| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC | ₹12.4 L | L1 | Accepted-AOC AOC |
| 2 | l2₹12.8 LRejected-Finance | ₹12.8 L | l2 | Rejected-Finance L2 |
| 3 | L3₹14.9 LRejected-Finance | ₹14.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹15.1 LRejected-Finance | ₹15.1 L | L4 | Rejected-Finance L4 |
| 5 | L5₹15.4 LRejected-Finance NOT AVAILABLE | ₹15.4 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | S R CONTRACTORS L1 | M/S SAVERA BUILDCON L9 | M/S PRABHAT CONTRACTOR AND ENGINEERS L4 | M/S M W CONSTRUCTIONS L6 | M/S STAR BUILD SOLUTION L2 | Shah Alam L8 | R.A.V. BUILDERS AND CONSULTANT L7 | IQRAR AHMAD CONTRACTOR L3 | S S CONSTRUCTION COMPANY L5 | M/S DIVINE BLESSED ENTERPRISES L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 140.19 | CUM | 60 ₹8,411.40 | 60 ₹8,411.40 | 40 ₹5,607.60 | 57.12 ₹8,007.65 | 40 ₹5,607.60 | 57.8 ₹8,102.98 | 40 ₹5,607.60 | 90 ₹12,617.10 | 52.7 ₹7,388.01 | 60 ₹8,411.40 |
| 2.00 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 20.88 | CUM | 3,400 ₹70,992 | 5,800 ₹1.2 L | 4,800 ₹1.0 L | 4,889.49 ₹1.0 L | 5,200 ₹1.1 L | 5,068.32 ₹1.1 L | 4,500 ₹93,960 | 4,500 ₹93,960 | 4,621.17 ₹96,490.03 | 5,900 ₹1.2 L |
| 3.00 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 12 | CUM | 3,500 ₹42,000 | 5,600 ₹67,200 | 4,600 ₹55,200 | 4,849.99 ₹58,199.88 | 5,000 ₹60,000 | 4,907.73 ₹58,892.76 | 4,000 ₹48,000 | 4,000 ₹48,000 | 4,474.69 ₹53,696.28 | 5,700 ₹68,400 |
| 4.00 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 84.65 | CUM | 4,850 ₹4.1 L | 5,800 ₹4.9 L | 5,300 ₹4.5 L | 4,970.99 ₹4.2 L | 4,900 ₹4.1 L | 5,030.17 ₹4.3 L | 5,900 ₹5.0 L | 4,800 ₹4.1 L | 4,488.68 ₹3.8 L | 5,800 ₹4.9 L |
| 5.00 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 72.32 | SQM | 70 ₹5,062.40 | 100 ₹7,232 | 100 ₹7,232 | 86.85 ₹6,280.99 | 50 ₹3,616 | 87.89 ₹6,356.20 | 100 ₹7,232 | 90 ₹6,508.80 | 80.13 ₹5,795 | 100 ₹7,232 |
| 6.00 | Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | 82.98 | SQM | 350 ₹29,043 | 650 ₹53,937 | 500 ₹41,490 | 575.4 ₹47,746.69 | 450 ₹37,341 | 582.25 ₹48,315.11 | 250 ₹20,745 | 400 ₹33,192 | 530.87 ₹44,051.59 | 650 ₹53,937 |
| 7.00 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 13.17 | CUM | 5,800 ₹76,386 | 7,100 ₹93,507 | 6,300 ₹82,971 | 5,928.39 ₹78,076.90 | 6,200 ₹81,654 | 6,145.28 ₹80,933.34 | 6,800 ₹89,556 | 6,600 ₹86,922 | 5,603.05 ₹73,792.17 | 7,200 ₹94,824 |
| 8.00 | Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 8.15 | CUM | 5,800 ₹47,270 | 7,200 ₹58,680 | 6,400 ₹52,160 | 6,105.28 ₹49,758.03 | 6,600 ₹53,790 | 6,328.59 ₹51,578.01 | 7,000 ₹57,050 | 6,500 ₹52,975 | 5,770.18 ₹47,026.97 | 7,400 ₹60,310 |
| 9.00 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 5.7 | SQM | 50 ₹285 | 35 ₹199.50 | 41.65 ₹237.41 | 34.98 ₹199.39 | 20 ₹114 | 35.4 ₹201.78 | 30 ₹171 | 300 ₹1,710 | 32.27 ₹183.94 | 40 ₹228 |
| 10.00 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work | 15.4 | RM | 1,200 ₹18,480 | 1,500 ₹23,100 | 700 ₹10,780 | 1,571.76 ₹24,205.10 | 1,000 ₹15,400 | 1,590.45 ₹24,492.93 | 1,500 ₹23,100 | 500 ₹7,700 | 1,450.14 ₹22,332.16 | 1,500 ₹23,100 |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
2 Apr 2026, 5:00 pmClosed
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
Construction Of V.R.B At Km. 5.315 Of Dhakiya Dy. under Project M.G.C. Stage-II IN DIST MORADABAD
2026_UPIDC_1130901_11
09/EE/2025-26
Open Tender
Civil Works - Canal
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹36,000
11 May 2026
27 Mar 2026
3 Apr 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | |||||
| 2Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | |||||
| 3Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 4Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | |||||
| 5Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | |||||
| 6Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | |||||
| 7Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 8Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 9S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | |||||
| 10Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work | |||||
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.93 MB
TD11.pdf
Tender Documents • 2.70 MB
BOQ_2109874.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid