Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78,959Accepted-AOC AT BANJI POST BANJI DISTT RAMGARH JHARKHAND | BANJI | RAMGARH | JHARKHAND | L1 | Accepted-AOC due to L1 | |
| 2 | L2₹67,813+₹899 (1.34%)Rejected-Finance GROUND TOLA WARD NO 20 PANCH BENIPUR DARBHANGA 847103 BIHAR INDIA | BENIPUR | DARBHANGA | BIHAR | 847103 | L2 | Rejected-Finance due to L2 | |
| 3 | L3₹68,113+₹1,199 (1.79%)Rejected-Finance 15 NO KEDLA DIST RAMGARH JHARKHAND 825325 | KEDLA | RAMGARH | JHARKHAND | 825325 | L3 | Rejected-Finance due to L3 |
Tender Value
Refer Docs
Closing Date
10 Jan 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Engineer (Excv), Tapin North OCP
Project Engineer (Excv), Tapin North OCP, Hazaribagh Area
Complete overhauling of engine repairing of foundation and calibration of fuel pump of ACE 12 Te Crane at Tapin North OCP, Hazaribagh Area
2023_CCL_266467_1
PE(X)/Tapin (N)/OCP/NIT/22-23/97 Dated 02.01.2023
Open Tender
Excavation Department Work
Item Rate
7 days
Tapin North OCP
Please refer Tender documents.
2 documents required · 2 mandatory
1 Mar 2023
2 Jan 2023
11 Jan 2023
2 Jan 2023
10 Jan 2023
2 Jan 2023
2 Jan 2023 - 6 Jan 2023
Amount
Changing of piston with pin and lock
Changing of liners
Changing of main and big-end bearing (010 o/s)
Changing of CR bush and thrust washer
Changing of head valve.
Replacement of valve guide.
Replacement of piston rings
Changing of overhauling gasket
Changing of rocker arm and bush
Replacement of connecting rod bolt
Replacement of engine main and timing seal
Changing of filter kit
Supply of air compressor full kit
Changing and fitting of camshaft
Head machining and testing charges
Machining charges, alignment of engine, fitting of sleeves and crank grinding work.
Calibration of fuel pump.
Electrode for welding of engine mounting and exhaust muffler(Lomelt-201)
Grinding stone for surface finishing of welded portion 4”
Supervisor(Highly skilled)- 01 Person per shift x 04 Days
Welder(Skilled) – 01 Person per shift x 01 Day
Mechanic (skilled) – 01 Person per shift x 04 Days
Helper (unskilled) - 02 Person per shift x 04 Days
Total impact of GST for the purpose of CTC
DEBA ELECTRICAL ENTERPRISES
M S VIJAY CONTRACTOR SUPPLIER
stage.html
html • 0.04 MB
techsummary_275648.pdf
PDF • 0.16 MB
finsummary_275648.pdf
PDF • 0.34 MB
266467WO97.pdf
PDF • 0.41 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .