| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹15,000 (0.07%)Admitted-Finance | ₹2.0 Cr+₹15,000 (0.07%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹75,000 (0.37%)Admitted-Finance | ₹2.0 Cr+₹75,000 (0.37%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMEER ALI N. L2 | Musthafa KT L1 | P.P. MEHABOOB L3 |
|---|---|---|---|---|---|---|
| 1.00Shornur Municipality - Waterbody Rejuvenation - Eruppe Pond at Kavalappara | ||||||
| 1.01 | 50.2.3.1 Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 600 | Hour | 345.54 ₹2,07,324 Lowest | 345.54 ₹2,07,324 Lowest | 445.54 ₹2,67,324 |
| 1.02 | OD191356/2025-2026 Desilting of Thodu using hydraulic excavator, depositing at bank, dressing etc. complete | 8,760 | cum | 120.62 ₹10,56,631.2 Lowest | 120.62 ₹10,56,631.2 Lowest | 120.62 ₹10,56,631.2 Lowest |
| 1.03 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 244.42 | cum | 257.63 ₹62,968.89 Lowest | 257.63 ₹62,968.89 Lowest | 257.63 ₹62,968.89 Lowest |
| 1.04 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 241.5 | cum | 131.02 ₹31,641.33 Lowest | 131.02 ₹31,641.33 Lowest | 131.02 ₹31,641.33 Lowest |
| 1.05 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 22.5 | cum | 7,932.89 ₹1,78,490.03 Lowest | 7,932.89 ₹1,78,490.03 Lowest | 7,932.89 ₹1,78,490.03 Lowest |
| 1.06 | 60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of engineer | 1,631.31 | cum | 3,993.46 ₹65,14,571.23 Lowest | 3,993.46 ₹65,14,571.23 Lowest | 3,993.46 ₹65,14,571.23 Lowest |
| 1.07 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 480.07 | Cum | 10,488.77 ₹50,35,396.26 Lowest | 10,488.77 ₹50,35,396.26 Lowest | 10,488.77 ₹50,35,396.26 Lowest |
| 1.08 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 36,005.62 | Kg | 112.43 ₹40,48,112.42 Lowest | 112.43 ₹40,48,112.42 Lowest | 112.43 ₹40,48,112.42 Lowest |
| 1.09 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.38 | Cum | 9,235.97 ₹2,25,200.66 Lowest | 9,235.97 ₹2,25,200.66 Lowest | 9,235.97 ₹2,25,200.66 Lowest |
Tender Value
₹2.5 Cr
Closing Date
25 May 2026, 5:00 pmClosed
Baiju T.P
Forest Industries Travancore Limited
Drinking Water Projects
2026_FITL_851686_1
FIT/CP-06/2026-27
Open Tender
Civil Works - Others
Item Rate
365 days
Shornur Muncipality
Refer Tender Document
8 documents required · 8 mandatory
₹8,850
Exempted
Forest Industries Travancore Limited
2 Jun 2026
18 May 2026
26 May 2026
18 May 2026
25 May 2026
18 May 2026
18 May 2026 - 20 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Shornur Municipality - Waterbody Rejuvenation - Eruppe Pond at Kavalappara | |||||
| 1.01 | 50.2.3.1 Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | Hour | - | - |
| 1.02 | OD191356/2025-2026 Desilting of Thodu using hydraulic excavator, depositing at bank, dressing etc. complete | - | cum | - | - |
| 1.03 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.4 | cum | - | - |
| 1.04 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | - | cum | - | - |
| 1.05 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.06 | 60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of engineer | 1 | cum | - | - |
| 1.07 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | - | - |
| 1.08 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | Kg | - | - |
| 1.09 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_1439062.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .