Tender Value
₹3.6 L
EMD Value
₹7,296
Closing Date
1 Oct 2026, 6:00 pm4d left
OFFICE OF THE DISTRICT SOIL WATER CONSERVATION O
OFFICE OF THE DISTRICT SOIL WATER CONSERVATION OFFICER BARAMULLA/BANDIPORA
LAYINGof crate wire protection Bunds at SHEERPORA PATTAN
2026_SWCD_326224_1
NIT07
Open Tender
Civil Works
Percentage
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
accounts officer
₹7,296
26 Sept 2026
26 Sept 2026
2 Oct 2026
26 Sept 2026
1 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means
in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil
Particulars No. Length (Rft.) Breadth (Rft.) Height (Rft.) Quantity (Cft)
crate bund 1 x 64.00' x 5.00' x 3.00' = 960.00 Cft.
AG crate bund 1 x 64.00' x 2.00' x 6.00' = 384.00 Cft. =
Total Quantity1344.00 Cft. or | 44.86 | CUM | 479 | ₹21,487.94 |
| 2 | Providing and laying of boulder apron laid in wire crates with 4 mm
dia Black Anealed wire in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with boulders weighing not less than 25 kg each as per drawing incl. cost of crate wire and incl all carraiges of material within a lead of 1 km with HL 50M
Particulars No. Length (Rft.) Breadth (Rft.) Height (Rft.) Quantity (Cft)
U/G TIER 1 x 80'x 5.00' x 3.00' = 1200
A/G TIER 1 x 80x 4 x 4 = 1280cft, AG Tier 2 64.00'×4×4=1024cft
Net qty after d/d of 15% voids= 2978Cft. or | 84.36 | Cum | 3,800 | ₹3,20,568 |
| 3 | Backfilling behind crate bund with nallah boulders incl carriage
and hl 50m.
RBM filling behind crate bund 0.5 x 64.00' x 3 x 8 = 768.00 cft = Total Quantity 768.00 Cft. Or | 23.7 | Cum | 960 | ₹22,752 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1103087.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .