction of road work, along with necessary
diversion arrangement for existing traffic movement
in an unobstructed condition, all relevant markings,
sign boards and illumination as per relevant
MORT&H specification. Precoated galvanised iron
profile sheets shall be of approved make and
shade having 0.50 mm (+0.05 %) total coated
thickness with zinc coating 120 grams per sqm as
per IS: 277, in 550 mpa steel grade, 5-7 microns
epoxy primer on both side of the sheet and
polyester top coat 15-18 microns. Rate to be inclusive
of all materials, fabrication works, paint works for
information (retro reflective paint), foundation works,
transportation, loading, unloading, installation,
dismantling and inclusive of all taxes and including the
same design for providing openable gates. No extra
rental will be given to the contractor in case of any
delays from his part for construction or due to any valid
time limit extensions. Each barricading sheet is to
be numbered with a unique number. The
barricading provided shall be retained in position
at site continuously i/c shifting of barricading
from one location to another location as many
times as required during the execution of the entire
work till its completion. Rate include its maintenance
for damages, painting, all incidentals, labour
materials, equipments and works required to execute
the job. The barricading shall not be removed without
prior approval of Engineerin- Charge. (Note :- One
time payment shall be made for providing
barricading from start of work till completion of
work i/c shifting. The barricading provided shall
remain to be the property of the contractor on
completion of the work). Blinkers are to be
installed on the barricading and rate for blinkers will
be payable as per relevant item. Barricading is to be
200.00 cleaned by means of 654.91 Rmt
33 Barricading the entire break down or excavated
area on rental basis using wooden ballies / M.S.angles
at max. 2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board out side to avoid accident &
for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement
through out the work with necessary
required arrangement. ..The same shall be removed
after completion of work. (Only for break down work
from start to complete) (Based on Drainage SOR
34 Providing and erecting C.I. And MS ventilating columns
15 cms. Dia. With C.I. Ornamental cap and Min
6.00Mtr. Height (Height may be varying as per site)
base fixed firmly with necessary foundation with one
coat of red lead oxide paint and one coat of any
approved colour with 15 cms. dia. 10 Mt. in length with
0.25mt*0.35mt*M100 Encasing, stoneware or R.C.C.
pipe connection with M.H. including excavation and
jointing as required etc. complete, as per drawing. 10410.71 No
1.00 For 6 Mtr. Height (6 Mt. MS pipe) 33836.00 No.
0.00 For 12 Mtr. Height (2 m CI and 10m MS) 41230.00 No.
35 Providing and operation dewatering Pump
including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each
Pump Set, No payment should be allowed for non
working condition of machinery) (Based on
25.00 Previously approved rate by C E sir ) 535.71 Shift
36 Dewatering by pumping set of required capacity
including temporary platform carting pumping at site
and fixing the same in position including all
accessories, and fuel and labour etc. Complete Pump
set of Capacity (Item no. 1, Part-2 E, Misc., GWSSB
37 Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery,
and lighting and other requirements with
Arranging diesel to run the D.G. Set Do As
Directed. 8 Hrs Shift. (No payment should be
allowed for non working condition of machinery ) (
200.00 Based on Previously approved rate by C E sir ) 2500.00 Shift
38 Providing & Supplying JCB Machine on rental
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg.incharge, rate
includes all nece. shifting, fuel and operating charges
and stacking of useful & non-useful materials
separately up to store. (No payment should be
allowed for non working condition of machinery and
for pipe line excavation and laying work) (Based
200.00 on Previously approved rate by CE sir ) 535.71 Hour
39 Providing & Supplying Hitachi Machine -110
capacity on rental basis in case of emergency situation
and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and
operating charges . (No payment should be allowed for
non working condition of machinery ) (Based on
10.00 central work shop rate) 1785.71 hr
40 Providing & Supplying Hitachi Machine -200
capacity on rental basis in case of emergency situation
and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and
operating charges. (No payment should be allowed for
non working condition of machinery ) (Based on
50.00 central work shop rate) 2410.71 hr
41 Hiring of Hydra with Driver (8 working Hours in Day)
(Item no. 7, Part-2 E, Misc., GWSSB SOR 2022-23)
42 Supplying electric breaker machine for RCC slab or
asphalt demolishing work on site by using operator,
fuel, power supply etc.complete as directed. (no
payment should be allowed for non working condition
of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work) (Based on
5.00 Previously approved rate by CE sir ) 1071.42 Shift
43 Supplying Pneumatic Breaker Machine for RCC
Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break down
work) (Based on Previously approved rate by C E sir )
44 Hiring of tractor with trolley considering 8 Hrs. as
working day hours incl.Driver (Item no. 7, Part-2 E,
10.00 Misc., GWSSB SOR 2022-23) 2104.09 Day
45 Hiring of Three wheeler carrier (Chakado/Rixa)
considering 10 Hrs. as working day hours
incl.Driver (Item no. 7, Part-2 E, Misc., GWSSB SOR
46 Levelling or orientation of existing gully trap
chamber incl. Nece. masonry in CM 1:6 and plaster in
6.00 CM 1:3 etc. using old G.T.stone and cover etc. comp. 71.42 No.
47 Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the
prop M15 at bottom and 15 mm thick cement plaster
inside the catch pit in the proportion of CM (1:3) with
out jali etc. comp. as directed. (As per R.A. Based
10.00 on Building SOR 2015-16) 3125.00 No.
48 CatchPit Jali Fixing P/F FRC catch pit jali with frame
600mm x 600mm clear opening etc. comp. As directed
10.00 by engineer in charge. (Based on Central Store Rate) 1383.92 No.
49 Demolition incl. stacking of serviceable materials &
disposal of unserviceable materials with all lead and
2.00 (d) Tiles or Stone flooring (20.23,page 219) 26.79 Smt
50 Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas
as mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving
blocks shall be executed in line and level by skill mason
of flooring work only. It should be laid in such a way
that the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut
by machine only and carting. The finished surface of
the paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall be
relaid if necessary. Gravel or such type of materials
shall not be allowed for production. Laying on 5cms
10.00 thick sand beddding. 501.60 Smt
51 Providing and laying cement concrete 1:5:10 (1-
Cement : 5- fine sand : 10- graded brick bat aggregates
40mm nominal size) and curing complete.(R & B SOR
Item code 05009A, NBO 5.3.8 Page 74)
52 Labour work for fixing any kind of paving with
cement pointing in CM 1:2, including watering, ramming
etc comp. as dir.For pavement I) Laying on Sand
bedding as per requirement to fix the C.C.Block /
Nibhada Stone in Line & Level
53 Labour work for reinstament or asphalt pavment
covering excvation watering consoldation resoiling
meating with the activity of teackcoat including
carting the mix from the nearest store pacting
it with convayance charge of excavation earth
50.00 etc.comp as directed...(Road SOR 15-16) 44.64 Smt
54 Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base /
base course on well prepared surface and compacting
with vibratory roller to achieve the desired density as
per Codal Provision.(RA Approved St.Com.Res
5.00 Production & Supply of WMM 1708.13
5.00 Laying of WMM 31.25
55 Supplying of graded hand broken stone size of 90 mm
to 127 mm at site (Rubble or Spoul)(RA Approved
10.00 St.Com.Res No.189,Dt.19/05/2022) 983.93 cmt
56 Labour charges for spreading the spouls 127 mm thick
layer good earth filling in voids correcting the grade &
camber comp. with rolling, watering, incl. preparing the
surface by brushing for removing all loose or dirts
ect.comp. (RA Approved St.Com.Res
57 Supply of graded machine cut black trap stone
aggregate (metal) of Sevaliya / Timba or equivalent
quality metal of size 25 mm to 40 mm. (RA Approved
St.Com.Res No.189,Dt.19/05/2022)
58 Labour work for spreading the metal 85 mm thick in
single layer, incl. providing & applying bitumen for semi
grouting 2.5 kgs/sqm. & Providing & spreading the key
black trap aggregate of good quality on top at the rate
of 0.013 cmt. per sq.m. of size 18 mm passing in
mm retain rolling with 10 tonne roller etc. comp. as
directed.(RA Approved St.Com.Res
59 Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round
bars with round headed bolts and nuts or by screws (A)
50.00 Plain Grill. 66.78 KG
Providing and laying in position Ready Mixed
M-200 grade concrete for reinforced cement
conctere work, using cement content as per
approved Design Mix manufactured in fully
automatic batching plant and transported to site of
work intransit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement
concrete work including pumping of R.M.C. from
transit mixer to site of laying, excluding the cost of
centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve
work ability without impairing strength and
durability as per direction of theEngineer-in-charge.
Without Fly Ash (Min cement level as per latest IS456
60 10.00 shall be maintained) (Cement level 400 kg ) 4457.79 Cum
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
West Zone, Zonal Office", 2nd Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
Municipal Commissioner invites Percentage Rate sealed tenders from interested
MEMORANDUM OF WORKS IN BRIEF
1 Name of work Upgradation Drainage Line Ragarding C.C.R.S.
Complaine at GHB, Chali Area, Gamtal Area in Sardar
Patel Stadium ward, West Zone.
2 Time Limit 12 Months
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “E-1” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs
6 Earnest Money Deposit Rs.49,981/- (Demand Draft or pay order in favour of Municipal Commissioner,
Ahmedabad /) To be submitted as below. Demand Draft or Bank Guarantee shall be
from Nationalized Bank / Sheduled Bank and valid for 120 days. (As per Latest AMC
finance dept.circular).
7 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee/
Demand Draft / Local MICR Cheque. & attched ANNEXURE - 1 finance
dept.circular No- 14 Dt.4/6/13
8 Tender fees Rs.1500/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to Assistant
Manager (west zone),Ahmedabad Municipal Corporation, West Zone,
Zonal Office", Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad.
10 Tenders issue date Tenders from the AMC website www.amc.nprocure.com &
www.nprocure.com shall be down loaded from AS PER TENDER NOTICE
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.. The
Tenders. tenders received after latest schedule date and time will not be entertained
under any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum (only
Techanical Bid) to Assistant Manager / Dy.C.E.(W/Z) office, 2nd Floor,
Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013
13 Mode of sending the Document shall be physically submitted in sealed envelope By
Tender Documents and RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (One
evalution of tender Original & One Duplicate) duly sign & seal by contractor
Tenders received without EMD shall be considered as Non-Responsive and
shall be rejected outright.
14 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall
Specification be applicable..
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at his own expense
any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion, The within 15 days of receipt of
the notice. In the case of failure on the part of the contractor, the Engineer-in-
charge may rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the whole or
any part of the amount of security deposit towards the expenses, if any, Incurred
by him in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount put
tender), the period shall be 6 months from the certified date of completion or one
monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include one
(d) For building works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September may be
treated as the last date.
16 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or major
parts of work of part thereof of any amount, the contractor shall be bound to start the
works within 24 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Contractor shall be bound to
provide more than one gange as per the works allotted /shown to contractor
. In case of non- compliance of the same, shall be treated as delay by
contractor. Failure of comply to start the works in 24 hours of intimation as
above by contractor the contractor shall be levied penalty of (1) Rs.1000/-
per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for
tenders amounting above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per day
(for all tenders amounting above 30 Lakhs). Three times failures by
contractor shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of last notice
17 Compensation for Delay 10% of Remaining work (As per Circular)
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of Tender
And The Same As to be Attached Along With The Tender Document.
19 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
20 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject
any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
AMC Finance dept. circular No – 41, Dt.08/02/2022
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2022. The validity cut-off date in the GR is with respect to the date of issue of
Bank Guarantee irrespective of the date of termination of Bank Guarantee. Guarantees issued
or Authorized by Ahmedabad Branch Only.
(1) Commercial Banks:
(3) ICICI Bank.
(5) Kotak Mahindra Bank
(6) IndudInd bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the
Employer”) invites sealed Tender document from reputed and qualified bidders for the
construction of Works detailed in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No value of works Money Period
. (Rs.) Deposit
1 Upgradation Drainage Rs. 49,98,085.54 Rs.49,981/- 12 Months
Line Ragarding C.C.R.S.
Complaine at GHB, Chali
Area, Gamtal Area in
Sardar Patel Stadium
ward, West Zone.
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 900.00 in the form of
Demand Draft / Pay Order from any Nationalised Bank in favour of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for
the Works in the above Table payable at Ahmedabad and drawn in favour of
MUNICIPAL COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest
Money Deposit will have to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd
Floor,Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad
Municipal Corporation, 2nd Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura,
Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013. in the presence
of bidders or their representatives who choose to attend. In the event of the specified
date of bid submission/opening being declared a holiday for the Employer, the bids
shall be received /opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document,
tender fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two
separate envelope (marked as “original” and other marked as “Duplicate”) in schedule time
by RPAD/ Speed Post/ Hand Delivery in duplicate. The Bid envelopes shall be marked as
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be
initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids
received for the package (except those received late) containing the sealed Tender volume
and other enclosures then announce the names of bidders in the presence of bidders or
their representatives who choose to attend on the date and time mentioned in the NIT In
the event of specified date of bid opening being declared as a holiday for the Employer,
the Tender will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD,
the amount and validity of EMD furnished with each bid, is valid registration and such
other details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in
the Invitation for Bid and has not been furnished in the form, the bid shall be rejected by
the Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume
accompanied with valid EMD will be taken up for further evaluation. In case, the Bank
does not confirm the EMD, the bid shall be rejected as non-responsive and no further
evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been
properly signed, meets the eligibility and qualification criteria, has the required available
bid capacity, is accompanied by the requisite certificates, undertaking and other relevant
information specified in the bid documents and is substantially responsive to the
requirement of the bidding documents and provides any clarification for ascertaining the
correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer
and will not subsequently be made responsive by correction or modification or withdrawal
of the nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are
determined to be substantially responsive in accordance with Clause 2 and qualified for
award of Contract in accordance with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule
date and time. In the event of specified date of bid opening being declared bidders who
qualify the criteria then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest
Evaluated Bid Price, provided that such bidder has been determined to be (i) eligible in
accordance with the provisions of Clause 3(General Terms and Condition); and (ii)
qualified in accordance with the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer
will notify the successful bidder by cable/fax and confirmed by registered letter that his
bid has been accepted. This letter shall name the sum which the Employer will pay the
Contractor in consideration of the execution, completion and maintenance of the Works by
the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after
receiving letter of Indent. Time limit of work will commence from the date of issue of
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details
furnished by him in his bid. Such request by the Employer and the response by bidder shall
be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to
his bid from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids
and recommendations for the award of a contract shall not be disclosed to bidders or any
other persons not officially concerned with such process until the award to the successful
bidder has been announced. Any effort by a bidder to influence the Employer's processing
of bids or award decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and
obtain for itself on its own responsibility all information that may be necessary for
preparing the bid and entering into a contract for construction of the Works. The costs of
visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer
to enter its premises and lands for the purpose of such inspection, but only upon the
express condition that the bidder, its personnel and agents, will release and indemnify the
Employer and its personnel and agents from and against all liability in respect thereof and
will be responsible for death or personal injury, loss of or damage to property and any
other loss, damage, costs and expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to
as "the Works") detailed in the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet
the following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class
and or equivalent. If contractor is not registered with AMC in the relevant class, on
award of contract he shall be required to register himself with AMC within 3 month's
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer,
as the Employer shall reasonably request.Subject to Submition of Succsesful Submition as per
Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid
may be required to provide evidence of the origin of materials, equipment, and services to the
satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined,
grown, produced or manufactured; similarly for equipments and from where the services are
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall
be provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for
any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which
the reasons are attributable to the non-performance of the contractor, consistent history of
litigation awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures
and words) only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a
partner in a joint venture. A bidder who submits or participates in more than one bid for a
contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents.
Failures to comply with the requirements of bid documents will be at the bidder's own risk.
Pursuant to Clause 16, bids which are not substantially responsive to the requirements of the
bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the
bidder and the Employer shall be written in the English language. Supporting documents and
printed literature furnished by the bidder may be in another language provided they are
accompanied by an accurate translation of the relevant passages in the English language, in
which case, for purposes of interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole
works as described in bidding documents, based on the percentage rate amount in the Bill
of Quantities submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid
for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the
Employer may request the bidders to extend the period of validity for a specified
additional period. The request and the responses thereto shall be made in writing or by
fax. A bidder may refuse the request without forfeiting his bidder agreeing to the request
will not be required or permitted to modify his bid but will be required to extend the
validity of his Bid Security for the period of the extension, and in compliance with
Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or
persons duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder,
in which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time
and date specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been
accepted, the Employer will direct him to submit the Performance Security and attend the
Employer's office on a date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors
to do high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question. The Employer will declare the firm ineligible, either indefinitely
or for a stated period of time, to be awarded a contract by AHMEDABAD MUNICIPAL
CORPORATION if it at any time determines that the firm has engaged in corrupt or
fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those close
to them, or induce others to do so, by misusing the position in which they are placed,
and it includes the offering, giving, receiving, or soliciting of anything of value to
influence the action of any such official in the procurement process or in contract
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and
contract without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume.
If the Tender volume is submitted without valid documents and without proof of eligibility
criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety
Laws.(the existing laws as well as framed from time to time). Any penalties laid due to
violation of such laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users
of the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber
cones, traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.
Necessary florescent marking on traffic signs to be provided so that it should be visible at
night. During night working hours safety in charge personnel shall be provided with
florescent jackets. This shall be Provided at no extra cost by the bidder under attaché
with specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply
connection or new connection on behalf of AMC. It includes filling the necessary
application to power Supply Company, follow up and getting the supply, filling the
necessary test reports to the power supply company. All official fees including security
deposits and other expenses shall be of initially paid by the contractor. AMC may support
to get the temporary connection and may at its diseretien get the same converted to
permanent connection at the same of AMC if desired do,and contractor shall as no
extra cost support the same. In this case AMC my be as the remaining cost subject to
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the
contract upon any agreement for a commission, percentage, brokerage or contingent
fee. Breach of this warranty shall give the Municipal Commissioner the right to cancel
the contract or to take any other measure as the Municipal Commissioner may deem fit.
The warranty does not apply to commissions payable by the contractor to establish
commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of
this contract or to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out
of or under this Contract against the contractor the same may be deducted by the
Municipal Corporation from any sum then due or which at any time thereafter may
become due to the contractor under this contract and failing that under any other contract
with the Municipal Corporation or from any sum due to the contractor with the Municipal
Corporation (which may be available with Municipal Corporation), or from his retention
money, or he shall pay the claim on demand. The Municipal Corporation reserves the
right to carry out post payment audit and technical examination of the final bill including
all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over
payment when detected not withstanding the fact that the amount of the final bill may be
included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in
respect of any work done by the Contractor or alleged to have been done by him under
the contract, it shall be recovered by the Municipal Corporation from the contractor by
way of all the means prescribed above or if any under payment is discovered by the
Municipal Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at any time
thereafter become due before payment is made to the contractor from him to the
Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have
become liable and which is chargeable to the contractor, the owner shall have the right to
retain out of any payment then due or thereafter to become due an amount sufficient to
completely indemnify the owner against such lien or claim or if such lien or claim be
valid the owner may be or become due and payable to the contractor. If any lien or
claims remaining, unsettled after all payments are made, the contractor shall refund or
pay to the owner all money that the latter may be compelled to pay in discharging such
lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall
form the part of the contract documents. The full consideration shall be given to such
addendum or corrigendum before submission of tender duly filled in by the contractor.
Therefore, the contractors shall have to kindly refer the tender for such addendum or
corrigendum published by AMC through its website www.amc.nprocure.com &
www.nprocure.com 48 hours prior to the deadline of submission of the tender. Tenderers
shall verify the number of addendum issued and enclose the same with the tender documents
failing which the tenders shall be liable for rejection and no any complaint in respect to this
shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and
the Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned
as promptly as Early as possible as but not later than 28 days after the expiration of the period
of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed the
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the
successful bidder shall deliver to the Employer, a Initial Security Deposit Shall be
submitted as per C.E. Circular.in the form of a Bank Guarantee/ DD/Locle MICR
cheque for an amount equivalent to 5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the balance
period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank
guarantee as per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time
limit. & As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT
(exculding GST) etc. on material procurement or any other component for the works from
any source shall be borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender
amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be attached
with tender document. Tenderer who was not registred in AMC must be get registred in panel
of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English
version) Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s
M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved"
by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to
mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards shall
be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of any
such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works & all precautionary measures during execution
shall have to be kept in sufficient numbers and in good working condition at the site of the
work. All excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to
be adopted by the contractor shall be considered only if the contractor provided satisfactory
evidence that such special mode of construction and completion of work to the required
strength and quality. Acceptance of the same by the Engineer in charge shall not however,
absolve the contractor from the responsibility of any adverse effect and concordance of
adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from time
16. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the
work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to
be executed & as per the instruction of Engineer in charge & as per the guidance of AMC's
Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to
which work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution.Within 10 days contractor has to submit SD and after
reciveing SD Work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution .Within 15 days contractor has to submit SD and after
reciveing SD work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order /
demand draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor
shall have to sign contract paper with AMC. The contractor shall be fined 4% of interest per
year for delay in submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by
M.C. Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water
for the construction of the works and provide a satisfactory supply of potable water for
drinking, washing, sanitation and cleaning down. The contractor will be responsible for all the
costs where applicable of connection, meter installation, water consumed, water required for
testing purposes, disconnection and the laying, maintenances and ultimate removal of any
distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use of
diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby
total amount of work increases/ decreases.
total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the
scope of work. No any claim to that effect shall be entertained. The Municipal Commissioner
also reserves the right to reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other
special reason (like site is not available and due to unavoidable circumstances arise), after
evaluation of situation the actual date of starting of work will be consider after approval of
Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the
work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu.dJobuLxlt
btLg ftuLx[[tfxhu y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft<
ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu
s ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl
Ve,heLgwyj Ve <&t yvd{uzuNl Ve ylu btv œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath
ylu JvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb
fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu,
gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt xuLzhbtk sKtÔgt bwscle hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz xuLzhbtk sKtÔgt bwsc hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh<
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu
lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu
ytkkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg
dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg
rlgbtu ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt
rJd<tubtkk bwfuj Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu
y&Jt xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR
fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu fhe
NfNu lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R NfNu
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu ylwmth
mhCh fhJtbtkk ytJNu.
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg
htFJtbtkk ytJNu.
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk Cwj
sKtg <tu yufb œh btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu.
ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 15 btk
rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk
«J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10f: bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt 10%
juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF,
ÃjtLx, œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu
ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR
awfJKe ykkdult <ublt ftuR œtJt ægtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR
Ôgrf<yu(vAe<u ctkk^ftb rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt
hsw fhJt nfœth hnuNu lnekk. <ublw xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb
btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu
sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx +
yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt
cejbtkk&e fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ
2) xuLzh Vtubolwk CtJvºtf
z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
2) xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b
dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo
Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule
mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR
btKmlt òlbtj lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule sJtcœthe vK
ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu
<u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh
bsqhlu Ftztbtkk k W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV
ytlt btxu sJtcœth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk. Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t
sYh sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò
xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR
sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u
ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch
yufx/vtujemlt ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle
ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe
fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef
vxe,rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe
ftuLx[tfxhle hnuNu.
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt
rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt
sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl
Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe
hnuNu. Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu
sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
30 mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u
mbgdt¤tu ctœ fhe ftble mbgbgtoœt dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw. ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu muÕm xuût
lu jd<t vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
œM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (vrùb Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of
work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall
be as per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for
inspection by Municipal Staff. Watering of all the items shall be as per instructions otherwise
no payment shall be made to contractors. Mixing of concrete shall be done by concrete mixer
machine. Arrangements of binding vibrator for R.C.C. works if required shall have to be
made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident.
The contractor shall arrange for barricading at night and arrangement of Pagi at night to direct
the traffic. He shall be responsible for any damage to public. If any incident happen, during
the execution of work. In case of dispute for unseen or overlooked items the decision of the
Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish
during the work and at the time of completion of work and hand over the site with final
finishing of the work as directed. All the rejected materials shall be removed from site within
24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor
shall have to prepare through of bigger size and mix the mortar in the required proportion. In
on case he shall be allowed to mix the mortar either on floor or any finished surfaces. The
contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on
latest SOR or if item is not available in SOR than based on current market rates. In case of
extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of
the propose work the contractor shall carry out the same at his quoted rates without charges
any extra and the contractor will have to carry out the works and he will be paid at the rate
quoted by him. No claim for extra rate for subsequent changes in site and design is
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act.
and the Rules framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the
offer on his own during the period. If any tenderer withdraw or makes any modifications or
addition in the terms and conditions of his tender not acceptable to the Municipal Corporation
the Municipal Corporation shall without prejudice to any right or remedy be at liberty to
forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition
delay of start shall be recovered separately from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in
form of demand draft
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R&
B Dept. - Govt. of Gujarat booklets of Building Works & and Road Works
Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (West Zone)
TECHNICAL SPECIFICATIONS
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
TECHNICAL SPECIFICATIONS ITEMS REQUIRED DURING EXECUTION OF DRAINAGE LINE
Item No. Excavation for foundation up to 1.5 tm. depth in all type of hard and soft soil including
1 sorting out stacking of useful material & disposing of excavated stuff up to 50 tm. lead
loose or soft soil, girding, lighting, fencing the trenches', and pits. (depth measured from
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,
concrete and asphalt road paving work etc. Root of trees met with during excavation shall be
stacked at lead of 4’ away from the trenches as per instruction so that it may not damage the
sides of excavated trenches. The sides of trenches shall be vertical and bottom shall be
uniformly leveled. The excavated earth shall be stacked at any place or places shown within
mtr. as directed. After completion of the work the site shall be well dressed and cleared of all
rubbish so that it may give decent appearance. Contractor shall arrange for all materials required
for lining out and shall care to preserve the level pegs given. He shall have to arrange for
shorting at his own cost if the soil is found to be loose and sandy. He shall have to arrange for
sorting out brickbats or any serviceable materials found during excavation and shall have to
stock. Nothing extra shall be paid for this. He shall have to cart the excavated soil to site shown
within 50 mtr. If so ordered by officer in charge of this work. No old brickbats recovered from
excavation shall be allowed to be used by the contractor in the work. The depth of foundation will
be as per drawing. Contractor should arrange for safely measures so that there is no danger of
falling any men or animal in the excavated portion, otherwise he will be held responsible for the
compensation to be paid as the case may be. He should also arrange for red lamp at night times.
The contractor should not damage any of the municipal property, water lines, electric cables etc.
at the time of excavation. Water lines, electric cables etc. coming in the way will be shifted by
corporation but he should see that no damage is done for gross negligence on his part,
otherwise such damages will be recovered from him. Excavated stuff will be stacked at the site
shown or will be carted by the contractor immediately as per the other item of this tender.
Instructions of C.E. or his representative will be strictly followed. Measurement shall be given on
Excavation for foundation up to (a) Up to 0 to 2.0 Mt (b) from 2.0 to 3.0 mt depth (c) from 3.0 to
5.0 mt depth (d) above 5.0 mt depth including sorting out and stacking of useful materials and
disposal of the excavated stuff up to 50 mt. lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,
concrete and asphalt road paving work etc. Root of trees met with during excavation shall be
stacked at lead of 4’ away from the trenches as per instruction so that it may not damage the
sides of excavated trenches. The sides of trenches shall be vertical and bottom shall be
uniformly leveled. The excavated earth shall be stacked at any place or places shown within
mtr. as directed. After completion of the work the site shall be well dressed and cleared of all
rubbish so that it may give decent appearance. Contractor shall arrange for all materials required
for lining out and shall care to preserve the level pegs given. He shall have to arrange for
shorting at his own cost if the soil is found to be loose and sandy. He shall have to arrange for
sorting out brickbats or any serviceable materials found during excavation and shall have to
stock. Nothing extra shall be paid for this. He shall have to cart the excavated soil to site shown
within 50 mtr. If so ordered by officer in charge of this work. No old brickbats recovered from
excavation shall be allowed to be used by the contractor in the work. The depth of foundation will
be as per drawing. Contractor should arrange for safely measures so that there is no danger of
falling any men or animal in the excavated portion, otherwise he will be held responsible for the
compensation to be paid as the case may be. He should also arrange for red lamp at night times.
The contractor should not damage any of the municipal property, water lines, electric cables etc.
at the time of excavation. Water lines, electric cables etc. coming in the way will be shifted by
corporation but he should see that no damage is done for gross negligence on his part,
otherwise such damages will be recovered from him. Excavated stuff will be stacked at the site
shown or will be carted by the contractor immediately as per the other item of this tender.
Instructions of C.E. or his representative will be strictly followed.
Measurement shall be given on Cmt. basis.
Item No.2 (Excavation in bituminous road as per required gradient and line including safety
provisions using site rails and stacking excavated stuff including up to all required lead
cleaning the site etc. Complete for all lifts as specified (Item no. 2 - Part-1&2 -Labour Sec,
GWSSB SOR 2022-23)
Item No. Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal of
3 surplus stuff as directed within a radius of 3 km.
Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal of surplus stuff
as directed within a radius of 3 km.
--do-- with selected soil brought from outside including all lead
Mode of measurement:-
The rate shall be for a unit of Cmt basis
Item No. Conveyance charge of earth ,lime,murrum, building rubbish, manual garbage,sludge
4 ,excavated rock ,fly ash, aggregate of any kind etc. comp. Up to 5.0 Km. lead
All the surplus earth etc. shall be carried away immediately from the site of work to a place within
5 km. distance or as directed and ordered by the Engineer, so as not to cause any
inconvenience to the public traffic finding which in view of public safety and traffic convenience.
The Corporation shall carry out the work by any other agency at the contractor’s risk and cost. if
the instructions are not complied within 7 days from the date of order to cart the surplus
materials and clear the site, the said work shall be carried out by the Municipal Corporation at
the risk and cost of the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and
the same shall be carried out by the contractor without asking any extra rate. The contractor
shall have to cart the surplus earth after the trenches we will watered and refilled with the sand.
The rate of carting including carting of brick bats, metal, rubble vegetable and garbage, if
necessary to clear the road surface.
Mode of measurement:-
The rate shall be for a unit of Cmt basis
5-6 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling, transporting
pipes to work site, unloading lowering in trnch such as cementsand, hemp bitumen as
directed, incl. watering the trenches spreading and cartingaway of surplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement joints
in C.M.1:1 proportion in proper position , grade and alignment at all level as directed by
Engineer-in- charge including conveyance from stone to site of work, Jointing material
A)…………do…….(b)10 cm dia line
B)………do……….(c)15 cm dia line, 20cm line
C)……………do….(c)23 cm dia line
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality
make and shall be brought on site after approval. (The pipes shall be laid in grade as per
instruction.)Contractor shall have to procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarn
dipped in hot asphalt and caulking tools. The hydraulic pressure test shall be given to the
contractor for testing pipes and jointing. No trenches shall be filled without the approval of the
engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc.
shall be done as follows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the
plan and section. In all sorts of soil including old masonary, asphalt roads and wet excavation.
The sewer excavation shall be commenced at the down stream end of the sewer and be
continued up to the gradient as directed. The trench shall not open more than 60 mts. in advance
of the completed sewer only when directed by the engineer in charge looking to the progress of
the work in obtaining the formation of the bottom of the trenches the usual methods of using sign
rails and boning roads shall be adopted during the whole of the process. The centre line of
uniform height shall be carried clearly on each rail. The depth of the excavation and invert of the
sewer shall be checked by means of boning road of approved length and also by straight edge.
The bed of the trench shall be well rammed before starting laying of sewer lines and cement
concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable
timbering of shorting work looking to the nature of the soil near big or important structure, the
sides of the trenches shall be closely and securely timbered, if any settlement of the buildings in
anticipated the timbering shall be left in the ground. The various materials excavated shall be
separately stacked so that in refilling that may be relayed on the same order as before and least
possible damage shall be done carpet on the public roads and private properties. Surface
covering consisting of asphalt carpet shall be kept on side and preserved for reinstatement. The
excavated earth shall not be heaped near the trenches so as to caused unnecessary obstruction
along the trenches during inspection trenches etc. shall be tunneled under only as necessary.
The side of the trenches shall be nearly vertical and plumb and red light shall be placed at each
end at intervals and instructions and further protected by rope fence. Necessary caution boards
shall also be created and as directed by the engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not be
placed nearer than three meters from the outer edge of the excavated trenches. The utmost shall
have to be taken in refilling the trenches so that no damage may be done no sewer, no lump
shall be allowed to be put around the sewer. The ramming of the filling shall be done and well
The surplus earth shall be removed directed within 30 meters lead. The measurements
of the work shall be exact length and width of the trenches as specified or as per City Engineer
instruction and depth shall be measured vertical as per section up to invert or the pipeline. The
City Engineer reserves the right of extra excavation on either side if considers necessary for the
safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed
before any concrete is in dia. In case the excavation is done deeper than required no filling shall
be allowed to bring the formation to proper level but contractor shall have to lay cement or lime
concrete of filing or other acceptable materials as directed by the City Engineer at contractor own
cost so as to come to proper formation. In case bad formations are met with the work shall have
to be done as per instruction of City Engineer. Necessary arrangements for watering trenches
must be provided by contractor and without proper watering trenches will not be allowed to be
filed to further Contractor shall have to make arrangement for access to invert of the sewer and
for inspection of the work as ordered by the engineer. If it is required to shift or after the
alignment section of diameter of the pipe the contractor shall carry out the altered work at the
rates quoted by him for the original work for items and contractor shall not claim any expenses
due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the
recess time except in and other holiday the case of bad grounds such as running sand where the
work must be executed vigorous day night without interruption when so ordered by the engineer.
All existing water pipe storm drains sewer line railway track, electric cables etc. which do not in
the opinion of engineer required to be changed in location shall be supported and protected from
injury by the contractor. The contractor shall be liable to pay all damages to water-pipe, drains
electric and telephone cable and to private property during the execution of this contract and the
same will be recovered from the running bills or the deposit of work change location of any
existing sewers drains etc. not otherwise from in these specification the contractor shall do the
work of making such change and the work shall be paid for as extra work. All places utility etc.
shall be kept accessible for use.
No extra payment shall be made for land sides and side stops done without prior approval of the
engineer in charge.
The excavation of trenches shall be done foot wider on each side of the pipe than the
inside diameter of the sewer in case of depth excavation exceeding 3 meters above invert, one
feet wider excavated on either side for the upper depth above 3 meters shall be allowed and paid
for. Wherever natural soil demands winder excavation the mentioned above the same shall be
given after approval of City Engineer. The rate for excavation for easy jointing and caulking
nothing extra shall be paid for this. Refilling of trenches shall be done only after the grade of line
and hydraulic test practicable of the lines are checked and approved of and order given by the
Engineer in charge. The refilling shall be accompanied by through watering for layers of
mtrs. Further refilling shall be done thereafter and process should be repeated till trenches are
completely refilled. Temping and ramming with rammers shall have to be done at all place of
important work where ordered by Engineer in charge. After order to refill the trench is give the
trenches shall have to be refilled within 4 days with complete watering. If the contractor fails to
do watering satisfactory corporation shall get it done at the risk and cost of the contractor with or
without giving any notice and the expenses incurred in doing so recovered from the contractor
either in cost or from his payment through bills.
The rate shall be per meter basis.
The rate per Cmt. in this item shall be paid extra addition to the rate for excavation
Item No. Providing and supplying ISI Standard RCC pipes (of sulphate resisting Cement )in
7-8 standard lengths of following class and diameter suitable for rubber ring joints (socket
and spigot) including all taxes,insurance, transportation,treight charges,octroi,inspection
charges, loading,unloading, conveyance to departmental stores, stacking etc. complete
Class NP3 Test pressure 0.7 Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in proper
position , grade and alignment at all level as directed by Engineer-in- charge including
conveyance from stone to site of work, labour giving hydraulic testing as per ISI code.
(a) 300 mm internal diameter B) 450 Mm Internal Diameter (C)500 Mm Internal
Diameter, (D)600 Mm Internal Diameter
The RCC pipes shall be procured as per ISS for B Class type specifications using best materials,
first class workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tender
item. The proportion of concrete shall be one part of cement to 2 parts sand and 4 parts of black
trap agg. mix. of suitable size to as to produce uniform concrete through out thickness of the
Reinforcement in form of bars straight and class wise shall be provided as per IS458 class
specifications.
RCC spun pipe collars for the pipes shall be made in the same manner. The internal dia meter of
the collar shall be sufficiently large to allow a perfect joint around the outside of the pipes with
cement mortar and other plastic materials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially prepared
formation or on concrete bed and for the purpose to extra rate shall be given making extra
excavation for bed and in the sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the
length. For each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned and
moistured and the collar shall be kept in position by means of wedges. Semidry cement mortar of
prop. 1:1 shall be forced into joints and chaucked completely by means of special cutting tools
until the whole space is full. The mortar shall be sprayed around the collar joints so as to
completely encase the joint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and if
he has any doubt as to their soundness be may required the contractors to cut open and clear
away the cement of any joint that he may select and to make good the same at their expenses
provided that, unless some defect be found, they shall be required to open more than one joints
in 18mt (60’) of pipe, though if defect be found the Engineer direct them to open as many joints
as he may deem necessary, the joints made one day will not as a rule, be inspected until the
following day and the cement may has sufficient time to set well before being covered up.
Trenches shall not be filled until alignment and levels are examined by the Engineer or his
subordinates and the permission for refilling is granted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using best
materials first class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line of
The proportion of concrete shall be one part of cement to 2 parts of sand and 2parts of black trap
agg. Mix of suitable size so as to producing firm concrete thought thickness of the pipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/ class
specifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of the
collar shall be sufficiently large to allow a perfect joint around the outside of the pipes with
cement mortar and other plastic materials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on specially
prepared formation and for the purpose no extra rate shall be given for claming such hollows in
bends and in the sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the
length for each joint diped is not asphalt after the joint has been properly cleaned & moisture and
collar kept in position by means of wedges, semi-dry cement mortar prop. 1 ;1 shall be faced into
it and caulked completely by means of specials caulking tools until the whole space in full. The
mortar shall be sprayed off in the form of filler around the pipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly to
gradient. M/S shall be in RMT.
Trenches shall not be filled in until the line has been tested and alignment and levels are
examined by the Engineer or his subordinates and the permission for refilling is granted.
Contractor shall be held responsible for any damage or defect to the pipe line in satisfactory
working of the same for 12months after it is put into commission, contractor must satisfy IS
458/1971 and IS783/1959 with reference to RCC pipe.
Item No.9 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc..completed.
(A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20
(C) 0.75 x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this
shall comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the
brockbats is sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
kms. in thickness and be well and quickly rammend with heavy rammers, until mortar
creams up to surface. The surface must be kept damp during and after consolidation & in
laying consecutive layer the lower coars should be well watered & mode lough be for the
next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down
in P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got
approved by the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications
cement mortar for the brick work shall be one parts of cement to six part of sand every brick well
soaked in water is required to be ladi in joints of cement mortar the thickness of which shall not
exceed paints of 1.25 cm If after removal of centering any open joints are founed these shall be
pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be
toothed or shall be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to
plan working to the proper dimension & as directing by the officer in charge from the time to time
bricks should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore
laying cement mortar shall be prepared in special iron pans and mixed in quantites as required
using measurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the case may
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonary
should be constructed in proper workmanship like manner with joints plunb etc. to conform with
general specification No.45 P.W.D hand book. The face work should be neatly finished. The
work shall be keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of
cement 2 parts of sand 4 part of aggregates of black trap metalof other approved material of
sizes from 0.6 to 2.5 cm. well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposed
faces tobe finished with neat cement as per instruction the channel shall be half round and as
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of the
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of
sand in uniform thickness with surfaces truely in plumb. The work in general shall comply with
general specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at
least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement
Manhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together in
manhole as far as possoble. The maximum distance between inspection chambers shall be
about 25 meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall be
fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the
detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).
The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.
Above the horizontal diameter, the sides shall be extended vertically to the same level as the
crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch channels
shall also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall
be given. The channel at the bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers
over 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed
staggered in two vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung
shall be 450 mm below the manhole/ inspection chamber cover and the lowest not more than
300 mm above the benching. The manhole/inspection chamber frame and cover shall be of cast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers and
frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether
due to shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on
the top surface to provide an adequered nonslip grip. Cover shall be capable of easy opening
and closing and it shall be fitted in the frame in workmanship like manner. The cover shall be gas
tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection
chamber cover shall be firmly embeded to correct alignment and level in cement concrete on the
top of the masonry. The item shall be executed as per the detailed drawing and as directed by
Design and Details of Reinforcement for the slab shall be approved before casting work or
as directed by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
No.10 Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In
Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm
C/C At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness
C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm
dia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X
Meter (Inside Clear, M.H. length should be parallel to the flow)
1) 1.00 to 2.00 meter depth, (Slab at Ground level) (for pipe dia <=230 mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia <=300
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this
shall comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the
brockbats is sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
kms. in thickness and be well and quickly rammend with heavy rammers, until mortar
creams up to surface. The surface must be kept damp during and after consolidation & in
laying consecutive layer the lower coars should be well watered & mode lough be for the
next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down
in P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got
approved by the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications
cement mortar for the brick work shall be one parts of cement to six part of sand every brick well
soaked in water is required to be ladi in joints of cement mortar the thickness of which shall not
exceed paints of 1.25 cm If after removal of centering any open joints are founed these shall be
pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be
toothed or shall be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to
plan working to the proper dimension & as directing by the officer in charge from the time to time
bricks should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore
laying cement mortar shall be prepared in special iron pans and mixed in quantites as required
using measurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the case may
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonary
should be constructed in proper workmanship like manner with joints plunb etc. to conform with
general specification No.45 P.W.D hand book. The face work should be neatly finished. The
work shall be keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of
cement 2 parts of sand 4 part of aggregates of black trap metalof other approved material of
sizes from 0.6 to 2.5 cm. well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposed
faces tobe finished with neat cement as per instruction the channel shall be half round and as
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of the
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of
sand in uniform thickness with surfaces truely in plumb. The work in general shall comply with
general specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at
least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement
Manhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together in
manhole as far as possoble. The maximum distance between inspection chambers shall be
about 25 meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall be
fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the
detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).
The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.
Above the horizontal diameter, the sides shall be extended vertically to the same level as the
crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch channels
shall also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall
be given. The channel at the bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers
over 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed
staggered in two vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung
shall be 450 mm below the manhole/ inspection chamber cover and the lowest not more than
300 mm above the benching. The manhole/inspection chamber frame and cover shall be of cast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers and
frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether
due to shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on
the top surface to provide an adequered nonslip grip. Cover shall be capable of easy opening
and closing and it shall be fitted in the frame in workmanship like manner. The cover shall be gas
tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection
chamber cover shall be firmly embeded to correct alignment and level in cement concrete on the
top of the masonry. The item shall be executed as per the detailed drawing and as directed by
Design and Details of Reinforcement for the slab shall be approved before casting work or
as directed by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 0.75 mt
No.11 for constructing slab @ depth more than 0.60 mt below Ground Level (Max. 3 unit\ of DM
should be reduced in this item) (As Per R.A. Based on Building SOR 2015-16)
Item Constructing Slab type M.H. Chamber of the following size including excavation, refilling,
No.12 brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in CM 1:3,
finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at
cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including
Cantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding
the cost of Manhole seat cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H. length should be parallel to the flow, for pipe dia <= 800 mm)
1) 1.00 to 2.00 meter depth, (Slab at Ground level)
2) 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.)
3) 3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.)
4) 5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.)
5) 7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From G.L.)
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this
shall comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the
brockbats is sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
kms. in thickness and be well and quickly rammend with heavy rammers, until mortar
creams up to surface. The surface must be kept damp during and after consolidation & in
laying consecutive layer the lower coars should be well watered & mode lough be for the
next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down
in P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got
approved by the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications
cement mortar for the brick work shall be one parts of cement to six part of sand every brick well
soaked in water is required to be ladi in joints of cement mortar the thickness of which shall not
exceed paints of 1.25 cm If after removal of centering any open joints are founed these shall be
pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be
toothed or shall be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to
plan working to the proper dimension & as directing by the officer in charge from the time to time
bricks should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore
laying cement mortar shall be prepared in special iron pans and mixed in quantites as required
using measurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the case may
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonary
should be constructed in proper workmanship like manner with joints plunb etc. to conform with
general specification No.45 P.W.D hand book. The face work should be neatly finished. The
work shall be keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of
cement 2 parts of sand 4 part of aggregates of black trap metalof other approved material of
sizes from 0.6 to 2.5 cm. well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposed
faces tobe finished with neat cement as per instruction the channel shall be half round and as
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of the
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of
sand in uniform thickness with surfaces truely in plumb. The work in general shall comply with
general specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at
least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement
Manhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together in
manhole as far as possoble. The maximum distance between inspection chambers shall be
about 25 meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall be
fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the
detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).
The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.
Above the horizontal diameter, the sides shall be extended vertically to the same level as the
crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch channels
shall also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall
be given. The channel at the bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers
over 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed
staggered in two vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung
shall be 450 mm below the manhole/ inspection chamber cover and the lowest not more than
300 mm above the benching. The manhole/inspection chamber frame and cover shall be of cast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers and
frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether
due to shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on
the top surface to provide an adequered nonslip grip. Cover shall be capable of easy opening
and closing and it shall be fitted in the frame in workmanship like manner. The cover shall be gas
tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection
chamber cover shall be firmly embeded to correct alignment and level in cement concrete on the
top of the masonry. The item shall be executed as per the detailed drawing and as directed by
Design and Details of Reinforcement for the slab shall be approved before casting work or
as directed by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item Extra rate over item of Constructing Slab Type M.H. Chamber of following size for
No.13 constructing M.H. Chamber, per 1.00 Decimetre of additional depth or part thereof. etc.
complete. Of size 1.00 x 1.40 mt. (inside clear) and Depth from
Mode of measurement:
The rate shall be for a unit of DM basis.
Item Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 1.40 mt
No.14 for constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt for
(MH above 3.0 mt depth) below Ground Level (Max. 5 unit of DM should be reduced in this
Mode of measurement:
The rate shall be for a unit of DM basis.
Item Dismantling of existing Arch type manhole up to Arch and then Const. Slab type manhole
No.15 of following size incl. excavation, refilling and & finished 15 mm thick cement plaster
inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered
in masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3, including Cantering &
reinforcement as directed by engineer in charge. Rate includes carting of debris and
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single
jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below
3) 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement
(double jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
4) 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement
(double jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.)
5) 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement
(double jalli at 15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab at
below 1.00 mt. From G.L.)
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this
shall comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the
brockbats is sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
kms. in thickness and be well and quickly rammend with heavy rammers, until mortar
creams up to surface. The surface must be kept damp during and after consolidation & in
laying consecutive layer the lower coars should be well watered & mode lough be for the
next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down
in P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got
approved by the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications
cement mortar for the brick work shall be one parts of cement to six part of sand every brick well
soaked in water is required to be ladi in joints of cement mortar the thickness of which shall not
exceed paints of 1.25 cm If after removal of centering any open joints are founed these shall be
pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be
toothed or shall be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to
plan working to the proper dimension & as directing by the officer in charge from the time to time
bricks should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore
laying cement mortar shall be prepared in special iron pans and mixed in quantites as required
using measurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the case may
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonary
should be constructed in proper workmanship like manner with joints plunb etc. to conform with
general specification No.45 P.W.D hand book. The face work should be neatly finished. The
work shall be keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of
cement 2 parts of sand 4 part of aggregates of black trap metalof other approved material of
sizes from 0.6 to 2.5 cm. well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposed
faces tobe finished with neat cement as per instruction the channel shall be half round and as
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of the
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of
sand in uniform thickness with surfaces truely in plumb. The work in general shall comply with
general specifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at
least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement
Manhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together in
manhole as far as possoble. The maximum distance between inspection chambers shall be
about 25 meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall be
fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the
detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).
The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.
Above the horizontal diameter, the sides shall be extended vertically to the same level as the
crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch channels
shall also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall
be given. The channel at the bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers
over 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed
staggered in two vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung
shall be 450 mm below the manhole/ inspection chamber cover and the lowest not more than
300 mm above the benching. The manhole/inspection chamber frame and cover shall be of cast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers and
frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether
due to shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on
the top surface to provide an adequered nonslip grip. Cover shall be capable of easy opening
and closing and it shall be fitted in the frame in workmanship like manner. The cover shall be gas
tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection
chamber cover shall be firmly embeded to correct alignment and level in cement concrete on the
top of the masonry. The item shall be executed as per the detailed drawing and as directed by
Design and Details of Reinforcement for the slab shall be approved before casting work or
as directed by engineer in charge or Additional City Engineer (south zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item No. Provdg. & laying S.W. Gully trap with brick masonry chamber & water tight
16 G.T.Stone including fixing of cover Square mouth trap 100 mm x100 mm size P-Trap
Constructing Gully Trap Chamber With Masonry In Cement Mortar 1:5 & Plastering In
Cement Mortar 1:3 Using G.T. Stone Incl. Fixing Cover Etc. Completed As Directed.
Mode of measurement:
The rate shall be for a unit of Nos Basis
Item No. Making connection to the ex. M.H.in running sewer incl. Dewatering and other
17 required machinery etc. of following dia pipes at any convenient time. All damaged work
shall be well repaired as per instructions. etc..complete.
Rate includes connection in the sewer line at any convenient time when the load on the drainage
line in less. All damaged work shall be well repaired as per instruction of officer in charge.
Proposed R.C. C. line should be connected with the existing M.H. as directed. Holes made in
the well of existing M.H. should be finished smooth and in circular shape as directed. Rate also
includes making new channel or repairing existing damaged channel if instructed. Rate is
inclusive of watering etc. as directed.
Mode of measurement:
The rate shall be for a unit of Nos Basis
Item No. Cutting the pipes of following dia coming in the new M.H.in running sewer including
18 cutting bars, including removing debris /silt from the M.H. and carting at a suitable
distance etc..complete as directed. No payment for M.H. work will be made until pipe is
not cut completely in all respect.
Cutting the pipes of any dia comming in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is found
empty all damage work shall be well repair instruetions etc. comp.
The pipes of any dia and any material shall be cut as pes requirement to Cutting the pipe in existing manhole reinforcement
bars shall also have to be cut in existing manhole as per requirement and making good the
same. the dis mental materials shall be carried ti places at all lead as directed by engineer in
charge If directed the work shall have to be done at night the measurement shall be as per nos
Mode of measurement:
The rate shall be for a unit of Nos The rate shall be for a unit of Nos Basis
Item No. Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in C.M.
19-20 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and M.H. and carting the same as directed.
A)………………do………………. Up to 0.15 mt. ( @ Two coarse)
B) ………………do……..………… Up to 0.35 mt. ( @ Four coarse)
C)………………do…………………Up to 0.65 mt. ( @ Seven coarse)
D)………………do…………………Up to 0.90 mt. (@ Ten Coarse )
Repairing damaged I.C./ Raisin removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber and carting the same as
Required level shall be achieved in brick work as specified including plaster, the thickness of
joints shall not exceed 10 mm (3/9”). In no case the frame shall be supported by chips or broken
brick or asphalt mix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface of
an asphalt road/concrete pavement. The frame shall be bedded in cement mortar on the brick
work with splayed filler all around.
Water: Gully frames being on the edge of road shall be fixed to the correct road level at its
upper end and the slope should be such it must be about (12 mm) (1/2”) lower than water table.
A concrete pavement should be case around the frames and covers of man-holes,
chambers etc. in case of asphlatic road.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) as
specified and directed. The pavement shall be at least 8 mm (3”) wider than the outer most edge
of the circular frame no pavement will be made of this pavement under the item of cement
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) in
external measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the longer
dimension being along the direction of the main.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C.
No payment will be made for the pavement should be at least 8 cm (3”) wider than the outer
most edge of the frame.
After removing the top portion of the manholes, the proper brick masonry layer with c.m.
(1:4) should be constructed for proper bondage with old masonry and 8 cms thick PCC work
(1:2:4) should be laid on the top of brick layer an up to the bottom of the seat. After fixing the
seat the manhole should be properly leveled with road level.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall be
clean within 48 hours of concreting day.
M/S shall be given on No basis.
Item No. RCC Precast M.H.Frame & Cover Manufacture, supply & Delivery at store or at side of
21 work Precast RCC M200 Frame & Cover Suitable to drainage M.H. and as per type design
& Drawing including cost of reinforcement M.S. Angles or Flat , cutting mold work etc.
Frame Suitable for 50 Cm opening of MH
Cover Suitable for 50Cm Opening Of MH
Frame Suitable for 50 Cm opening of MH
Cover Suitable for 50Cm Opening Of MH
3) House connection Chamber Light Duty
Mode of measurement:-
The rate shall be for a unit of one number basis
Item No. Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
22 exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for
days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from any
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be supplied byA.M.C.(from any store)
Mode of measurement:-
The rate shall be for a unit of one number basis
Item No. Providing Kachha Of Pakka Dummy In The Following Dia Pipes And Removing The
23 Same After The Connection Of The Work As Directed.
Providing kachcha or pakka dummy in the following dia pipes and removing the same
after the connecting of the work as per instruction of engineer in charge. If kachcha or pakka
dummy is not removed by the contractor then the penalty shall be laid as per municipal rules or
derived by the municipal corporation officer's in-charge.
Measurements shall be given on no. basis.
Item No. Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing
24 EHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in line and
level to match exisisting road level in CC 1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as per instruction by engg. in charge.
Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing EHD-35
FRC MH cover, rate also incl. loading, unloading and fixing the frame in line and level to match
exisisting road level in CC 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
Measurements shall be given on Kg basis.
Item No. Raising of Existing manhole item includes,cutting of existing road surround by Manhole
25 by diamond cutter machine dismantling of road in confined area by breaker machine and
carting of dismantal material.item also included necessarey brick work to raise the
manhole at road level in CM 1:3 item also included fixing of Manhole frame at exact road
level by using MaserEmaco S 488 trowable fibre reinforced thixotropic repair mortal
material Laying of concrete made form Master Emaco 5 346 flowable micro concrete
material in desired thickness and laying of hot bitumanous material in Upper layer and
compaction of hot bitumanious material by palte compactor machine .Rate also included
necessary plaster at inside of manhole in CM 1:3 in 20 MM thickness on raised brickwork.
Raising of Existing manhole item includes,cutting of existing road surround by Manhole
by diamond cutter machine dismantling of road in confined area by breaker machine and carting
of dismantal material.item also included necessarey brick work to raise the manhole at road level
in CM 1:3 item also included fixing of Manhole frame at exact road level by using MaserEmaco S
488 trowable fibre reinforced thixotropic repair mortal material Laying of concrete made form
Master Emaco 5 346 flowable micro concrete material in desired thickness and laying of hot
bitumanous material in Upper layer and compaction of hot bitumanious material by palte
compactor machine .Rate also included necessary plaster at inside of manhole in CM 1:3 in
MM thickness on raised brickwork.
Measurements shall be given on no. basis.
Item No. Brick work using common burnt clay building bricks having crushing strength not less
26 than 35 kg/Sq. cm. in cement mortar 1:5 (1 cement : 5 fine sand)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6.
Brick shall conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean water
for about two hours before use or as directed. The cessation of bubbles, when the bricks are
wetted with water is an indication of through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used
except when necessary to complete to bond; closer in such case shall be cut to required size
and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick
shall first be properly bedded and set home by gently tapping with handle of trowel or wooden
mallet. It side face shall be flushed with mortar before the next brick is laid and pressed against
it. On copletion of course, the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical
joint shall be truly vertical. Vertical joints in alternate course shall generally be directly one over
the other. The thickness of brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges,
mason’s sprit level, square half meter rub, and pins, string and plumb shall be kept on the site of
work for frequent checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the
connected brick work shall be kept not more than one meter over the rest of the work. Where this
is not possible, the work shall be raked back according to bond (and not left toothed) at an angle
not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be
built in wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not
exceed 12 mm. The face joints shall be raked out as directed by taking tools daily during the
progress of work, when the mortar is still green so as to provide key for plaster or pointing to
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar
dropping removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the
faces for a period seven days. The top of masonry work shall be kept well wetted at the close of
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of
all loose materials, cleaned and wetted before starting masonry. If masonry is to be laid on
concrete footing, the top of concrete shall be cleaned and moistened. The contractor shall obtain
the engineer'’ approval for the foundation bed, before foundation masonry is started. When
puccas flooring is to be provided flush with the top to plinth, the inside plinth offset shall be kept
lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation
up to plinth. The limiting dimensions not exceeding those shown on the plans or as directed shall
be final. Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for
embedding in masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross
sectional area does not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not
exceed 10 Cms. and the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors,
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and
pipes etc. for concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of
jambs, throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Item No. Supplying, labour for break down repairing work for activities like excavation, disliting,
27 removing debris from trench back filling etc. comp. as directed by Eng.in charge.
1) Mazdoor at day /Night
2) Makadam/ supervision at day / Night
Mode of measurement:
The rate shall be for a unit of No Basis.
Item No. Providing Dead Cantering using good quality Country Wood Planks, wall Plate of required
28 thickness and size including placing the nece. supports of reqd. size, nailing, fixing with
mortar, levelling. All specification for dead centring as per standard engg. practice etc.
comp. as directed..
Providing Dead Cantering using good quality Country Wood Planks, wall Plate of
required thickness and size including placing the nece. supports of reqd. size, nailing, fixing with
mortar, levelling. All specification for dead centring as per standard engg. practice etc. comp. as
The rate shall be for a unit of Smt Basis
Item No. Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or
29 half brick walls for interior plastering upto floor two level and finished even and smooth in
(i) Cement mortar 1:3 (1- cement:3-sand) finishing with a floating coat of neat cement
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound.
These shall be properly examined before erection and use Stage scaffolding shall be provided
for ceiling plaster, which shall be independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence
and other foreign matter by water or by brushing. Smooth surface shall be roughened by wire
brushing if it is not hard and by racking if it is hard. In case of concrete surface, if a chemical
retarder has been applied to the form work, the surface shall be roughened by wire brushing and
all the resulting dust and loose particles cleaned off and care shall be taken that none of the
retarder is left on the surface. Trimming of projections on brick/concrete surface where
necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient
period before carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface
becomes dry such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried
downwards. For internal plaster, the plastering operations may be started wherever the building
frame and cladding work are ready and the temporary supporting ceiling resting on the wall of
the floor have been removed, Ceiling plaster shall be completed before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than
metre intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be
truly inplane of the finished plastered surface. The mortar shall then be applied in uniform
surface slightly more than the specified thickness, then brought to a true surface by working a
wooden straight edge reaching across the gauges with small upward and sideways movement at
a time. Finally, the surface shall be finished off true with a trowel or wooden float according as a
smooth or a sandy granular texture is required. Excessive trowelling or overworking the float
shall be avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as the
case may be and shall be carefully finished. Rounding or chamfering corners, arrises junctions
etc. shall be carried out with proper templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster
which is partially set shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both
horizontally and vertically. When recommending the plaster, the edges of the old work shall be
scraped clean and wetted with cement putty before plaster is applied to the adjacent area to
enable the two to properly joint together. Plastering work shall be closed at the end of the day on
the body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints in
plasterwork shall not also occur on parapet tops and copings as these invariably lead to leakage.
No portion of the surface shall be left out initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of
7 days. Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls
shall be avoided and only as much water as can be readily absorbed shall be used excessive
evaporation on the sunny or windward side of building in hot air or dry weather shall be
prevented by handling mattings or gunny bags on the outside of the plaster and keeping them
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the
operations described under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or
height shall be measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints
in brick work, stone work etc. or space between laths. Thickness of plaster shall be average
thickness with minimum 10 mm. at any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions
before plastering being taken) for length and from the top of floor or skirting to ceiling for height.
Depth of cover of cornices if any shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints,
beams, posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings
exceeding 0.5 sq.mt. and not exceeding 3.0 sq. mt. in each area deductions and additions shall
be made in the following manner :
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding
sq. mt. each and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening
for finish to plaster around ends of joints, beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one
When two faces of wall are plastered with different types of plasters or if one faces is plastered
and the other pointed, deductions shall be made from the plaster or pointing on the side of frame
for door, window etc. on which width or reveals is less than that on the other side but no
deductions shall be made on the other side. Where width of reveals on both faces of all are
equal, deductions of 50% of area of opening on each face shall be made from area of plaster
and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction
for opening shall be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but
jambs, soffits and sills shall be measured.
The rate shall be for a unit of one sq. metre.
finishing with a floating coat of net cement slurry.
Materials & Workmanship :
This work is only of providing smooth cement finish with floating coat of neat cement slurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be applied
to the plastered surface with a trowel to provide uniform texture while the base coast is still
In any continuous face of wall the finishing treatment should be carried out continuously and day
to day braked made to coincide with architectural breaks in order to avoid unsightly junctions.
Curing : All the plaster work shall be kept damp continuously for a period of 7 days.
Mode of measurements & payment :
The payment shall be made for a unit of 1.0 sq. mt. of work done over and above the finishing of
work of base coat.
The relevant specifications of item of base coat shall be followed for measurements and
The rate shall be for a unit of one sq. metre.
Item No. Supplying cutting, bending, binding and placing in position steel as per plan and design
30 and as per IS 2502 including cost of steel and binding wire for reservoirs/ structuresonly
including lift up to 6 meter height or depth below GL for all diameters TMT bars Fe-415
grade for alldiameters
The scope of work consists of providing and laying mild steel reinforcement and TMT
CRS Fe-500 reinforcement for RCC works of various components of the structure. This may be
Tisco or any other approved manufacturer branch and corrosion resistant steel bars approved by
the Engineer Incharge. This includes cuttings, bending, binding, placing, with all equipments and
labour required for the work as directed by the City Engineer, Ahmedabad and all operations
covered within the intent and purpose of the specification.
Being of Reinforcement
Reinforcing steel shall conform accurately to the dimensions shown on relevant
drawings and conforming to the relevant IS codes (latest revision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the City
Engineer, AMC, Ahmedabad using a proper bar bender, operated by hand or power to attain
proper radii of bends.
Bars shall not be bent or straightened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work;
they shall not be heated to facilitate bending.
The bending of the TMT bars shall be carried out as per the following:
S.No Operation Size TMT CRS-Fe-500
1 Bend Upto 22 mm dia 3d
Over 22 mm dia 4d
2 Rebend Upto 10mm dia 4d
Over 10 mm dia 5d
Placing of Reinforcement:
All reinforcing bars shall be accurately placed in the exact position shown on the
drawings, and shall be securely held in position during placing of concrete by annealed binding
wire not less than 1 mm in size and conforming to IS:280 and by using stays blocks or metal
chairs, spacer, metal hangers, supporting wires or other approved devices at sufficiently close
intervals. Bars will not be allowed to sag between supports nor displaced during concreting or
any other operation over the work. All devices used for positioning shall be of non-corrodible
material. Wooden and metal supports will not extend to the surface of concrete, except where
shown on the drawings, placing bars on layers of freshly laid concrete as the work progresses for
adjusting bar spacing will not be allowed. Pieces of broken stone, brick or wooden blocks shall
not be used. Layers of bars shall be separated by spacer bars, precast mortar blocks or other
approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition
until completely embedded in concrete. Special care shall be exercised to prevent any
displacement of reinforcement in concrete already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated
on the drawings. All bars protruding from concrete to which other bars are to be spliced and
which are likely to be exposed for an indefinite period shall be protected by a thick coat of neat
In the case of columns and walls, vertical bars shall be kept in normal position with
timber templates having slots accurately cut in for bar position. Such templates shall be removed
after the concreting has progressed upto a level just below them.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of
size not less than 1 mm and conforming to IS;280 in such a manner that they do not slip over
each other at the time of fixing and concreting. As far as possible, bars of full length shall be
used. In case this is not possible, overlapping of bars shall be done as directed by the City
Engineer, AMC, Ahmedabad. When practicable, overlapping bars shall not touch each other, but
be kept apart by 25 mm or 1 ¼ times the maximum size of the coarse aggregates whichever is
greater, by concrete between them. Where this is not feasible, overlapping bars shall be bound
with annealed steel wire, not less than [1 mm thickness twisted tight in eight shape around the
lapped bars. The overlaps shall be staggered for different bars and located at fixed locations only
along the span where neither shear nor being moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of
reinforcement bars shall be butt welded so as to transit their full strength. Welded joints shall
preferably be located at points where steel will not be subject to more than 75 percent of the
maximum permissible stresses and welds so staggered that at any one section, not more than
33 per cent of the rods are welded. No –pre-warning or post heat treatment is necessary.
Interpass temperature should be limited to 200º C with low heat input and equivalent strength low
hydrogen type electrode. Suitable means shall be provided for holding the bars securely in
position during welding. It must be ensured that no voids are left in welding and when welding is
done in 2 or 3 stages, previous surface shall be cleaned property. Ends of the bars shall be
cleaned of all loose scale, rust, grease, paint and other foreign matter before welding. Only
competent welders shall be employed on the work.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the
actual site and their number and frequency of tests shall be as directed by the City Engineer,
AMC, Ahmedabad.
The TMT bars shall be tested for any or all of the following tests as directed by the
Engineer Incharge
Alternate immersion test
Salt spray test
Atmospheric exposure test
Sulphur dioxide test
Potentio dynamic test.
Item No. Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
31 aggregates 20 mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.
Stone aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4
proportion measured by volume shall conform to relevant specification or ordinary grade
1:2:4 concrete.
2.0 Workmanship :
2.1 The cement concrete flooring of 50 mm. thick (average) is to be laid as per the site
condition. The concrete shall be mixed in a mechanical mixer at the work. Hand mixer
may however be allowed for smaller quantities of work and in case of failure of machines
or as permitted by the engineer-in-charge. It shall carried out on a water tight platform
and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. However in such cases 10% more cement than otherwise
required shall have to be used without any cost. The mechanical mixing shall be done
for a period of /2 to 2 minutes. The quantity of water shall be thus sufficient of produce a
dense concrete required workability for the purpose. Flooring of specified thickness shall
be laid in accordance with approved pattern or as directed. Finishing operation shall start
shortly after the cessation of beating and shall be spread over a period of one to six
hours depending upon the temperature and atmospheric conditions. The surface shall
be left for some time till moisture disappears from it. Fresh quantity of cement shall be
mixed with water to form a thick slurry and spread over the surface while the concrete is
still green. Use of dry cement or cement and sand mixture sprinkled on this surface to
stiffen the concrete or absorb excessive moisture shall not be permitted. The cement
slurry shall than be properly paste twice by means of iron flats, once, when the slurry is
applied and the second time when cement starts setting and finished smooth. The
surface shall be marked with string or B.R.C. fabric jali to make the surface non slippery
as and when directed. The junction of floors with wall plaster dado or skirting shall be
rounded where so required upto 25 mm. radius. Flooring in lavatories and bath rooms
shall be laid after fixing of water closet and squatting pans and floor traps, which shall be
plugged while laying the floors and opened after the floors, are completed. Any damage,
done to water supply sanitary fittings during the execution of work shall be mage good.
2.2 After the final set, the concrete shall be kept continuously wet, if required ponding for a
period of not less than 7 days from the date of placement.
2.3 The form work shall be provided if necessary as directed by the engineer in charge.
Concreting shall be done as per alternate bay method with necessary centering wither
by mastic or cement mortar as directed.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all material and labour involved in all the operations
described above. No deduction shall be made or extra paid for any opening upto 0.1 sq.
metre in area in the floor, nothing extra shall be paid for laying the floor at different levels
in the same room or the court yard.
The rate shall be for unit of one Cmt
Item No. Providing and installation of barricading with retro-reflective paint/ film/ tapes (Minimum
32 3.0Mt. height) as specified in the drawing & specifications for the construction of road
work, along with necessary diversion arrangement for existing traffic movement in an
unobstructed condition, all relevant markings, sign boards and illumination as per
relevant MORT&H specification. Precoated galvanised iron profile sheets shall be of
approved make and shade having 0.50 mm (+0.05 %) total coated thickness with zinc
coating 120 grams per sqm as per IS: 277, in 550 mpa steel grade, 5-7 microns epoxy
primer on both side of the sheet and polyester top coat 15-18 microns. Rate to be
inclusive of all materials, fabrication works, paint works for information (retro reflective
paint), foundation works, transportation, loading, unloading, installation, dismantling and
inclusive of all taxes and including the same design for providing openable gates. No
extra rental will be given to the contractor in case of any delays from his part for
construction or due to any valid time limit extensions. Each barricading sheet is to be
numbered with a unique number. The barricading provided shall be retained in position at
site continuously i/c shifting of barricading from one location to another location as many
times as required during the execution of the entire work till its completion. Rate include
its maintenance for damages, painting, all incidentals, labour materials, equipments and
works required to execute the job. The barricading shall not be removed without prior
approval of Engineerin- Charge. (Note :- One time payment shall be made for providing
barricading from start of work till completion of work i/c shifting. The barricading
provided shall remain to be the property of the contractor on completion of the work).
Blinkers are to be installed on the barricading and rate for blinkers will be payable as per
relevant item. Barricading is to be cleaned by means of
Mode of measurements & payment :
The rate shall be for a unit of Rmt
Item No. Barricading the entire break down or excavated area on rental basis using wooden ballies
33 / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out
side to avoid accident & for smooth traffic diversion & movement including cautionary
board etc. Item also includes for making temporary sufficient nos of lighting arrangement
through out the work with necessary required arrangement. ..The same shall be removed
after completion of work.
Mode of measurements & payment :
The rate shall be for a unit of Rmt
Item No. Providing and operation dewatering Pump including fuel charges & operator Charges etc.
34 as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set)
Mode of measurements & payment :
The rate shall be for a unit of Shift
Item No. Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost of
35 to and fro transportation, laying of the delivery hoses as required, lowering and lifting
the pumps as and when required etc. complete. Set Do As Directed. (No payment
should be allowed for non working condition of machinery )
Mode of measurements & payment :
The rate shall be for a unit of HP/Hr.
Item No. Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting
36 machinery, and lighting and other requirements with Arranging diesel to run the D.G.
Set Do As Directed. 8 Hrs Shift. (No payment should be allowed for non working
condition of machinery )
Mode of measurements & payment :
The rate shall be for a unit of Shift
Item No. Providing & Supplying JCB Machine on rental basis in case of emergency situation and
37 break down type work & also during unavoidable condition as per instruction
of engg.incharge , rate includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to store. (No payment should
be allowed for non working condition of machinery and for pipe line excavation and
The item is for supplying JCB on rent for various construction activities The rate includes various
operational cost such as operating generater/electricity diesel,petrol, operater's salary, etc
when machine is in working condition all precautions shall be taken by contractor to avoid the
accident.if any accident occurs contractor shall be fully resonsible for that. the payment shall be
given on hour basis.No payment shall be given for idle hour and no time shall be counted for
carrying machine to site and from shifting site to site.
the payment shall be given on hour basis.
Item No. Providing & Supplying Hitachi Machine -110 capacity on rental basis in case of
38 emergency situation and break down type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating
The item is for supplying Machine rent for various construction activities The rate includes
various operational cost such as operating generater/electricity diesel,petrol, operater's salary,
etc comp. when machine is in working condition all precautions shall be taken by contractor to
avoid the accident.if any accident occurs contractor shall be fully resonsible for that. the payment
shall be given on hour basis.No payment shall be given for idle hour and no time shall be
counted for carrying machine to site and from shifting site to site.
the payment shall be given on hour basis.
Item No. Providing & Supplying Hitachi Machine -200 capacity on rental basis in case of
39 emergency situation and break down type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating
The item is for supplying Machine rent for various construction activities The rate includes
various operational cost such as operating generater/electricity diesel,petrol, operater's salary,
etc comp. when machine is in working condition all precautions shall be taken by contractor to
avoid the accident.if any accident occurs contractor shall be fully resonsible for that. the payment
shall be given on hour basis.No payment shall be given for idle hour and no time shall be
counted for carrying machine to site and from shifting site to site.
the payment shall be given on hour basis.
Item No. Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case of
40 emergency situation and break down type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case
of emergency situation and break down type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting, fuel and operating charges .
the payment shall be given on Per 8 hr Shift basis.
Item No. Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
41 using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work)
Mode of measurements & payment :
The rate shall be for a unit of Shift
Item No. upplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site
42 by using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work)
Mode of measurements & payment :
The rate shall be for a unit of Hour
Item No. Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver
43 Mode of measurements & payment :
The rate shall be for a unit of Shift
Item No. Hiring of Three wheeler carrier (Chakado/Rixa) considering 10 Hrs. as working day hours
Mode of measurements & payment :
The rate shall be for a unit of Shift
Item No. Levelling or orientation of existing gully trap chamber incl. Nece. masonry in CM 1:6 and
45 plaster in CM 1:3 etc. using old G.T.stone and cover etc. comp.
Mode of measurements & payment :
The rate shall be for a unit of Nos
Item No. Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including
46 excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with
40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster
inside the catch pit in the proportion of CM (1:3) with out jali etc. comp. as directed.
Catchpit shall be provided at every change of alignment, gradient or diameter of
storm water drains, Bends and junctions in the sewer/drain shall be grouped together in chamber
as far as possoble. The maximum distance between inspection chambers shall be about
meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall be fixed at the
same level and necessary slope given to the channel of manhole/inspection chamber. The
minimum internal sizes of manhole/inspection chamber shall be as per the respective item of
work. The manhole/inspection chamber shall be constructed as per the detailed drawings and as
directed by Engineer. The bed concrete and the brick masonry shall be constructed of such
thickness as shown on drawing. The brick masonry shall be constructed in C.M. (1:5), plastered
on both faces with 15 mm cement plaster in C.M. (1:3). The channel shall be semicircular in the
bottom half and of diameter equal to the sewer/drain. Above the horizontal diameter, the sides
shall be extended vertically to the same level as the crown of the outgoing pipe and the top edge
shall be suitable rounded off. The branch channels shall also be similarly constructed with
respect to the benching out at their junction with the main channel as appropriate fall suitable
rounded off in the direction of flow in the main channel shall be given. The channel at the bottom
of manhole/inspection chamber shall be plastered with C.M. (1:3) and finished smooth. Rungs
shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall be of cast
iron conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm
apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below the
manhole/inspection chamber cover and the lowest not more than 300 mm above the benching.
The manhole/inspection chamber framing and cover shall be of cast iron of specified weight and
shall conform to the requirements given in IS:1726. The covers and frames shall be cleanly cast
and they shall be free from air and sand holes and from clod shuts. They shall be neatly dressed
and carefully trimmed. All castings shall be free from voids whether due to shrinkage, gas
inclusion or other causes.Covers shall have a raised chequered design on the top surface to
provide an adequered nonslip grip. Cover shall be capable of easy opening and closing and it
shall be fitted in the frame in workmanship like manner. The cover shall be gas tight and water
tight. The size of covers specified shall be considered as the clear internal dimensions of the
frame. Covers and frames shall be coated with a black bituminous composition. The coating
shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item
shall be executed as per the detailed drawing and as directed by Engineer
Mode of measurements & payment :
The rate shall be for a unit of Nos
Item No. CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc.
47 comp.. As directed by engineer in charge.
Mode of measurements & payment :
The rate shall be for a unit of Nos
Item No. Demolition incl. stacking of serviceable materials & disposal of unserviceable materials
48 with all lead and lift.
(c) Tiles or Stone flooring (20.23,page 219)
Demolishing work shall be carried out as per instructions given by the Engineer in charge.
Demolishing of stone slab pavement or any other type of paving, proportion of cement or lime,
sorting out materials, carting them up to lead of 50 mts. & Stacking the different materials
separately as directed by the Engineer in charge of work. The work shall be done carefully.
Item No. Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35
49 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath, parking areas, service lanes and other
areas as mentioned in the drawing / instruction of engineer in charge. Cost includes
formworks using rubber mould, Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be mechanically compacted. The work of
paving blocks shall be executed in line and level by skill mason of flooring work only. It
should be laid in such a way that the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut by machine only and carting. The
finished surface of the paver block shall have resonably good, plain finished. Paver
blocks shall be compacted and shall be relaid if necessary. Gravel or such type of
materials shall not be allowed for production. Laying on 5 cms thick sand bedding(As per
Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high
level of compaction by application of hydraulic compaction and also by high intensity vibration to
the moulds. The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of
cum/hour. The plant should equipped with automatic control panel for maintaining water cement
ratio from batch to batch to obtain concrete of uniform quality and strength. The plant should be
equipped with adequate mechanism for mechanized loading of raw materials into mixer and
conveyor belt for transportation of concrete from mixer to concrete block making machine to
maintain quality of wet cement.
1.3. Curing:- The factory should have well designed curing area to ensure adequate curing
of paver blocks.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1).Systematic record of test results of various paver blocks manufactured in the factory.
(2).Concrete Mix Design for various grade of concrete used for making of paver
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using
approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with
minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED” as
selected by HPCL before commencement of the work. White cement shall be used for colored
pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of
months from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers
will be as per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same
should be retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand
filling after vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and
automatic batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired
shape of the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X
250mm X 380mm. The kerbing should be embedded for 100mm depth. The concrete used for
kerbing shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no
Hollow Or Creacks)
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use
of any pigment.
For coloured pavers refer
“specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
380 Kg/Cum (Not
5. Minimum Cement Contact
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete
Floor Tiles) – Appendix C.
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete
Floor Tiles) – Appendix D.
Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for
Concrete Masonry Units) – Appendix E.
Item No. Provdg. & laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 hand broken
50 stone aggregates 40 mm nominal size) and curing complete excluding cost of form work
in. (Bldg.Sor 2015-16,item no.5.3.4,page no-49)
(A) Foundation and plinth
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose
materials and watered and rammed as directed .
The proportion of cement, sand and coarse aggregate shall be one part of cement, 3 parts of
sand, 6 parts of stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may
however be allowed for smaller quantity of work if approved by the Engineer-incharge. When
hand mixing is permitted by the Engineer-in-charge incase of breakdown of machinery’s and in
the interest of the work. it shall be carried out on a water tight platform and care shall be taken to
ensure that mixing is continued until the mass is uniform in colour and consistency. However in
such cases 10% more cement than otherwise required shall have to be used without any extra
cost. The mixing in mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of
water shall be sufficient to produce a dense concrete of required workability for the purpose.
The concrete shall be handled from the place of mixing to the final position in not more than
minutes by the method as directed and shall be placed into its final position, compacted and
finished within 30 minutes of mixing with water i.e. before the setting commences.
The concrete shall be laid in layers of 15 cms. to 20 cms.
The concrete shall be rammed with heavy iron rammers and rapidly to get the required
compaction and to allow all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a
period of not less than 7 days from the date of placement
The concrete shall be measured for its length breadth and depth, limiting dimensions to those
specified on plan or as directed.
The rate shall be for a unit of one cubic meter.
Item No. Labour work for fixing any kind of paving with cement pointing in CM 1:2, including
51 watering, ramming etc comp. as dir.For pavement I) Laying on Sand bedding as per
requirement to fix the C.C.Block / Nibhada Stone in Line & Level
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm th sand
bedding, levelling, watering and fixing in line & level as well cleaning the site etc.comp. as
A) Laying on sand bedding as per requirement fo fix the CC block/nibhada Stone in line level
The measurement shall be for a unit of one sq. metre. basis.
Item No. Labour work for reinstament or asphalt pavment covering excvation watering
52 consoldation resoiling meating with the activity of teackcoat including carting the mix
from the nearest store pacting it with convayance charge of excavation earth etc.comp as
Labour work for reinstament or asphalt pavment covering excvation watering consoldation
resoiling meating with the activity of teackcoat including carting the mix from the nearest store
pacting it with convayance charge of excavation earth etc.comp as directed.
Mode of measurements & payment :
The rate shall be for a unit of Smt
Item No. Providing, laying, spreading and compacting gradedstone aggregate to wet mix macadam
53 specificationincluding premixing the Material with water at OMCin mechanical mix plant
carriage ofmixed Materialby tipper to site, laying inuniform layers in subbase/ base
course on wellprepared surface andcompacting withvibratory roller to achieve thedesired
density as per MoRTH clause
The provision of MORTH Clause 406 shall apply during construction of Wet Mix Macadam.
The rate shall be for a unit of one Cmt
Item No. Supply of graded machine cut black trap stone aggregate (metal) of Sevaliya / Tima or
54 equivalent quality metal of size 25 mm to 40 mm.
The Aggregates shall consist of Black trap machine crushed stone only, obtained from
quarries situated in Sevaliya /Timba or equivalent. It shall remain visibly black on immersion in
water. They shall be clean, strong, durable of fairly cubical shape and free from disintegrated
pieces, organic or other deleterious matters and adherent coating. They shall be free from
elongated and flaky piece also. The size of the aggregate shall be below.
As shown in the Table -500-7
I.S. Sieve Per cent by weight passing the
Coarse Aggregate
Specific gravity: minimum.
Water Absorption: Maximum 2 %
Impact Value: Maximum 30%
Los angles abrasion Value: Maximum 40%
Crushing Strength: Maximum 30%
Flakiness &Elongation Combined: Maximum 30%
For stacking relevant Specification of Item No.A-3 shall be apply.
The rate shall be paid on cubic metre basis.
Item No. Labour work for spreading the metal 85 mm thick in single layer, incl. providing &
55 applying bitumen for semi grouting 2.5 kgs/sqm. & Providing & spreading the key black
trap aggregate of good quality on top at the rate of 0.013 cmt. per sq.m. of size 18 mm
passing in 9.5 mm retain rolling with 10 tonne roller etc. comp. as directed
The metal shall be screened of any rubbish, dust or grass. Then metal shall be laid
uniformly in two layers of 50 mm each, to the required grade and camber as directed by the
Engineer in charge. Laying of metal shall be started after the consolidating soling layers
prepared perfectly to the proper line level and camber. Where camber of soling is found
doubtful it shall be corrected prior to spreading metal. Metal filled in the basket shall be spread
evenly in required number of layers as directed. Metal shall be spread in proper grade and
camber if required using camber boards, so as to ensure the corrected surface. The surface
shall be checked at every 15 mts. by means of template and string for correctness of the
camber. The consolidation of metal shall be done by the contractor with a minimum 8 to 10 T
roller. The contractor shall provide required number of labors at the time of rolling to rectify the
undulation that might have occurred during rolling. To carryout grouting of the above said
mm thick metalling coat the contractor shall bring all the required equipment and materials as
directed. Bitumen of VG10 grade penetration of approved quality heated to a temperature of
about 150 C. and shall be applied hot by means of a sprayer uniformly over the surface at the
rate of 1.5 kg./sq. mt. up to the satisfaction of Engineer in charge. Immediately following the
application of bitumen and while it is still hot second layer of metal shall be spread in proper
thickness and again application of bitumen at the rate of 1.5 kg./sq. mt. as above for second
layer shall be done. Key aggregate of as specified in below table and of approved quality shall
be evenly spread out at rate of 0.013 cum. per sq. mt. After spreading the chipping the whole
area shall be rolled over thoroughly with a 8 T to 10 T. roller It is important that the rolling
should be done while the bitumen is still soft and it should be continued until the road sets and
there is no settlement under the roller.
During the period between the initial compaction of coarse aggregate
and compaction of the surface course shall be protected form all traffic other than essential to
its construction, till the final compaction level is attained. All above operation shall be carried by
the contractor using his equipments and material including fuel or wood required for burning
etc. and as directed up to the entire satisfaction of Engineer in charge.
As shown in the TABLE-500-7
I.S. Sieve Per cent by weight passing the
The mode of payment for this item shall be on sq. mt. basis.
Item No. Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S.
56 flats at required spacings and frame alround, square or round bars with round headed bolts and
nuts or by screws (A) Plain Grill.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide
lines. If child labour is employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw
enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then action will be taken
for contempt of Supreme Court Judgement and also will be prosecuted by concerned authority. Because of the
breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount
from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso.
No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing
charge is taken and the remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No.
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has
to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be
entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by
A.M.C. The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along
with the tender duly signed. These shall form a part of tender. The tenderer shall not add or amend the text of any
of the documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the
contract documents. The full consideration shall be given to such addendum or corrigendum or correction before
submission tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum
or corrigendum or correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify
the number of addendum issued and enclose the same with the tender documents,failing which the tender shall be
liable for rejection and no any complaint in respect to this shall be entertained under any circumstances.
Clause : 6 "The contractor shall adhere to the maintenance schedule outlined in the tender documents and comply
with the prevailing AMC circulars issued from time to time."
SCHEDULE OF MAINTENANCE
Maintenance schedules for municipal drainage systems vary depending on the city and the
type of infrastructure (stormwater vs. sewage).The maintenance shall be of these two basis.:
preventive maintenance (scheduled) and reactive maintenance (complaint-based).
The contractor shall execute maintenance and upgradation works as directed by the client and
through self-inspection under the instructions of the Engineer-in-Charge.
Surveying of lines and manholes for the specified works shall be undertaken as and when
required on the designated roads, as instructed by the Engineer-in-Charge.
The inspection schedule shall be aligned with the following categories of complaints, with
priorities determined by the Engineer-in-Charge:
* CCRS complaints
* Complaints from MLAs/Councilors
* Complaints from officials
The specific lines and machinholes shall be surveyed as per below schedule as specified.
1. Ward Office: Visit Ward s office every week take the road detail on which the
schedule inspection to be done and carry the survey of machineholes ,lines as specified
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 80.pdf
Download all tender documents and submit your bid