Assistant Executive Engineer
Asst.Exe.Engineer,ISSD,Tvpm
GENERAL-Site Investigation -Construction of check dam in Neyyar river down stream of Aruvippuram bridge in Neyyatinkara LA Constituency in Trivandrum district-Investigation Work
2023_Irrig_607709_1
IRR/IA/TR/1730/2023_3_2_2/1
Open Tender
Civil Works - Others
Item Wise
120 days
Aruvippuram bridge
Please refer tender documents
10 documents required · 10 mandatory
₹555
Yes
₹5,112
Yes
31 Jan 2024
29 Sept 2023
12 Oct 2023
29 Sept 2023
9 Oct 2023
29 Sept 2023
Amount
Investigation work
60.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
60.11.2:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.5.b:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In Water
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
OD16066/2023-2024:Conducting topographic survey in river for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total Station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale ( plan, cross sections, longitudinal sections etc ), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of copies CD/DVD, 5 numbers of hard copies of print outa etc complete as per the direction of departmental officers at site ( outturn 6 hect/day)
OD16067/2023-2024:Conducting topographic survey in banks of river for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total Station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale ( plan, cross sections, longitudinal sections etc ), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of copies CD/DVD, 5 numbers of hard copies of print outa etc complete as per the direction of departmental officers at site ( outturn 3 hect/day)
Greeshma Nizy Eujine
Bidder Name
Hassan B K B
Greeshma Nizy Eujine
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_906440.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .