Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.9 LAccepted-AOC | ₹73.9 L | L1 | Accepted-AOC L1Bidder |
| 2 | L2₹88.7 LRejected-Finance SADGURU SMARAN H NO 1502 50 MADEL HOUSING BOARD THIVIM BARDEZ GOA | ₹88.7 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹93.0 LRejected-Finance | ₹93.0 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | rohidas vaigankar L2 | M/s. Bitcon L1 | jairaj CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil,silt, sand, clay, gravel moorum of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated submerged, foul conditions etc including pumping or bailing out water/ dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. backfilling the excavated earth to the extent required and disposing of the surplus excavated soil/ rock at specified areas and all lifts etc. as per specification and drawing and as directed by the Engineer in charge etc complete. | 1,032 | Cum | 200 ₹2.1 L | 214.5 ₹2.2 L | 350 ₹3.6 L |
| 2.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: a) Upto 2.5 meters long pile | 1,075 | Metre | 200 ₹2.1 L | 153.61 ₹1.7 L | 200 ₹2.1 L |
| 3.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) a) Upto 2.5 meters long pile | 946 | Metre | 220 ₹2.1 L | 228.75 ₹2.2 L | 170 ₹1.6 L |
| 4.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 154.8 | Cum | 1,250 ₹1.9 L | 1,658.3 ₹2.6 L | 2,650 ₹4.1 L |
| 5.00 | Centering & shuttering including Strutting, Propping & removal of forms for : a) Foundations, footings, bases for columns and mass concrete. | 2,064 | Sq.m | 300 ₹6.2 L | 325.61 ₹6.7 L | 520 ₹10.7 L |
| 6.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a) All works upto Plinth Level. | 851.4 | Cum | 7,108.96 ₹60.5 L | 5,504.96 ₹46.9 L | 6,623 ₹56.4 L |
| 7.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge a) 110MM dia | 154 | RM | 120 ₹18,480 | 275.87 ₹42,483.98 | 140 ₹21,560 |
Tender Value
₹92.4 L
EMD Value
₹1.8 L
Closing Date
20 Aug 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Improvement to nallah from Vishnu Kankonkar house to Pundalik Mashelkar house at Carturlim in V.P. Curca, Bambolim Talaulim in St. Andre Constituency.
2025_WRD_23936_1
6-9/WDI/WRD/ASW/2025-26/e-14/1
Open Tender
Miscellaneous Works
180 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.8 L
24 Apr 2026
23 Jul 2025
21 Aug 2025
23 Jul 2025
20 Aug 2025
23 Jul 2025
Amount
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil,silt, sand, clay, gravel moorum of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated submerged, foul conditions etc including pumping or bailing out water/ dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. backfilling the excavated earth to the extent required and disposing of the surplus excavated soil/ rock at specified areas and all lifts etc. as per specification and drawing and as directed by the Engineer in charge etc complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: a) Upto 2.5 meters long pile
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) a) Upto 2.5 meters long pile
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering & shuttering including Strutting, Propping & removal of forms for : a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a) All works upto Plinth Level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge a) 110MM dia
rohidas vaigankar (BID ID -51623)
jairaj CONSTRUCTION (BID ID -51714)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_24364.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid