Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | -29.00% | ₹4.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.0 L+₹68,042.33 (15.8%)Admitted-Fee/PreQual/Technical/Finance | -17.77% | ₹5.0 L+₹68,042.33 (15.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.1 L+₹78,100.24 (18.2%)Admitted-Fee/PreQual/Technical/Finance | -16.11% | ₹5.1 L+₹78,100.24 (18.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹5.3 L+₹98,094.87 (22.8%)Admitted-Fee/PreQual/Technical/Finance | -12.81% | ₹5.3 L+₹98,094.87 (22.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹5.9 L+₹1.6 L (36.5%)Admitted-Fee/PreQual/Technical/Finance | -3.08% | ₹5.9 L+₹1.6 L (36.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.1 L
EMD Value
₹12,120
Closing Date
20 Jul 2026, 4:00 pmClosed
Executive Engineer RandB Division Baramulla
Executive Engineer RandB Division Baramulla
Repairs / Renovation of Inspection Hut / ADDC residence at Baramulla
2026_PWDJK_315870_1
43/3818-27/2026-27/RnB/Bla Dated 13.07.2026
Open Tender
Civil Works
Percentage
210 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RandB Division Baramulla
₹12,120
27 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1 | Sqm | 12.49 | ₹12.49 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil : | 1 | Cum | 256.85 | ₹256.85 |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1 | Cum | 187.3 | ₹187.3 |
| 4 | Supply and filling of dry stone soling in foundation trenches/under floors tightly hand packed with hand ramming, dressing ,watering incld. carriage of material from source to site of work complete | 1 | Cum | 1,000 | ₹1,000 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 1 | Cum | 218.4 | ₹218.4 |
| 6 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 1 | sqm | 24.12 | ₹24.12 |
| 7 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil | 1 | Sqm | 91.75 | ₹91.75 |
| 8 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive | 1 | Cum | 189.2 | ₹189.2 |
| 9 | Supplying and filling in plinth with fine sand under floors including, watering,
ramming, consolidating and dressing complete. | 1 | Cum | 1,204.5 | ₹1,204.5 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) | 1 | Cum | 5,202.9 | ₹5,202.9 |
stage.html
html • 0.02 MB
finance_1026666.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_1026666.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .