Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.1 L+₹2,206.50 (0.44%)Admitted-Fee/PreQual/Technical/Finance | ₹5.1 L+₹2,206.50 (0.44%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.2 L+₹16,170 (3.19%)Admitted-Fee/PreQual/Technical/Finance | ₹5.2 L+₹16,170 (3.19%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | AJITHKUMAR.C L1 | M CHANDRAN L2 | SANDYA.M L3 |
|---|---|---|---|---|---|---|
| 1.00ROAD RE TARRING | ||||||
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | 62.77 | sqm | 375 ₹23,538.75 Lowest | 386.59 ₹24,266.25 | 375 ₹23,538.75 Lowest |
| 1.00 | 3.8.3:Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5 | 210 | cum | 80 ₹16,800 | 77.44 ₹16,262.4 Lowest | 80 ₹16,800 |
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 90 | sqm | 12 ₹1,080 Lowest | 15.06 ₹1,355.4 | 12 ₹1,080 Lowest |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 30 | cum | 2,200 ₹66,000 Lowest | 2,338.05 ₹70,141.5 | 2,200 ₹66,000 Lowest |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 45 | cum | 3,500 ₹1,57,500 Lowest | 3,531.94 ₹1,58,937.3 | 3,500 ₹1,57,500 Lowest |
| 1.01 | 5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 300 | sqm | 85 ₹25,500 | 76.72 ₹23,016 Lowest | 85 ₹25,500 |
| 1.01 | 5.2.3a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 300 | sqm | 15 ₹4,500 Lowest | 16.58 ₹4,974 | 15 ₹4,500 Lowest |
| 1.01 | 5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 435 | sqm | 16 ₹6,960 | 13.86 ₹6,029.1 Lowest | 16 ₹6,960 |
| 1.01 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65) | 735 | sqm | 278 ₹2,04,330 | 276.78 ₹2,03,433.3 Lowest | 300 ₹2,20,500 |
Tender Value
₹5.1 L
EMD Value
₹12,710
Closing Date
10 Sept 2026, 11:00 amClosed
Assistant Engineer, LIDEW, Kanhangad Municipality
Assistant Engineer, LIDEW, Kanhangad Municipality
Annual Plan KMC PRO NO.140/25-26 Karinjamundi Road Retaring
2026_LSGD_866770_3
02/2026/TN/AE/LIDEW/KMC
Open Tender
Civil Works - Roads
Item Rate
180 days
KANHANGAD
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,125
Yes
₹12,710
Yes
11 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROAD RE TARRING | |||||
| 1.001 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | - | sqm | - | - |
| 1.002 | 3.8.3:Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5 | - | cum | - | - |
| 1.003 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | sqm | - | - |
| 1.004 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | - | cum | - | - |
| 1.005 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | - | cum | - | - |
| 1.006 | 5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | - | sqm | - | - |
| 1.007 | 5.2.3a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.008 | 5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.009 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65) | - | sqm | - | - |
stage.html
html • 0.02 MB
finance_1467322.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1467322.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.76 MB
NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .