Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.6 LAdmitted-Finance | -5.44% | ₹52.6 L | L1 | Admitted-Finance |
| 2 | L2₹55.0 L+₹2.5 L (4.70%)Admitted-Finance | -1.00% | ₹55.0 L+₹2.5 L (4.70%) | L2 | Admitted-Finance |
| 3 | L2₹55.0 L+₹2.5 L (4.70%)Admitted-Finance | -1.00% | ₹55.0 L+₹2.5 L (4.70%) | L2 | Admitted-Finance |
| 4 | L3₹56.1 L+₹3.6 L (6.81%)Admitted-Finance | +1.00% | ₹56.1 L+₹3.6 L (6.81%) | L3 | Admitted-Finance |
Tender Value
₹55.6 L
EMD Value
₹1.3 L
Closing Date
20 May 2026, 5:00 pmClosed
DIRECTOR(H)
SECTOR-39, NOIDA
M/o Green Belt (Repairing and Raising Boundry Wall and P/F Grill at Boundry wall of Green Belt along Road No-6 infront of Sector-64), Noida
2026_NOIDA_1146222_1
01/D(H)//DD(H)-I/2026-27
Open Tender
Civil Works - Others
Fixed-rate
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.3 L
11 Jun 2026
7 May 2026
21 May 2026
7 May 2026
20 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In Cement mortar | 129.03 | Cum | 779.76 | ₹1,00,612.43 |
| 2 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured From brick work in cement mortar | 12.75 | Per Thousand | 2,569.38 | ₹32,759.6 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 56 | cum | 144.95 | ₹8,117.2 |
| 4 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & Cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of work | 5.6 | Cum | 5,820 | ₹32,592 |
| 5 | Brick work with available common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) Bricks shell be supplied as per department | 25.81 | Cum | 2,262.51 | ₹58,395.38 |
| 6 | Brick Work with common burnt clay F.P.S.(non modular) Bricks of class designation 100 foundation and plinth in cement mortar 1:4 (1 Cement 6 Coarse sand ) | 6.64 | Cum | 5,214.8 | ₹34,626.27 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 150 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) (1 cement : 4 coarse sand) (Item No. 6.4.1/DSR-2018/P- 108) | 153.18 | Cum | 6,276.98 | ₹9,61,507.8 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-lll) : 3 graded stone aggregate 20 mm nominal size). | 78.83 | Cum | 8,444.41 | ₹6,65,672.84 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers | 428 | Sqm | 320.65 | ₹1,37,238.2 |
| 10 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1,377.38 | Sqm | 20.47 | ₹28,194.97 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
NITspecialconditions2026.pdf
Additional Documents • 2.52 MB
Capability.xls
Additional Documents • 0.04 MB
01td.pdf
Tender Documents • 5.70 MB
BOQ_2143418.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .