Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹17.4 L (10.7%)Admitted-Finance 91 ENGINEERS ENCLAVE 1ST FLOOR PITAMPURA DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹1.8 Cr+₹17.4 L (10.7%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹80.0 L (49.2%)Admitted-Finance D NO 1 179 9 563 KDC KRUSHI DEFENCE COLONY R C PURAM PATANCHERU MEDAK 502319 | PATANCHERU | MEDAK | TELANGANA | 502319 | ₹2.4 Cr+₹80.0 L (49.2%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 Cr+₹80.5 L (49.5%)Admitted-Finance | ₹2.4 Cr+₹80.5 L (49.5%) | L4 | Admitted-Finance |
| 5 | No RankAdmitted-Finance | - | No Rank | Admitted-Finance |
| Sl No | Description | Qty | Unit | Kranth Enterprises No Rank | P LAVAKUSHA REDDY CONTRACTORS L1 | SATYANARAYANA RAJU VEGESNA L3 | SRI SAI ENTERPRISES L2 | SATYA SAI PROJECTS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | DEMOLITION OF BRICK WORK : Demolition of brick work or stone /boulder masonry built in cement mortal including all quoins, arches, pillars, etc. complete all as specified and directed by EIC | 5 | Cum | 1,200 - | 550 ₹2,750 Lowest | 879 ₹4,395 | 2,000 ₹10,000 | 890 ₹4,450 |
| 2.00 | DEMOLITION OF RCC : Demolition of reinforced cement concrete in ground floors and
pavings n exc 15 cm thickness (below or above ground level) . Complete all as specified and directed by EIC | 3 | Cum | 2,000 - | 1,800 ₹5,400 Lowest | 2,427 ₹7,281 | 2,000 ₹6,000 | 2,400 ₹7,200 |
| 3.00 | Surface excavation in hard/dense soil n.exc (not exceeding ) 30 cm deep and averaging 15CM deep and getting out inclulding all as specified and directed by EIC. | 1,200 | Sqm | 95 - | 150 ₹1,80,000 | 138 ₹1,65,600 Lowest | 150 ₹1,80,000 | 140 ₹1,68,000 |
| 4.00 | EXCAVATION : Excavation over areas in hard/dense soil not exceeding 1.5 m depth and getting out, spreading/levelled, complete all as specified and directed. | 200 | Cum | 455 - | 200 ₹40,000 Lowest | 670 ₹1,34,000 | 300 ₹60,000 | 675 ₹1,35,000 |
| 5.00 | EXCAVATION : Excavation over areas in hard rock not exceeding 1.5 m depth and getting out, spreading/levelled, complete all as specified and directed. | 30 | Cum | 1,682 - | 1,800 ₹54,000 | 2,502 ₹75,060 | 550 ₹16,500 Lowest | 2,500 ₹75,000 |
| 6.00 | EXCAVATION: Excavation in trenches in hard rock not exceeding 1.5m width and 1.5m depth and getting out and carting the same to the location as shown by EIC/SIC | 30 | Cum | 2,500 - | 2,200 ₹66,000 | 3,700 ₹1,11,000 | 600 ₹18,000 Lowest | 3,700 ₹1,11,000 |
| 7.00 | EXCAVATION: Excavation in trenches in in hard/dense soil not exceeding 1.5m width and 1.5m depth and getting out and carting the same to the location as shown by EIC/SIC | 250 | Cum | 670 - | 200 ₹50,000 Lowest | 1,004 ₹2,51,000 | 350 ₹87,500 | 1,000 ₹2,50,000 |
| 8.00 | FELLING OF TREE: Felling of tree exc.30 cm and not exc.100 cm girth including cutting of trunk and branches and stacking of serviceable material and disposal of unserviceable material to a distance n exc. 50m and clearing site. | 10 | Each | 1,000 - | 1,200 ₹12,000 | 1,858 ₹18,580 | 1,000 ₹10,000 Lowest | 1,800 ₹18,000 |
| 9.00 | GRUBBING UP TREE TRUNK : Grubbing up tree trunk of girth exceeding 100 mm and not exceeding 150 mm, including cutting of trunk portion protruding over ground, digging out roots, filling holes and levelling off ground, stacking of serviceable materials and removing of unserviceable materials to a distance n. exc. 50 m and clearing site. | 10 | Each | 2,500 - | 2,500 ₹25,000 | 4,401 ₹44,010 | 1,000 ₹10,000 Lowest | 4,400 ₹44,000 |
| 10.00 | REMOVING OF EXCAVATED MATERIAL Removal of excavated material to a distance exceeding 500M but not exceding 1.0 KM and deposting where directed, complete all specified and directed. | 300 | Cum | 670 - | 330 ₹99,000 | 511 ₹1,53,300 | 200 ₹60,000 Lowest | 500 ₹1,50,000 |
Tender Value
₹1.8 Cr
EMD Value
₹2.6 L
Closing Date
10 Jun 2026, 3:00 pmClosed
THE CHIEF GENERAL MANAGER
AVNL,Ordnance factory Medak,Yeddumailaram-502205
Construction of Toilet blocks for Industrial employees in H and T, LMS, Foundry, SMS and TR buildings inside factory area at OFMK.
2026_AVNL_277095_1
73025/OFMK/EO/TE-02/2026-27
Open Tender
Civil Works
Item Rate
365 days
AVNL, ORDNANCE FACTORY MEDAK
As per tender terms and conditions
2 documents required · 2 mandatory
₹0
₹2.6 L
29 Aug 2026
11 May 2026
11 Jun 2026
11 May 2026
10 Jun 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DEMOLITION OF BRICK WORK : Demolition of brick work or stone /boulder masonry built in cement mortal including all quoins, arches, pillars, etc. complete all as specified and directed by EIC | 5 | Cum | - | - |
| 2 | DEMOLITION OF RCC : Demolition of reinforced cement concrete in ground floors and
pavings n exc 15 cm thickness (below or above ground level) . Complete all as specified and directed by EIC | 3 | Cum | - | - |
| 3 | Surface excavation in hard/dense soil n.exc (not exceeding ) 30 cm deep and averaging 15CM deep and getting out inclulding all as specified and directed by EIC. | 1,200 | Sqm | - | - |
| 4 | EXCAVATION : Excavation over areas in hard/dense soil not exceeding 1.5 m depth and getting out, spreading/levelled, complete all as specified and directed. | 200 | Cum | - | - |
| 5 | EXCAVATION : Excavation over areas in hard rock not exceeding 1.5 m depth and getting out, spreading/levelled, complete all as specified and directed. | 30 | Cum | - | - |
| 6 | EXCAVATION: Excavation in trenches in hard rock not exceeding 1.5m width and 1.5m depth and getting out and carting the same to the location as shown by EIC/SIC | 30 | Cum | - | - |
| 7 | EXCAVATION: Excavation in trenches in in hard/dense soil not exceeding 1.5m width and 1.5m depth and getting out and carting the same to the location as shown by EIC/SIC | 250 | Cum | - | - |
| 8 | FELLING OF TREE: Felling of tree exc.30 cm and not exc.100 cm girth including cutting of trunk and branches and stacking of serviceable material and disposal of unserviceable material to a distance n exc. 50m and clearing site. | 10 | Each | - | - |
| 9 | GRUBBING UP TREE TRUNK : Grubbing up tree trunk of girth exceeding 100 mm and not exceeding 150 mm, including cutting of trunk portion protruding over ground, digging out roots, filling holes and levelling off ground, stacking of serviceable materials and removing of unserviceable materials to a distance n. exc. 50 m and clearing site. | 10 | Each | - | - |
| 10 | REMOVING OF EXCAVATED MATERIAL Removal of excavated material to a distance exceeding 500M but not exceding 1.0 KM and deposting where directed, complete all specified and directed. | 300 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_323635.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .