Loading…
Loading…
Tender Value
₹23.0 L
EMD Value
₹23,000
Closing Date
15 Jul 2026, 6:00 pm
The Chief Officer, Thangadh Nagarpalika
Bid Documents for Estimate For Storm Water For Various area of Thangadh Nagarpalika Area at Thangadh. (Second Attempt)
321753
2026-27/03 Storm Water 2nd attempt
Open
Civil - All
Surendranagar
3 documents required · 3 mandatory
₹900
The Chief Officer, Thangadh Nagarpalika
₹23,000
7 Jul 2026
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
Name Of Work :-
Area at Thangadh. (Second Attempt)
SUMMARY (SCHEDULE-B)
Sr. No Name of work Total Cost
Estimate For Storm Water For Various area of Ward No. 01 to 07 at
Schedule - B2 Estimate For Storm Water Drain For Various area at Thangadh.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________% (should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
1. All the work shall be carried out as per MOST specification and specification on the division or as directed.
2. Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
3. In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment
shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory
4. The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work
and amount involved at site without any payment as directed by the Engineer in charge.
5. Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by
the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As
per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6. The contractor shall quote even "NIL" if no reduction is proposed.
7. One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments
and conditions of service Act-1996)
8. Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9. The contractor is solely responsible to bare all applicable taxes. IT. etc. and department will not entertain any contractor representation to
reimburse any financial burden due to applicable taxes : i.e. I.t etc.
Signature of contractor Chief Officer
Thangadh Municipality
THANGADH MUNICIPALITY
Estimate For Storm Water For Various area of Ward No. 01 to 07 at Thangadh.
SCHEDULE - "B1"
Quantities Estimated Rates
Item Descrption Unit according to
in Figure in Words estimated quantities.
Demolition and disposal of unserviceable
Rupees Five Hundred
materials with all lead and lift.(i) Cement
1 56.00 593.35 NinetyThree Paise ThirtyFive Cum
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
Rupees One Hundred Seventeen
2 0.00 materials and disposing off the excavated stuff 117.08 Cu.m
Paise Eight Only
upto 50 Meter lead.(A) Loose or soft soil
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
Rupees One Hundred FourtyNine
3 56.00 materials and disposing off the excavated stuff 149.67 Cu.m
Paise SixtySeven Only
upto 50 Meter lead.(B) Dense or Hard soil
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful Rupees Two Hundred FiftySix
materials and disposing off the excavated stuff Paise Twelve Only
upto 50 Meter lead.(C) Hard Murrum
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
Rupees Two Hundred SixtyThree
5 28.00 materials and disposing off the excavated stuff 263.08 Cu.m
Paise Eight Only
upto 50 Meter lead.(D) Soft rock not requiring
Providing and laying cement concrete 1:4:8 (1-
Cement : 4- coarse sand : 8- hand broken stone Rupees Two Thousand Six
6 26.00 aggregates 40 mm nominal size) and curing 2630.68 Hundred Thirty Paise SixtyEight Cu.m
complete excluding cost of formwork in (A) Only
Foundation and Plinth
Providing and laying controlled cement concrete
M.200 and curing complete Including the cost of
Rupees Five Thousand
7 83.00 formwork and Excluding reinforcement for 5095.45 Cu.m
NinetyFive Paise FourtyFive Only
reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete
Providing and laying controlled cement concrete
M.200 and curing complete including the cost of
Rupees Six Thousand One
formwork and excluding reinforcement for
8 17.00 6113.53 Hundred Thirteen Paise Cu.m
reinforced concrete work in © Slabs, landing,
FiftyThree Only
shelves, Balconies Lintels, Beams, Girders and
Cantilever upto floor two level.
Providing and laying controlled cement concrete
M.200 and curing complete including the cost Rupees Seven Thousand Five
9 0.00 of formwork and excluding cost of reinforcement 7538.64 Hundred ThirtyEight Paise Cu.m
for reinforced concrete work in (B) Walls, from SixtyFour Only
top of foundation level upto floor two level
Providing and laying controlled cement concrete
M.200 and curing complete including the cost of
Rupees Six Thousand One
formwork and excluding reinforcement for
10 51.00 6119.59 Hundred Nineteen Paise Cu.m
reinforced concrete work in © Slabs, landing,
shelves, Balconies Lintels, Beams, Girders and
Cantilever upto floor two level.
Providing TMT Bar FE 500D reinforcement for
Rupees SeventySix Paise
11 1020.00 R.C.C. work including bending, binding and 76.21 KG
placing in position complete upto floor two level
RCC precast M.H. Frame & Cover, RCC precast
M.H. Frame & Cover Manufacture, supply &
Delivery at store or at site of work precast RCC
M.200 Frame & cover suitable to drainage M.H. Rupees One Thousand One
and as per type design & Drawing including cost Hundred TwentyOne Only
of reinforcement M.S. Angles or Flat, curing
mold work etc , Heavy duty Frame suitable for
50cm opening of MH
RCC precast M.H. Frame & Cover, RCC precast
M.H. Frame & Cover Manufacture, supply &
Delivery at store or at site of work precast RCC
M.200 Frame & cover suitable to drainage M.H. Rupees One Thousand One
and as per type design & Drawing including cost Hundred SeventyThree Only
of reinforcement M.S. Angles or Flat, curing
mold work etc , Heavy duty Cover suitable for
50cm opening of MH
Filling available excavated earth (excluding
rock) in trenches. plinth, sides of
foundations etc. in layers not exceeding 20 cm. Rupees One Hundred Thirty
in depth consolidating each disposited Paise ThirtyNine Only
layer by ramming and watering.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the cost
of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Thangadh Municipality
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference
in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in
GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid
5) by the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the
works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
7) Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. GST etc. and department will not entertain any contractor representation to
reimburse any financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor Chief Officer
Thangadh Municipality
THANGADH MUNICIPALITY
Estimate For Storm Water Drain For Various area at Thangadh.
SCHEDULE - "B2"
Quantities Estimated Rates Total Amount
Quantities Estimated Rates Total Amount
Item Estimated according to
Item Descrption Unit
No. but may be estimated
in Figure in Words
more or less quantities.
Demolition and disposal of unserviceable materials with
Rupees Five Hundred
1 387.00 all lead and lift.(i) Cement concrete. 593.35 Cum
NinetyThree Paise ThirtyFive Only
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and Rupees One Hundred FourtyNine
disposing off the excavated stuff upto 50 Meter lead.(B) Paise SixtySeven Only
Dense or Hard soil
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and Rupees Two Hundred FiftySix
disposing off the excavated stuff upto 50 Meter lead.(C) Paise Twelve Only
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and Rupees Two Hundred SixtyThree
disposing off the excavated stuff upto 50 Meter lead.(D) Paise Eight Only
Soft rock not requiring Blasting
Providing and laying cement concrete 1:4:8 (1- Cement
: 4- coarse sand : 8- hand broken stone aggregates
Rupees Two Thousand Six
mm nominal size) and curing complete excluding cost
5 178.00 2630.68 Hundred Thirty Paise SixtyEight Cu.m
of formwork in (A) Foundation and Plinth
Providing and laying controlled cement concrete M.200
and curing complete Including the cost of formwork and
Rupees Five Thousand
6 9.00 Excluding reinforcement for reinforced concrete work in 5095.45 Cu.m
NinetyFive Paise FourtyFive Only
(A) Foundations, footings, Base of columns and Mass
Providing and laying controlled cement concrete M.200
and curing complete including the cost of formwork and
Rupees Six Thousand One
excluding reinforcement for reinforced concrete work in
7 26.00 6113.53 Hundred Thirteen Paise Cu.m
© Slabs, landing, shelves, Balconies Lintels, Beams,
FiftyThree Only
Girders and Cantilever upto floor two level.
Providing TMT Bar FE 500D reinforcement for R.C.C.
Rupees SeventySix Paise
8 1560.00 work including bending, binding and placing in position 76.21 Cu.m
complete upto floor two level
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the cost of
material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Thangadh Municipality
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions,
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) The contractor is solely responsible to bare all applicable taxes. GST etc. and department will not entertain any contractor representation to
Signature of contractor Chief Officer
Thangadh Municipality
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Mile Stone Dates Storm Water R01.pdf
02. SBD Book Storm Water R01.pdf
03. Schedule - B Storm Water Combine.pdf
04. Qualification criteria Storm Water.pdf
05. Material_Testing_Schedule.pdf
06. SPECIFICATIONS BUILDING WORK.pdf
07. Affidevit Format.pdf
08. Declarations city.pdf
09. GR All.pdf
10. DMO_2941_01-Apr-2026_744.pdf
Download all tender documents and submit your bid