| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC LESS RATE |
| 2 | L2₹2.1 CrRejected-Finance NO 888 TVS TOLGATE TIRUCHIRAPPALLI 620 020 | TIRUCHIRAPPALLI | TAMIL NADU | 620020 | ₹2.1 Cr | L2 | Rejected-Finance MORE RATE |
| Sl No | Description | Qty | Unit | LRS AND CO H2 | R VELLAISAMY H1 |
|---|---|---|---|---|---|
| 1.00 | Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers | 41,877 | m² | 92.8 ₹38.9 L | 102.08 ₹42.7 L |
| 2.00 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 41,877 | m² | 29.6 ₹12.4 L | 32.56 ₹13.6 L |
| 3.00 | BC 30/40mm Thick (Grade-II) Using VG40 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 1,257 | m³ | 11,230 ₹1.4 Cr | 12,353 ₹1.6 Cr |
| 4.00 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads at 250gms per sqm. area, thickness of 2.5mm is exclusive of surface applied glass bonds as per IRC 35. The finished surface to be level, uniform and free streaks and holes etc., complete (as per MORTH & H specification No. 803) | 234 | m² | 890 ₹2.1 L | 979 ₹2.3 L |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
5 Feb 2026, 3:00 pmClosed
The Commissioner, Tiruchirappalli City Corporation
Bharathidasan Road, Cantonment, Trichy - 620 001
Restoration of BT Surface using CMP with paver finisher at Ward No.8, 9 10 and 11.
2026_MAWS_648857_1
TN 402/2025-26 PACK 11
Open Tender
Civil Works - Roads
90 days
WARD 8 9 10 11
BID DOC
3 documents required · 3 mandatory
₹10,000
₹2.3 L
16 Mar 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
BC 30/40mm Thick (Grade-II) Using VG40 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads at 250gms per sqm. area, thickness of 2.5mm is exclusive of surface applied glass bonds as per IRC 35. The finished surface to be level, uniform and free streaks and holes etc., complete (as per MORTH & H specification No. 803)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Package11.pdf
Tender Documents • 1.28 MB
BOQ_777859.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid