Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical L D A COLONY SUB E W S PADAV SECTOR KANPUR ROAD LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | Accepted-Technical All Document is correct |
| 2 | Accepted-Technical | Accepted-Technical All Document is correct |
| 3 | Accepted-Technical AURAIYA | Accepted-Technical All Document is correct |
| 4 | Not Admitted-Fee/PreQual/Technical 580 SHREE DAMUPRIYA SHIVPURI MARG ALAPUR PRAYAGRAJ UTTAR PRADESH | PRAYAGRAJ | UTTAR PRADESH | 211001 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.1 Cr
EMD Value
₹7.6 L
Closing Date
7 May 2026, 5:00 pmClosed
Deputy Director (Construction) MANDI PARISHAD
Naveen Mandi Sthal Jangi Road Mirzapur
Construction work on the access road from Savra Bharatpur Road passing through Risal Singhpur and the Ugapur East Scheduled Caste settlement up to Lal Samdha Dayashankar Mishra residence
2026_RKUMP_1136252_1
2026/28
Open Tender
Civil Works
Percentage
180 days
Savra Bharatpur
Construction work on the access road from Savra Bharatpur Road passing through Risal Singhpur and the Ugapur East Scheduled Caste settlement up to Lal Samdha Dayashankar Mishra residence
3 documents required · 3 mandatory
₹20,000
Deputy Director (Construction)
₹7.6 L
22 May 2026
18 Apr 2026
8 May 2026
18 Apr 2026
7 May 2026
18 Apr 2026
18 Apr 2026 - 7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth Work in cutting or in embankment in Ordianry/black cotton soil excavation to be the form of regular pits not exceeding ½ meter (20") in depth and earth work in embankment to be in 20cm (8") layers, including ramming and dressing the surface to required level and slopes and also including 1.5mm (5") lift and 30m (100") lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m (100') distance as directed by the E/I. | - | CUM | - | - |
| 1.02 | (GSB) Construction of granular sub-base by providing well graded material, mixing in a uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the disired density, complete as per technical specification clause 401 | - | CUM | - | - |
| 1.03 | Providing laying and compacting stone agregates 45-63 of water bound macadam specification including spreading in uniform thickness hand packing-rolling with3wheeledsteel/vibratory roller80-100 tones instagesto proper grade andcamber applying andbrooming requisite type of screening materials coursesandto fil-lup the interstices ofcourse agreegate watering and compacting tothe required density grading 2 as per technical specification clause405 | - | CUM | - | - |
| 1.04 | Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm) obtained from approved query sukrut to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming type 'B' screening materials to fill up the interstices of coarse aggregate, watering and compacting to the required denstity. as per Technical specification clause.4.7/405(3) As per Analysis | - | CUM | - | - |
| 1.05 | Providing and applying primer coat with bitumin emulsion (SS) on prepared surface of granular Base including clearing of road surface and and sprying primer at rate of 0.75 Kg/sqm ssing machenical means (MORD 502) As per Analysis | - | SQM | - | - |
| 1.06 | Providing and applying tack coat with bitumin VG-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (MORD 503) As per Analysis | - | SQM | - | - |
| 1.07 | Cleaning the existing W.B.M. surface and laying 2cm. Thick Premix carpet with appd. Grit (in ratio 1:2 with 10-16 mm & 16-22.4mm gauge with dalla Grit) and bitumen including neating the paint to required tamperature and mixing either in mixer or by hand including cartage of materials, maintenance of side, patries and watering them during operation including supply of all materials L.T.&P. required for proper completion of the work also including cost of maxphalt and back coat.As per Analysis | - | SQM | - | - |
| 1.08 | Cleaning the premix carpet surface and laying seal coat with 6 mm Grit, including supply of all materials, Labour, T&P etc. required for proper completion of work.As per Analysis | - | SQM | - | - |
| 1.09 | Brick adging on both side of rode m 150 8 cm wide 12 cm deep laid with mud mortar including all materail as per | - | KM | - | - |
| - | Supply and laying 350mm dia hume pipe | - | RM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.77 MB
Tendernotice_2.pdf
PDF • 3.70 MB
BOQ_2125684.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .