Loading…
Loading…
Tender Value
₹4.9 Cr
EMD Value
₹4.9 L
Closing Date
24 Aug 2026, 6:00 pm
Executive Engineer, P.H.Works Division, JalBhavan, 1st Floor, Dahod-389151
Remaining/Incomplete Work Of Faliya Connectivity of DDSA Package-5 (Part-2) Kanjeta Pipero RWSS including Operation & Maintenance For 24 Months For Existing Work & This Tender Scope Work
324789
09/2026-27
Open
Civil - All
Works
Dahod
3 documents required · 3 mandatory
₹6,000
Executive Engineer, P.H. Works Division, GWSSB,Dahod
₹4.9 L
22 Jul 2026
22 Jul 2026
22 Jul 2026
24 Aug 2026
22 Jul 2026
Estimated Cost: - Rs.4,87,29,712.81
Gujarat Water Supply & Sewerage Board
Zone –I,Vadodara
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
Bid Documents for Design, Build & Operate Contract for
Remaining/Incomplete Work Of Faliya Connectivity of DDSA Package-5
(Part-2) KanjetaPipero RWSS including Operation & Maintenance For
Months For Existing Work & This Tender Scope Work
Taluka: DevgadhBaria, DhanpurDIST.: Dahod
Volume-III, PRICE BID DDSA PKG-5 KanjetaPiperoFaliya Connectivity
Name of Work:-Remaining/Incomplete Work Of Carrying out level Survey, Soil
Investigation, Detailed Survey Work, Designing etc for Lowering, Laying and Jointing PVC
/G.I. Rising /Gravity Pipeline from Village Level U/G Sump to Faliya, Designing and
Constructing of RCC ESR / UGS/ Cistern at Faliya Level, Pumping Machinery & Supply,
Installation, Testing & Commissioning of Pumping Machineries at Existing U/G Sump etc.
under Remaining/Incomplete Work Of Faliya Connectivity of DDSA Package-5 (Part-2)
KanjetaPipero RWSS including Operation & Maintenance For 24 Months For Existing Work &
This Tender Scope WorkTaluka: DevgadhBaria, Dhanpur DIST.: Dahod, Gujarat.
(1) The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
(2) The rates and prices shall be submitted in the electronic formats given by n-procure
which is called Schedule-B. Rates and prices received in any other formats will be
rejected and the Bids will be disqualified.
(3) It will be entirely at the discretion of the Employer to accept or reject the bidder‟s
proposal, without giving any reasons whatsoever and the bidder shall not be
permitted to withdraw his bid on this account.
supplied from the by client.
(5) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as
called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and
(8) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder
shall give year wise break up of cost for 2 years O&M in Schedule-C/1 to Schedule-
C/5 separately for Schedule-C. The total shall be in line to the price quoted in
Schedule-C. The total shall be carried forward to Schedule-B for comparison and
(9) Wherever for a particular item the quantities have been specified payment shall be
on unit rate basis and unit variation in quantity will be paid with pro rata basis.
(10) Each item is to be individually priced online and the amounts shall be added up to
shall be left blank except where the item description requires the item to be priced
on "as applicable” basis. The item shall not be priced if it is “not applicable” to the
bidder‟s design, in which case the bidder shall add the words “NOT APPLICABLE”.
The wording in the item description is for subject matter guidance only; clause
references are indicative only and all other relevant clauses shall also be referred
to. The prices shall allow for all the works covered under the bid and all liabilities
and contractual obligations whether separately specified or not. Items against which
no prices are quoted shall not be separately paid for and the bidder shall be deemed
to have covered the cost of execution of such items (according to the requirements
of the bid document) in the prices quoted for other items.
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
satisfactory working/safety of the system as specified, will not be separately paid
for by the Employer when executed and shall be deemed to be already covered by
other items and rates listed in the price sheets No extra payment shall be given for
any item which is required to complete and perform the project.
the pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor.
corrections if any will be considered for financial evaluation of the bid.
(13) Schedule „D gives the basis of interim payment for construction of works.
(14) The bidder shall be deemed to have allowed in his price for provision, maintenance
and final removal of all temporary works of whatsoever nature required for
construction including temporary bunds, diverting water, pumping, de-watering etc.
for the proper execution of works. The rates shall also be deemed to include any
works and setting out that may be required to be carried out for laying out of all the
works involved.
(15) Prices shall be filled online only.
the Specifications and other sections of these bid documents and these documents
are to be taken as mutually explanatory of one another.
(17) The bidder shall interpret the data furnished and carry out any additional survey
work, or investigation work required at his own cost.
(18) The prices quoted shall also include the cost of materials utilized for testing.
(19) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at
his own cost. These accesses will be used by the other contractors working for
prices shall include all the equipments / materials / accessories and services
(21) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(22) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(23) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(24) Any expenditure incurred by inspection/ CSC agency for the work misinformed by
the contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(25) The prices shall be quoted inclusive of all taxes, royalties and duties prevailing at
the time of submission of the bids. Statutory variation if any during the currency of
contract shall have to borne by the agency which shall be not reimbursed by the
(26) The rates quoted shall be exclusive of GST but inclusive of all taxes, duties which
shall not be paid extra. While GST will be paid for admissible part for actual work
done at the approved tender rates & tender condition of price variation. GST shall
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
be paid as per prevailing rates at the time of payment. The TDS shall be deducted
at source as per provision of IT rules and GWSSB policy.
(27) The rates should be quoted exclusive of GST but inclusive of all other taxes as per
Volume-I (B), General Conditions of Contract, Clause No.
(28) The Bidders shall have to quote the rates in this tender keeping in view of the GST.
The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(29) The process requires that the bidder shall quote his price for the work components
and fix during the entire period of performance of the contract except price
variation allowed for supply of PVC/GI pipe as per Volume-IBClause No. 59, General
Conditions of Contract.
(30) Payment shall be made for the components for which lump sump prices are quoted,
as per the schedule of payment. Total cost will be worked out on the basis of work
done of individual items and rates quoted against those particular items only.
(31) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in the
Narmada Water Resources, Water Supply &Kalpsar Dept. Resolution No. GEN-2010-
595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be
recovered from the running bills of the work from time to time and remaining
amount if any shall be recovered from the final bill before releasing the security
deposit of the work.The contractor shall furnish the statement showing the quantity
of quarried materials / minerals from whom purchased ( with full address of the
seller) and copies of the bills for purchase to the Executive Engineer of the in charge
of the work. The contractor shall also furnish such additional information as regards
royalty payment to the competent authority.
(32) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall be
rest with the agency and required amount shall be recovered from any due amount
(33) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(34) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the state
of Gujarat. For arriving at the difference in procurement prices due to introduction
of GST it will be open for the Board to ask for original invoices, lorry receipt, weigh
bridge slips, payment details and such other documents as may be required for the
(35) The claim of contractor regarding GST shall have to be backed by documentary
evidence substantiating the actual payment of tax duly certified by the competent
tax authority. The final decision regarding the quantum of claim amount to be
recovered or reimbursed shall be of the competent authority of the GWSSB and shall
be binding on the contractor.
Signature of contractor Executive Engineer
P.H.WorksDn, G.W.S.S.B
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB:Remaining Work OfCarrying out level Survey, Soil Investigation, Detailed Survey Work,
Designing etc for Lowering, Laying and Jointing PVC /G.I. Rising /Gravity Pipeline from
Village Level U/G Sump to Faliya, Designing and Constructing of RCC ESR / UGS/ Cistern
at Faliya Level and Pumping Machinery & Supply, Installation, Testing & Commissioning of
Pumping Machineries at Existing U/G Sump etc. under Faliya Connectivity of
KanjetaPiperoWater Supply Scheme including Operation & Maintenance (For 24 Months).
Tal:-DevgadhBaria, Dhanpur, Dist.:-Dahod, Gujarat.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of the
above Contract, we the undersigned offer to design, Engineer, procure, construct,
complete, commission, operate and maintain the whole of the said works for 5 years
from the date of commissioning including defects liability period as given in Conditions
of Contract and in conformity with the drawings, conditions of Contract, specifications,
Nos.__________ (insert numbers) for Lump sum fixed price of
for Construction includingfree trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer‟s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the
inspectionand testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by
the Engineer‟s representative.
c) if we fail to deliver pure water of required quantity according to
theconditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance
with the Contract within _________ months, inclusive of monsoons, from the date or
receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of submission
of the bill and it shall remain binding upon us and may be accepted at any time before
the expiry of that period.
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but until
such agreement is prepared this Bid together with your written acceptance thereof
shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of
value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely to
be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
NAME OF SCHEME –Remaining/Incomplete Work OfFaliya Connectivity of DDSA Package-
5 (Part-2) KanjetaPipero RWSS including Operation & Maintenance For 24 Months For
Existing Work & This Tender Scope Work
TALUKA: DevgadhBaria, Dhanpur DIST.: Dahod
Remaining/Incomplete Work Of Carrying out level Survey, Soil Investigation, Detailed
Survey Work, Designing etc for Lowering, Laying and Jointing PVC /G.I. Rising /Gravity
Pipeline from Village Level U/G Sump to Faliya, Designing and Constructing of RCC ESR /
UGS/ Cistern at Faliya Level, Repairing of Existing ESR /Storage and Pumping Machinery&
Supply, Installation, Testing & Commissioning of Pumping Machineries at Existing U/G
Sump etc. under Faliya Connectivity of DDSA Pkg-5 (Part-2) KanjetaPiperoWater Supply
Scheme including Operation & Maintenance (For 24 Months)For Existing Work & This Tender
Scope Work. Tal:-DevgadhBaria, Dhanpur Dist.:-Dahod, Gujarat.
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be
Sr. Particular Qty. Rate at which the Place of
No. material will be Delivery
1 90 mm dia 6 kg/sqcm. 16800 139 RMT
2 110 mm dia 6 kg/sqcm. 13800 199 RMT
3 125 mm dia 6 kg/sqcm. - 263 RMT
4 140 mm dia 6 kg/sqcm. 1800 326 RMT
5 160 mm dia 6 kg/sqcm. - 420 RMT
6 90 mm dia 10 kg/sqcm. 31438 213 RMT
7 110 mm dia 10 kg/sqcm. 1380 320 RMT
8 125mm dia 10 kg/sqcm. - 412 RMT
9 140 mm dia 10 kg/sqcm. 840 513 RMT
10 160 mm dia 10 kg/sqcm. - 672 RMT
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in
by the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his
own cost for loading, unloading, and transporting safety to the site of work the cement
stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
4. All the materials required for the items other than labour in Schedule-A but available
with the dept. will be issued on request to the contractor. (for use in this contract only)
at prevailing market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the deptt. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness
and soundness by the contractor before taking the delivery of the materials from the
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule
are filled up by the Executive Engineer, on the issue of form prior to the submission of
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor
Deputy Executive Engineer Deputy Executive Engineer
P. H. Mech. Sub Dn., G.W.S.S.B P. H. Sanitary Sub Dn., G.W.S.S.B
Limkheda Limkheda
Executive Engineer Executive Engineer
P. H. Mech.Dn., G.W.S.S.B P. H. Works Dn., G.W.S.S.B
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey
Contract on EPC basis, the provision of measurement will be applicable only for the
assessment of value of work done for inclusion in any interim certificate for part payment to
the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B,
based on the Employer's best appreciation of the value of the component as related to the
total costs of the concerned item as whole. A head titled (any other item(s)) is included in
each breakdown of schedule and the tenderer shall at the time of tendering indicate any
additional items which he considers necessary but cannot be covered by any of the heads
indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to
the tenderer‟s scheme and design and he should take this into account while quoting his lump
sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used
for assessment of percentage progress of the component at any stage. By measurement
jointly taken by the Employer's Representative and the Contractor, mutually agreed and
entered in the measurement books in the form and by the method approved by the
Employer's Representative, and signed jointly by both the parties.
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
a. On receipt of materials at project site 65 % of Quoted rate
b. On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c. On Hydraulic testing 5 % of Quoted rate
d. On refilling and disposal of surplus stuff 5 % of Quoted rate
e. After commissioning 5 % of Quoted rate
a. On receipt of materials on site 70 % of Quoted rate
b. On erection 20 % of Quoted rate
c. On Hydraulic testing 5 % of Quoted rate
d. After commissioning 5 % of Quoted rate
3 GROUND (UNDERGROUND) LEVEL SERVICE
RESERVOIRS/SUMPS
a. On approval of designs 2 % of Quoted rate
b. On completion of excavation and base slab 18 % of Quoted rate
c. On completion of vertical wall and braces 20 % of Quoted rate
d. Full supporting structure including column, ring beam 15 % of Quoted rate
and completion of top slab / dome
e. Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
f. Procurement and fixing of inlet, outlet, washout, 15 % of Quoted rate
overflow pipes, valves, specials, chambers, lighting
arrester conductor and specials at site
g. Water level indictor, painting of letters, M.S 10 % of Quoted rate
ladder,pipes, railing and all miscellaneous items such
asexterior whether proof emulsion paint in three coats
etc (Completed with allrespect) including water
h. On hydraulic testing 10 % of Quoted rate
4 All Electro-mechanical works and Instrumentation
Mini Scheme, Micro Scheme, Solar Machinery,
Pumping Machinery
a. On supply of material at work site in good condition 65% of Quoted rate
b. On erection of Equipment 25% of Quoted rate
c. On completion of Testing & Commissioning of 5% of Quoted rate
d. Satisfactory running of system. 5% of Quoted rate
A On completion works as per approved drawings 95% of Quoted rate
B After commission of system 5% of Quoted rate
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
5 Elevated Storage Reservoir
a. On submission of Designs 2.5% of Quoted rate
b. On approval of Designs 2.5% of Quoted rate
c. On Completion of excavation &Upto Ground Level 7.5% of Quoted rate
d. On completion of staging height up to reservoir 22.5% of Quoted rate
e. On Completion of Floor Reservoir 22.5% of Quoted rate
f. On Completion of walls of Reservoir 22.5% of Quoted rate
g. On Completion of Roof of reservoir with all related 20.0% of Quoted rate
piping and other works including Water level indictor,
painting of letters, M.S ladder, pipes, railing and all
miscellaneous items such as exterior whether proof
emulsion paint in three coats etc (Completed with all
respect) including water tightness test
On Completion of excavation &Upto Ground Level 12.5% of Quoted rate
On completion of staging height up to reservoir 22.5% of Quoted rate
On Completion of Floor Reservoir 22.5% of Quoted rate
On Completion of walls of Reservoir 22.5% of Quoted rate
On Completion of Roof of reservoir with all related 20.0% of Quoted rate
piping and other works including Water level indictor,
painting of letters, M.S ladder, pipes, railing and all
miscellaneous items such as exterior paint in three
coats etc (Completed with all respect) including water
7 Miscellaneous work
A All other items such as Cattle Trough, Encasing, 80% of quoted rate on
columns support for culvert, pipe bridges for Canal completion of works
/Drain/Khadi crossing, internal roads,
railway/highway crossing, Anchor/thrust blocks, steel
bridge for pipe crossing, etc
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
B On commissioning of the system 20% of quoted rate
8 Operation and Maintenance
a Every month in equal instalment based on quoted
prices of O & M will be paid
For Operation of Pumping Machinery at Village/ Faliya level, Agency has to Provide the
Manpower as and when required & instructed by EIC. The payment for that shall be paid to the
Agency as per minimum Labour Wages Act and declaration by Labour Commissioner for that
Particular Month.
(NOTE:- Agency has to Produce all the relevant documents for reimbursement of Payment.)
Note: Any Changes to be made in all above Payment Schedule can be decided by Chief
Engineer, Zone-1, Vadodara and it shall be binding to the contractor.
Volume-III, PRICE BID KanjetaPiperoFaliya Connectivity
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4. Insurance-GR.pdf
6. Labour cess GR.pdf
9 .I.P Address GR.pdf
10. Submission of Doc GR.pdf
DMO_2941_01-Apr-2026_744.pdf
1. VOL. 1A Technical Bid PKG-5 Part-2 Final 2207.pdf
2. VOL. 1B GCC Part-1 20.02.2026.pdf
3. VOL. IB GCC Part-2 20.02.2026.pdf
4. VOL. IB GCC Part-3 20.02.2026.pdf
5. VOL. IB GCC Part-4 20.02.2026.pdf
6. VOL. IB GCC Part-5 20.02.2026.pdf
7. Vol. IB Part -7 Circular 10 Excess.pdf
8.Changes in tender clause_Circular_11022021.pdf
9.Cir for inviting tenders at estimated rates without GST (1).pdf
10.GST Corrigendum 17.12.21 final.pdf
11.Ammendent.pdf
12.GWSSB GST Paripatra 36 dt 07-01-22_0001 (1).pdf
13.Price variation for Excess extra_30112021_220110_122504.pdf
14.Running Tender Corrigendum.pdf
15.Tender change.pdf
DDSA PKG 5 Estimate Part-2 for 2207.pdf
VOL 2A Extent of work 20.02.2026.pdf
VOL 2B Tech Spec Civil 20.02.2026.pdf
Vol 2C Tech Spec Mech. 20-02-2026.pdf
VOL 2D Tech Data.pdf
DDSA PKG - 5 PART 2_merged.pdf
Kanjeta.pdf
pipero.pdf
1 VOL III- Price-Bid For Upload 20.02.2026.pdf
VOL 5 A OandM MECHANICAL 20.02.2026.pdf
VOL 5 B OandM CIVIL 20.02.2026.pdf
DDSA PKG-5 PART-2 Structural Drawing.pdf
DDSA PKG-5 PART-2 PHOTOGRAPHS_compressed (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].